Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD09-01163
StatusFinaled
Name BORDERS CHRISTOPHER L
Site Address 406 W RESSEGUIE ST
Project Name 
Customer Number 
ePlanReviewNo
Description
** Modification to plans, no retaining wall to be installed, install door with sidelite on the west side and the elimination of a pergola.***"10-7-2009 THIS PROJECT IS MODIFIED TO REFLECT THE ADDED ROOF STRUCTURE OVER THE PREVIOUS UPPER EXTERIOR STAIR LANDING BY REMOVING THE EXTEROR STAIR AND CREATING A NEW BALCONYALL PER NEW DRH09-00243 APPROVED BY MATHEW HALITSKY AND ALSO STATES THAT THE WINDOWS MUST BE SINGLE OR DOUBLE HUNG TO HAVE THE SAME DIRECTIONAL OPERATION AS THE EXISTING DWELLING. 10-7-2009 PEP. This project is for the construction of a new 760s.f. 2-story accessory structure with R-1CH approved through DRH09-00152 by Mathew Halitsky. On the main level there is to be 380s.f. that includes a 1-car garage; with a counter and sink; a 1/2 bathroom (watercloset and sink only). The upper level with a counter and 2-conter sinks is accessed by an interior stair. All per the approved plans as marked and the plan review notes. pep
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/15/20101/19/20101/19/2010ADONE
DetailsTony Young
Chris Phone #: ###-####
BLD-Final1/15/20101/15/20101/15/2010PPASS
DetailsDave Hannah
chris Phone #: ###-####
DOC - Permit Finaled1/15/20101/15/20101/15/2010PPASS
DetailsDave Hannah
Zoning Approval1/15/20101/15/20101/15/2010 DONE
DetailsMatthew A Halitsky
BLD-Conference1/4/20101/5/20101/5/2010APART
DetailsTony Young
Christopher Phone #: ###-####,,
new door placement ?s,, ok, will need electrical permit
BLD-Final1/4/20101/4/20101/4/2010PNR
DetailsTony Young
Christopher Phone #: ###-####
conf only
BLD-Conference12/29/200912/29/200912/29/2009PPART
DetailsTony Young
Christopher Phone #: ###-####
need to have electrical out to review changes also,, adding a door,, conf on final
Routing Walk-In (BLD)12/28/200912/28/200912/28/2009PPASS
DetailsCarl D Madsen
Case Summary (BLD)  12/28/2009 DONE
Zoning Approval12/1/200912/1/200912/1/2009 FAIL
DetailsMatthew A Halitsky
Not ready for zoning final.

Owner to modify plans in office.
BLD-Final11/25/200911/25/200911/25/2009PNR
DetailsDave Hannah
Chris ###-#### needs zoning final and nec final
BLD-Energy code compliance10/15/200910/16/200910/16/2009ADONE
DetailsTony Young
BLD-Energy code compliance10/15/200910/15/200910/16/2009PPASS
DetailsDave Hannah
jared Phone #: ###-####
BLD-Energy code compliance10/12/200910/13/200910/13/2009APART
DetailsTony Young
Jared Phone #: ###-####
need to insulate floor area,, need zoning still on changes
BLD-Framing/Rough-in10/9/200910/9/200910/9/2009PPART
DetailsDave Hannah
jared Phone #: ###-#### ok to insulate needs seal package also still needs to change out windows or get zoning appr. has new plans with aproved changes dident look at old carport or house
Routing Walk-In (Zoning)10/7/200910/7/200910/7/2009APASS
DetailsMatthew A Halitsky
Routing Walk-In (BLD)10/7/200910/7/200910/7/2009APASS
DetailsPerry Paine
"10-7-2009 THIS PROJECT IS MODIFIED TO REFLECT THE ADDED ROOF STRUCTURE OVER THE PREVIOUS UPPER EXTERIOR STAIR LANDING BY REMOVING THE EXTEROR STAIR AND CREATING A NEW BALCONYALL PER NEW DRH09-00243 APPROVED BY MATHEW HALITSKY AND ALSO STATES THAT THE WINDOWS MUST BE SINGLE OR DOUBLE HUNG TO HAVE THE SAME DIRECTIONAL OPERATION AS THE EXISTING DWELLING. 10-7-2009 PEP.
