Permit Information
Permit NumberBLD09-01139
StatusFinaled
Name PAT SHALZ
Site Address 960 S BROADWAY AVE Unit: 305
Project NameUniversity Plaza 3rd floor
Customer Number 
ePlanReviewNo
Description
(B.A. Harris & Associates, P.A. - University Plaza - STE # 305) Permit is to remodel an existing 3,052 sqaure foot office space for new tenant. Approval per approved plans on file. Work to include: [construction and demolition of interior non-bearing walls to create two new offices and a 224 square foot conference room], relocating light fixtures (no new), relocating ducts and diffusers (no new), new doors and hardware, and interior finishes in compliance with chapter 8 of the 2006 IBC. This building is fully fire sprinklered any alterations or modifications to the sprinkler system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA #13 as regulated by the fire department. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 2/9/20102/4/2010 DONE
This permit finaled on the web by Larissa Keck
Third Notice 1/17/20101/27/2010 DONE
faxed
Second Notice 1/8/20101/12/2010 DONE
First Notice 11/30/200912/29/2009 DONE
Permanent Occupancy  11/20/2009 DONE
BLD-Final10/22/200910/23/200910/23/2009PPASS
DetailsJim Storey
matt Phone #: ###-#### final ok card on site.
FIRE-Final Inspection10/22/200910/23/200910/23/2009APASS
DetailsForrest France
Fire life safety finaled.
FIRE-Final Inspection10/23/200910/23/200910/23/2009APASS
DetailsForrest France
Reinspection for correction item passed.
FIRE-Final Inspection10/20/200910/20/200910/20/2009PFAIL
DetailsForrest France
Noted one missing fire alarm notification device at the short hall adjacent to the new conference room- appliance is detatched and wiring at the junction box is exposed. Remainder of fire life safety okayed.
BLD-Framing/Rough-in9/1/20099/1/20099/1/2009PPASS
DetailsJim Storey
MATT Phone #: ###-####
BLD-Framing/Rough-in8/4/20098/4/20098/4/2009PPASS
DetailsJim Storey
Matt Phone #: ###-####
Issue PAID IN FULL permit  7/23/2009 DONE
Plan assigned to (TLW)7/10/2009 7/13/2009 PASS
DetailsTim L. Woodard
7/13/2009 09:58:22 TLW - activity updated through activity BLDA022 from case BLD09-01139.
Routing - FIRE  7/13/2009 PASS
DetailsTim L. Woodard
Routing - PLAN CHECK7/13/2009 7/13/2009 PASS
DetailsTim L. Woodard
1st review completed  7/13/2009 DONE
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  7/13/2009 DONE
DetailsTim L. Woodard
Case Summary (BLD)  7/13/2009 DONE
DetailsTim L. Woodard
Print Occupancy Form  7/13/2009 DONE
Permit Ready to Issue  7/13/2009 DONE
DetailsBarbara Stitt
Telephone call  7/13/2009 DONE
DetailsBarbara Stitt
Called Pat Shaltz and left a voice message that permit is ready, fees due and need GC information///7-13-09 @ 3:10pm BAS
Telephone call  7/13/2009 DONE
DetailsBarbara Stitt
Called Kirk Morris and told him that permit is ready, fees due and need GC information///7-13-09 @ 3:20pm BAS
Plans ACCEPTED BY PLAN TECH  7/10/2009 DONE
Application received 7/9/20097/9/2009 DONE
DetailsAlexandra L. DeYoung