Third Notice | | 3/9/2010 | 3/29/2010 | | DONE |
|
|
|
|
Third Notice | | 1/27/2010 | 2/24/2010 | | DONE |
|
|
|
e-mailed and called
|
Telephone call | | | 2/24/2010 | | DONE |
Tisha Gallop
|
|
|
called and left vm for Debbie on cell# need clarification of FV sent in.
|
Third Notice | | 1/3/2010 | 1/15/2010 | | DONE |
|
|
|
mailed and called
|
Telephone call | | | 1/15/2010 | | DONE |
Tisha Gallop
|
|
|
Called Deborah Matsuzawa/owner Shige and left vm need fv.
|
Second Notice | | 11/29/2009 | 12/29/2009 | | DONE |
|
|
|
|
First Notice | | 11/6/2009 | 11/24/2009 | | DONE |
|
|
|
|
Permanent Occupancy | | | 10/27/2009 | | DONE |
|
|
|
|
Permanent Occupancy | | | 10/27/2009 | | DONE |
|
|
|
|
BLD-Final | 10/23/2009 | 10/23/2009 | 10/24/2009 | P | PASS |
Dave Hannah
|
|
|
###-#### Annie
|
BLD-Framing/Rough-in | 10/23/2009 | 10/23/2009 | 10/23/2009 | A | PASS |
Dave Hannah
|
|
|
###-#### Annie
|
FIRE-Final Inspection | 10/23/2009 | 10/23/2009 | 10/23/2009 | P | PASS |
Forrest France
|
|
|
C/N items field verified for completion, fire life safety okay for final, lever hardware at the two back doors to be installed prior to final per plans and as discussed.
|
FIRE-Final Inspection | 10/22/2009 | 10/22/2009 | 10/22/2009 | P | FAIL |
Forrest France
|
|
|
See fire code review notes for details, noted missing max. occupant load sign, need to install two exit signs per approved drawings, provide two class K and one 2A10BC fire extinguishers and post as discussed, tenant addresses must match permit documents, tags at the hood suppression systems are missing, etc., discussed issues with the owner/operators on site.
|
BLD-Final | 10/20/2009 | 10/21/2009 | 10/22/2009 | P | NR |
Dave Hannah
|
|
|
debbie Phone #: ###-#### needs mec, plumb,and fire finals first
|
BLD-Framing/Rough-in | 10/12/2009 | 10/13/2009 | 10/13/2009 | P | CANC |
Dave Hannah
|
|
|
Debbie-inspection for counter please Phone #: ###-####
|
BLD-Framing/Rough-in | 9/23/2009 | 9/24/2009 | 9/25/2009 | P | PART |
Dave Hannah
|
|
|
Wes Phone #: ###-#### ok to cover patio walls
|
(F) Reprint permit | | | 9/15/2009 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 9/15/2009 | | DONE |
|
|
|
|
Plan assigned to (CDM) | 9/1/2009 | 9/1/2009 | 9/10/2009 | | PASS |
Carl D Madsen
|
|
|
9/10/2009 15:46:45 CDM - activity updated through activity BLDA022 from case BLD09-01127.
