Third Notice | | 11/20/2009 | 11/12/2009 | | DONE |
|
|
|
|
Third Notice | | 11/2/2009 | 11/6/2009 | | DONE |
|
|
|
faxed, mailed and called
|
Telephone call | | | 11/6/2009 | | DONE |
Tisha Gallop
|
|
|
called and left vm for Larry Hansen need final values.
|
Third Notice | | 10/9/2009 | 10/23/2009 | | DONE |
|
|
|
faxed
|
Second Notice | | 9/15/2009 | 9/29/2009 | | DONE |
|
|
|
|
First Notice | | 9/11/2009 | 9/15/2009 | | DONE |
|
|
|
|
BLD-Final | 9/11/2009 | 9/11/2009 | 9/11/2009 | P | PASS |
Dave Hannah
|
|
|
jess Phone #: ###-#### ok for perm occ
|
FIRE-Alarm Testing | 9/11/2009 | 9/11/2009 | 9/11/2009 | P | PASS |
Forrest France
|
|
|
Inspection intended for a fire final. Fire life safety passed.
|
FIRE-Conference | 9/11/2009 | 9/11/2009 | 9/11/2009 | A | DONE |
Forrest France
|
|
|
On site review of project related fire life safety issues including fire sprinklers, suite addressing, fire extinguishers, occupant load signs, door hardware, and related trade permits.
|
Permanent Occupancy UNPAID FEE | | | 9/11/2009 | | DONE |
Tisha Gallop
|
|
|
|
BLD-Final | 9/8/2009 | 9/8/2009 | 9/9/2009 | P | NR |
Dave Hannah
|
|
|
jeff Phone #: ###-#### need fire finals
|
BLD-Final | 9/1/2009 | 9/2/2009 | 9/3/2009 | A | NR |
Dave Hannah
|
|
|
Jeff if possible later am Phone #: ###-#### needs other trades finaled first
|
FIRE-Conference | 8/10/2009 | 8/10/2009 | 8/10/2009 | P | DONE |
Forrest France
|
|
|
Regarding project related hood suppression permit work and location of the manual release.
|
BLD-Framing/Rough-in | 8/6/2009 | 8/7/2009 | 8/7/2009 | A | PASS |
Dave Hannah
|
|
|
Jeff Phone #: ###-####
|
Issue PAID IN FULL permit | | | 7/14/2009 | | |
|
|
|
|
Print Occupancy Form | | | 7/9/2009 | | DONE |
|
|
|
|
Print Occupancy Form | | | 7/9/2009 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/9/2009 | | DONE |
|
|
|
|
Telephone call | | | 7/9/2009 | | DONE |
Barbara Stitt
|
|
|
Called and left voice message for Larry Sundell that permit is ready and fees due///8:30am BAS
|
Telephone call | | | 7/9/2009 | | DONE |
Barbara Stitt
|
|
|
Called and spoke with Larry Hansen and told him that permit is ready & fees due-he wasn't happy with the sewer fees so I transfered him over to Bev Hall in Public Works to figure that part out///7-9-09 @ 9:15am BAS
|
Plan assigned to (CDM) | 7/2/2009 | 7/2/2009 | 7/8/2009 | | PASS |
Carl D Madsen
|
|
|
7/8/2009 16:31:54 CDM - activity updated through activity BLDA022 from case BLD09-01084.
|
Case Summary (BLD) | | | 7/8/2009 | | DONE |
|
|
|
|
Routing - FIRE | | | 7/8/2009 | | PASS |
|
|
|
Field Verify CDM
|
1st review completed | | | 7/8/2009 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/8/2009 | | DONE |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 7/6/2009 | | 7/8/2009 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PUBLIC WORKS | 7/2/2009 | | 7/6/2009 | | PASS |
Beverly Hall
|
|
|
|
Routing PW Sewer Rating | 7/6/2009 | | 7/6/2009 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Environmental | 7/6/2009 | | 7/6/2009 | | FAIL |
Walt Baumgartner
|
|
|
pre rinse sink prior to dishwasher and triple sink must both route thru proposed Thermaco Big Dipper grease trap unit, which must indirect waste to a floor sink. Walt checked w/ Plumbing Insp Bill Vandigrift and will contact Sundel Architecture for resubmitt.
|
Plan resubmittals received | | | 7/6/2009 | | |
Tisha Gallop
|
|
|
Received transmittal and two copies of P-1; inserted by LEG and plans taken to Walt Baumgartner.
|
Routing PW Environmental | 7/6/2009 | | 7/6/2009 | | PASS |
Walt Baumgartner
|
|
|
plan resubmit shows pre rinse sink and triple sink routed via indirect waste to Thermaco Big Dipper. OK
|
Plans ACCEPTED BY PLAN TECH | | | 7/2/2009 | | DONE |
Darla L Downs
|
|
|
Ok per Carl M to be a level 2 intake
|
Routing - Addressing | 7/2/2009 | | 7/2/2009 | | PASS |
April Wing
|
|
|
|
Application received | | 7/1/2009 | 7/1/2008 | | DONE |
Darla L Downs
|
|
|
|