BLD-Final | 1/15/2010 | 1/19/2010 | 1/19/2010 | A | DONE |
Tony Young
|
|
|
Chris Phone #: ###-####
|
BLD-Final | 1/15/2010 | 1/15/2010 | 1/15/2010 | P | PASS |
Dave Hannah
|
|
|
chris Phone #: ###-####
|
DOC - Permit Finaled | 1/15/2010 | 1/15/2010 | 1/15/2010 | P | PASS |
Dave Hannah
|
|
|
|
Zoning Approval | 1/15/2010 | 1/15/2010 | 1/15/2010 | | DONE |
Matthew A Halitsky
|
|
|
|
BLD-Conference | 1/4/2010 | 1/5/2010 | 1/5/2010 | A | PART |
Tony Young
|
|
|
Christopher Phone #: ###-####,, new door placement ?s,, ok, will need electrical permit
|
BLD-Final | 1/4/2010 | 1/4/2010 | 1/4/2010 | P | NR |
Tony Young
|
|
|
Christopher Phone #: ###-#### conf only
|
BLD-Conference | 12/29/2009 | 12/29/2009 | 12/29/2009 | P | PART |
Tony Young
|
|
|
Christopher Phone #: ###-#### need to have electrical out to review changes also,, adding a door,, conf on final
|
Routing Walk-In (BLD) | 12/28/2009 | 12/28/2009 | 12/28/2009 | P | PASS |
Carl D Madsen
|
|
|
|
Case Summary (BLD) | | | 12/28/2009 | | DONE |
|
|
|
|
Zoning Approval | 12/1/2009 | 12/1/2009 | 12/1/2009 | | FAIL |
Matthew A Halitsky
|
|
|
Not ready for zoning final.
Owner to modify plans in office.
|
BLD-Final | 11/25/2009 | 11/25/2009 | 11/25/2009 | P | NR |
Dave Hannah
|
|
|
Chris ###-#### needs zoning final and nec final
|
BLD-Energy code compliance | 10/15/2009 | 10/16/2009 | 10/16/2009 | A | DONE |
Tony Young
|
|
|
|
BLD-Energy code compliance | 10/15/2009 | 10/15/2009 | 10/16/2009 | P | PASS |
Dave Hannah
|
|
|
jared Phone #: ###-####
|
BLD-Energy code compliance | 10/12/2009 | 10/13/2009 | 10/13/2009 | A | PART |
Tony Young
|
|
|
Jared Phone #: ###-#### need to insulate floor area,, need zoning still on changes
|
BLD-Framing/Rough-in | 10/9/2009 | 10/9/2009 | 10/9/2009 | P | PART |
Dave Hannah
|
|
|
jared Phone #: ###-#### ok to insulate needs seal package also still needs to change out windows or get zoning appr. has new plans with aproved changes dident look at old carport or house
|
Routing Walk-In (Zoning) | 10/7/2009 | 10/7/2009 | 10/7/2009 | A | PASS |
Matthew A Halitsky
|
|
|
|
Routing Walk-In (BLD) | 10/7/2009 | 10/7/2009 | 10/7/2009 | A | PASS |
Perry Paine
|
|
|
"10-7-2009 THIS PROJECT IS MODIFIED TO REFLECT THE ADDED ROOF STRUCTURE OVER THE PREVIOUS UPPER EXTERIOR STAIR LANDING BY REMOVING THE EXTEROR STAIR AND CREATING A NEW BALCONYALL PER NEW DRH09-00243 APPROVED BY MATHEW HALITSKY AND ALSO STATES THAT THE WINDOWS MUST BE SINGLE OR DOUBLE HUNG TO HAVE THE SAME DIRECTIONAL OPERATION AS THE EXISTING DWELLING. 10-7-2009 PEP.
