Permit NumberBLD09-01204
StatusFinaled
Name ESI
Site Address 1072 N LIBERTY ST
Project NameMulvaney MOB
Customer Number 
ePlanReviewNo
Description
(MULVANEY M.O.B. - 2nd & 3rd Floor Lobbies - Shell & Core Upgrade) Permit is to build out the second and third floor lobbies of the shell permit (BLD08-01210). Approval contingent on adhering to approved plans. Work to include: construction of interior non-bearing walls to define the second and third floor lobbies, installation of new lighting, new hi/low drinking fountains (one on each floor), new mechanical system, new doors and hardware, and interior finishes in compliance with chapter 8 of the 2006 IBC. This building is fully fire sprinklered any alterations or modifications to the sprinkler system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA #13 as regulated by the fire department. This permit does not allow occupancy, future permits will be required to occupy any portion of this building. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  3/22/2010  
Third Notice 12/9/200911/27/2009 DONE
Third Notice 11/20/200911/25/2009 DONE
faxed, mailed and called
Telephone call  11/25/2009 DONE
DetailsTisha Gallop
called and left vm for Janae/ESI need final values
Third Notice 10/25/200911/6/2009 DONE
faxed
Second Notice 10/9/200910/15/2009 DONE
First Notice9/17/20099/17/20099/29/2009 DONE
DetailsTom Arcoraci
FIRE-Final Inspection9/17/20099/17/20099/17/2009PPASS
DetailsForrest France
Corrections verified for compliance, EM lighting retest passed, fire life safety finaled.
BLD-Final9/17/20099/17/20099/17/2009PPASS
DetailsTom Arcoraci
joe Phone #: ###-####
DOC - Permit Finaled9/17/20099/17/20099/17/2009PPASS
DetailsTom Arcoraci
FIRE-Final Inspection9/15/20099/16/20099/17/2009AFAIL
DetailsForrest France
EM lights at both the second and third floor lobbies failed to function upon power loss.
BLD-Framing/Rough-in9/10/20099/11/20099/11/2009APART
DetailsJim Sly
joe - ceiling cover Phone #: ###-####
Talked to Joe and Ceiling Contr....Need Clips or spacer bars to restain ends of cross tees.... OK to install tile. Leave a few tiles out for Re-inspection.
BLD-Framing/Rough-in8/21/20098/21/20098/21/2009PPASS
DetailsMike Jordan
Joe Phone #: ###-####. Interior steel stud framing for walls and soffitt for lobbies on 2nd. and 3rd. floors only.
Issue PAID IN FULL permit  8/5/2009 DONE
Routing - PLAN CHECK7/20/2009 8/4/2009 PASS
DetailsTim L. Woodard
Project approved with comments. TLW
Plan assigned to (TLW)8/3/2009 8/4/2009 PASS
DetailsTim L. Woodard
8/4/2009 08:58:24 TLW - activity updated through activity BLDA022 from case BLD09-01204.
Routing - FIRE  8/4/2009 PASS
DetailsTim L. Woodard
Field Verify.
1st review completed  8/4/2009 DONE
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  8/4/2009 DONE
DetailsTim L. Woodard
Case Summary (BLD)  8/4/2009 DONE
DetailsTim L. Woodard
Inspection Record Card- Bld  8/4/2009 DONE
Details
Telephone call  8/4/2009 DONE
Details
left vm for john maulin at ###-#### - permit ready and fees given
Permit Ready to Issue  8/4/2009 DONE
Details
Plan assigned to (CDM)7/20/20097/20/20098/3/2009 DEFR
DetailsTim L. Woodard
Defered to Tim Woodard
Routing - PUBLIC WORKS7/23/2009 7/27/2009 PASS
DetailsBeverly Hall
Routing - Addressing7/24/2009 7/24/2009 PASS
DetailsApril Wing
Recd Pcfee & Taken To Pln CK  7/20/2009 DONE
DetailsTisha Gallop
Plans ACCEPTED BY PLAN TECH  7/20/2009 DONE
DetailsTisha Gallop
Application received 7/20/2009