|
Routing - PLAN CHECK | 9/8/2009 | | 9/10/2009 | | PASS |
Carl D Madsen
|
|
|
|
Plan resubmittals received | | | 9/10/2009 | | |
Tisha Gallop
|
|
|
received three copies of plan sheets M0.0, M1.0; taken to Carl Madsen
|
Case Summary (BLD) | | | 9/10/2009 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/10/2009 | | |
|
|
|
|
Telephone call | | | 9/10/2009 | | DONE |
|
|
|
left message w bryan for ian at ###-#### - permit (plan mod) ready and fees given
|
Override - Parcel Holds | | | 9/10/2009 | | |
|
|
|
|
Routing - FIRE | 9/2/2009 | | 9/8/2009 | | PASS |
Scott Arellano
|
|
|
|
Telephone call | | | 9/2/2009 | | DONE |
|
|
|
Called Ean at signature engineering and left a message on his Cll phone indicating that they needed to address some code compliance issues. 9-2-09 CDM
|
Telephone call | | | 9/2/2009 | | DONE |
|
|
|
Called and talked to Chris Holladat at AHJ engineering about his attachment details ant that a concrete beam in located directly below one of the wall sections. 9-2-09 CDM
|
Plan Modification Accepted | | | 9/1/2009 | | |
Tisha Gallop
|
|
|
Plan modification accepted for Bld09-01127 (Shige Japanese Steakhouse) to enclose patio and add patio seating; submitted on plan sheet M1.0 and structural calculations; routed to Carl Madsen
|
BLD-Conference | 8/24/2009 | 8/24/2009 | 8/25/2009 | P | FAIL |
Dave Hannah
|
|
|
Wes Jones-to discuss patio please Phone #: ###-#### needs to go back to plan review
|
BLD-Conference | 8/21/2009 | 8/24/2009 | 8/24/2009 | A | CANC |
Dave Hannah
|
|
|
Wes Jones-to discuss patio please Phone #: ###-####
|
Meeting | | | 8/5/2009 | | DONE |
Tisha Gallop
|
|
|
tenant came into office and wanted to change GC out of La Sicila Construction into his own name to be the tenant/GC, see idaho GC form scanned into documents
|
Print Occupancy Form | | | 8/5/2009 | | DONE |
Tisha Gallop
|
|
|
|
Plan assigned to (CDM) | | | 7/16/2009 | | PASS |
Carl D Madsen
|
|
|
7/16/2009 15:05:34 CDM - activity updated through activity BLDA022 from case BLD09-01127.
|
Routing - Addressing | 7/8/2009 | | 7/16/2009 | | PASS |
Beverly Hall
|
|
|
|
Routing - FIRE | 7/15/2009 | | 7/16/2009 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans. Emailed Fire Code comments to architect. Final approval will be subject to satisfactory field inspection by the PDS Fire inspector.
|
Plan resubmittals received | | | 7/16/2009 | | |
Tisha Gallop
|
|
|
received two copies of sheet P1.1; taken to Carl Madsen
|
Routing - PUBLIC WORKS | 7/16/2009 | | 7/16/2009 | | PASS |
Beverly Hall
|
|
|
|
Routing PW Environmental | 7/16/2009 | | 7/16/2009 | | PASS |
Walt Baumgartner
|
|
|
Resubmittal sheets show big dipper electro mechanical grease abatement, OK.
|
1st review completed | | | 7/16/2009 | | FAIL |
|
|
|
Failed Public Works
|
Routing - PLAN CHECK | 7/16/2009 | | 7/16/2009 | | PASS |
Carl D Madsen
|
|
|
|
Case Summary (BLD) | | | 7/16/2009 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/16/2009 | | |
|
|
|
|
Print Occupancy Form | | | 7/16/2009 | | DONE |
Barbara Stitt
|
|
|
|
Telephone call | | | 7/16/2009 | | |
|
|
|
Called Angelino and told him that permit is ready and fees due. Also explained that we need a signature on the application that was originally submitted. I also made notes for him that his fire alarm values were going to have to be seperated out from his mechanical values before the end of the project. and if he has any questions he needs to contact his engineer///7-16-09 @4:15pm BAS
|
Permit Ready to Issue | | | 7/16/2009 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 7/16/2009 | | DONE |
Tisha Gallop
|
|
|
|
Routing - PLAN CHECK | 7/14/2009 | | 7/15/2009 | | PASS |
Carl D Madsen
|
|
|
|
Routing PW Sewer Rating | 7/9/2009 | | 7/14/2009 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - PUBLIC WORKS | | | 7/14/2009 | | FAIL |
Beverly Hall
|
|
|
Needs improved grease abatement. See WB's comments. bh
|
Routing PW Environmental | 7/9/2009 | | 7/10/2009 | | FAIL |
Walt Baumgartner
|
|
|
Shige Japanese Steak House in former Gino's Italian space. Existing passive trap inadequate. Called engineer of record and required upgrade to electro-mechanical trap. Required pre-rinse and triple sink route to new unit. Requested to copies of resubmitted plans sheets showing trap detail and plumbing plans.
|
Plans ACCEPTED BY PLAN TECH | | | 7/8/2009 | | DONE |
Alexandra L. DeYoung
|
|
|
|
Application received | | 7/8/2009 | | | |
|
|
|
|
Routing - PLAN CHECK | 9/2/2009 | | | | FAIL |
|
|
|
|