|
Case Summary (BLD) | | | 10/7/2009 | | |
|
|
|
|
Inspection Record Card- Bld | | | 10/7/2009 | | |
|
|
|
|
BLD-Framing/Rough-in | 9/10/2009 | 9/11/2009 | 9/11/2009 | A | FAIL |
Tony Young
|
|
|
jared Phone #: ###-#### conf,, need mech permit,, need permit for carport,, need to get changes to plans approved,, size, add of windows, add of roof cover,, floor plan,, need readable plans,, need grade/drainage away plan by final
|
BLD-Foundation | 7/24/2009 | 7/24/2009 | 7/24/2009 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 7/24/2009 at 6:49:16 AM. Contact: ###-####.
|
BLD-Foundation | 7/23/2009 | 7/24/2009 | 7/24/2009 | A | CANC |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 7/23/2009 at 7:38:21 AM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Jul 24 2009 6:48AM.
|
BLD-Footing | 7/23/2009 | 7/23/2009 | 7/23/2009 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 7/23/2009 at 7:38:06 AM. Contact: ###-####. Footing ok.
|
BLD-Foundation | 7/21/2009 | 7/23/2009 | 7/22/2009 | A | CANC |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 7/21/2009 at 1:19:41 PM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Jul 22 2009 10:55AM.
|
BLD-Footing | 7/21/2009 | 7/22/2009 | 7/22/2009 | P | CANC |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 7/21/2009 at 1:19:13 PM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Jul 22 2009 10:54AM.
|
BLD-Footing | 7/21/2009 | 7/21/2009 | 7/22/2009 | P | CANC |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 7/21/2009 at 9:51:59 AM. Contact: ###-####. canc by contractor via phone
|
BLD-Foundation | 7/21/2009 | 7/22/2009 | 7/21/2009 | P | CANC |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 7/21/2009 at 9:52:21 AM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Jul 21 2009 1:17PM.
|
Telephone call | | | 7/17/2009 | | DONE |
|
|
|
customer here to pick it up
|
Permit Ready to Issue | | | 7/17/2009 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 7/17/2009 | | DONE |
Tisha Gallop
|
|
|
|
Plan assigned to (PEP) | 7/16/2009 | 7/16/2009 | 7/16/2009 | | PASS |
Perry Paine
|
|
|
7/16/2009 14:52:17 PEP - activity updated through activity BLDA022 from case BLD09-01163.
|
Routing Walk-In (BLD) | 7/14/2009 | 7/14/2009 | 7/16/2009 | P | DONE |
Perry Paine
|
|
|
7/16/2009 14:52:17 PEP - activity updated through activity BLDA022 from case BLD09-01163.
|
Case Summary (BLD) | | | 7/16/2009 | | |
|
|
|
|
Inspection Record Card- Bld | | | 7/16/2009 | | |
|
|
|
|
1st review completed | | | 7/16/2009 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/16/2009 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 7/13/2009 | 7/13/2009 | 7/14/2009 | P | DONE |
Tisha Gallop
|
|
|
7/14/2009 15:47:43 LEG - activity updated through activity BLDI252 from case BLD09-01163.
|
Routing - PUBLIC WORKS | 7/14/2009 | | 7/14/2009 | | PASS |
Connie Baumgartner
|
|
|
|
Case Summary (BLD) | | | 7/14/2009 | | DONE |
|
|
|
|
Routing Walk-In (PW Hillside) | 7/13/2009 | 7/13/2009 | 7/13/2009 | P | DONE |
Tisha Gallop
|
|
|
7/13/2009 15:42:16 LEG - activity updated through activity BLDI254 from case BLD09-01163.
|
Routing Walk-In (Zoning) | 7/13/2009 | 7/13/2009 | 7/13/2009 | P | PASS |
Matthew A Halitsky
|
|
|
|
Application/Plans DENIED | | | 7/13/2009 | | PASS |
|
|
|
need Public works routing completed.
|
Application received | | 7/13/2009 | | | |
|
|
|
|
Routing - PLANNING | 12/28/2009 | | | | PASS |
Sarah Schafer
|
|
|
Applicant requested removal of the retaining walls along the alley with existing fencing to remain, removal of one pergola, change the side window to a door with an adjacent fixed window. Historic Preservation has no concerns with these changes.
|