Case Summary (BLD)  10/7/2009  
Inspection Record Card- Bld  10/7/2009  
BLD-Framing/Rough-in9/10/20099/11/20099/11/2009AFAIL
DetailsTony Young
jared Phone #: ###-####
conf,, need mech permit,, need permit for carport,, need to get changes to plans approved,, size, add of windows, add of roof cover,, floor plan,, need readable plans,, need grade/drainage away plan by final
BLD-Foundation7/24/20097/24/20097/24/2009PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 7/24/2009 at 6:49:16 AM. Contact: ###-####.
BLD-Foundation7/23/20097/24/20097/24/2009ACANC
DetailsDave Hannah
Scheduled by a contractor via Hello! on 7/23/2009 at 7:38:21 AM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Jul 24 2009 6:48AM.
BLD-Footing7/23/20097/23/20097/23/2009PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 7/23/2009 at 7:38:06 AM. Contact: ###-####. Footing ok.
BLD-Foundation7/21/20097/23/20097/22/2009ACANC
DetailsTony Young
Scheduled by a contractor via Hello! on 7/21/2009 at 1:19:41 PM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Jul 22 2009 10:55AM.
BLD-Footing7/21/20097/22/20097/22/2009PCANC
DetailsTony Young
Scheduled by a contractor via Hello! on 7/21/2009 at 1:19:13 PM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Jul 22 2009 10:54AM.
BLD-Footing7/21/20097/21/20097/22/2009PCANC
DetailsTony Young
Scheduled by a contractor via Hello! on 7/21/2009 at 9:51:59 AM. Contact: ###-####. canc by contractor via phone
BLD-Foundation7/21/20097/22/20097/21/2009PCANC
DetailsTony Young
Scheduled by a contractor via Hello! on 7/21/2009 at 9:52:21 AM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Jul 21 2009 1:17PM.
Telephone call  7/17/2009 DONE
customer here to pick it up
Permit Ready to Issue  7/17/2009 DONE
Details
Issue PAID IN FULL permit  7/17/2009 DONE
DetailsTisha Gallop
Plan assigned to (PEP)7/16/20097/16/20097/16/2009 PASS
DetailsPerry Paine
7/16/2009 14:52:17 PEP - activity updated through activity BLDA022 from case BLD09-01163.
Routing Walk-In (BLD)7/14/20097/14/20097/16/2009PDONE
DetailsPerry Paine
7/16/2009 14:52:17 PEP - activity updated through activity BLDA022 from case BLD09-01163.
Case Summary (BLD)  7/16/2009  
Inspection Record Card- Bld  7/16/2009  
1st review completed  7/16/2009 DONE
PLANS/APPL TAKEN TO FRONT DESK  7/16/2009 DONE
Routing Walk-In (BLD)7/13/20097/13/20097/14/2009PDONE
DetailsTisha Gallop
7/14/2009 15:47:43 LEG - activity updated through activity BLDI252 from case BLD09-01163.
Routing - PUBLIC WORKS7/14/2009 7/14/2009 PASS
DetailsConnie Baumgartner
Case Summary (BLD)  7/14/2009 DONE
Routing Walk-In (PW Hillside)7/13/20097/13/20097/13/2009PDONE
DetailsTisha Gallop
7/13/2009 15:42:16 LEG - activity updated through activity BLDI254 from case BLD09-01163.
Routing Walk-In (Zoning)7/13/20097/13/20097/13/2009PPASS
DetailsMatthew A Halitsky
Application/Plans DENIED  7/13/2009 PASS
need Public works routing completed.
Application received 7/13/2009   
Routing - PLANNING12/28/2009   PASS
DetailsSarah Schafer
Applicant requested removal of the retaining walls along the alley with existing fencing to remain, removal of one pergola, change the side window to a door with an adjacent fixed window. Historic Preservation has no concerns with these changes.