BLD-Final | 12/18/2009 | 12/21/2009 | 12/21/2009 | P | PASS |
Jim Storey
|
|
|
Steve Phone #: ###-####
|
DOC - Permit Finaled | 12/21/2009 | 12/21/2009 | 12/21/2009 | P | PASS |
Jim Storey
|
|
|
|
COD-Stop Work/Reinspection MOD | | 12/21/2009 | 12/21/2009 | | PASS |
Sarah Schafer
|
|
|
Approved per plans.
|
BLD-Framing/Rough-in | 11/17/2009 | 11/17/2009 | 11/17/2009 | A | PASS |
Jim Storey
|
|
|
firewall corections made ok at garage.
|
BLD-Energy code compliance | 11/9/2009 | 11/10/2009 | 11/10/2009 | A | PASS |
Jim Storey
|
|
|
Steve Phone #: ###-#### still need garage soffit fire walls insp.
|
BLD-Framing/Rough-in | 11/6/2009 | 11/9/2009 | 11/9/2009 | P | PART |
Jim Storey
|
|
|
Steve Phone #: ###-#### framing ok / garage needs 2 hr at drop soffits. ok to insulate.
|
BLD-Foundation | 9/10/2009 | 9/10/2009 | 9/10/2009 | P | PASS |
Jim Storey
|
|
|
Steve Phone #: ###-####
|
BLD-Footing | 9/8/2009 | 9/8/2009 | 9/8/2009 | P | PASS |
Jim Storey
|
|
|
steve Phone #: ###-####
|
Issue PAID IN FULL permit | | | 9/1/2009 | | DONE |
|
|
|
|
Telephone call | | | 8/14/2009 | | DONE |
|
|
|
lm for steve, permits ready fees given
|
Permit Ready to Issue | | | 8/14/2009 | | DONE |
|
|
|
|
Route to Impact Fee Review | 7/10/2009 | 7/15/2009 | 8/12/2009 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - PLANNING | 7/10/2009 | | 8/11/2009 | | PASS |
Perry Paine
|
|
|
The Design Rview apprval has expired.
|
Case Summary (BLD) | | | 8/11/2009 | | |
|
|
|
|
Inspection Record Card- Bld | | | 8/11/2009 | | |
|
|
|
|
1st review completed | | | 8/11/2009 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/11/2009 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 7/30/2009 | | 8/11/2009 | | PASS |
Carl D Madsen
|
|
|
|
Plan assigned to (CDM) | 7/10/2009 | 7/10/2009 | 8/4/2009 | | DONE |
Carl D Madsen
|
|
|
assigned /routed to pep
|
Routing - PLANNING | 7/29/2009 | | 8/4/2009 | | PASS |
Cody Riddle
|
|
|
A minimum 12' setback shall be provided to the second story from the side property line per CER/SMS.
Minimum was not provided. Called applicant on 8/4/09. SMS
|
Routing - PUBLIC WORKS | 7/29/2009 | | 7/30/2009 | | PASS |
Connie Baumgartner
|
|
|
|
Plan resubmittals received | | | 7/29/2009 | | |
|
|
|
received two copies of revised second floor plan; taken to Sarah Schafer
|
Routing - Addressing | 7/10/2009 | | 7/10/2009 | | PASS |
|
|
|
|
Application received | | 7/10/2009 | | | |
|
|
|
|