Case Summary (BLD) | | | 3/22/2010 | | |
|
|
|
|
Third Notice | | 12/9/2009 | 11/27/2009 | | DONE |
|
|
|
|
Third Notice | | 11/20/2009 | 11/25/2009 | | DONE |
|
|
|
faxed, mailed and called
|
Telephone call | | | 11/25/2009 | | DONE |
Tisha Gallop
|
|
|
called and left vm for Janae/ESI need final values
|
Third Notice | | 10/25/2009 | 11/6/2009 | | DONE |
|
|
|
faxed
|
Second Notice | | 10/9/2009 | 10/15/2009 | | DONE |
|
|
|
|
First Notice | 9/17/2009 | 9/17/2009 | 9/29/2009 | | DONE |
Tom Arcoraci
|
|
|
|
FIRE-Final Inspection | 9/17/2009 | 9/17/2009 | 9/17/2009 | P | PASS |
Forrest France
|
|
|
Corrections verified for compliance, EM lighting retest passed, fire life safety finaled.
|
BLD-Final | 9/17/2009 | 9/17/2009 | 9/17/2009 | P | PASS |
Tom Arcoraci
|
|
|
joe Phone #: ###-####
|
DOC - Permit Finaled | 9/17/2009 | 9/17/2009 | 9/17/2009 | P | PASS |
Tom Arcoraci
|
|
|
|
FIRE-Final Inspection | 9/15/2009 | 9/16/2009 | 9/17/2009 | A | FAIL |
Forrest France
|
|
|
EM lights at both the second and third floor lobbies failed to function upon power loss.
|
BLD-Framing/Rough-in | 9/10/2009 | 9/11/2009 | 9/11/2009 | A | PART |
Jim Sly
|
|
|
joe - ceiling cover Phone #: ###-#### Talked to Joe and Ceiling Contr....Need Clips or spacer bars to restain ends of cross tees.... OK to install tile. Leave a few tiles out for Re-inspection.
|
BLD-Framing/Rough-in | 8/21/2009 | 8/21/2009 | 8/21/2009 | P | PASS |
Mike Jordan
|
|
|
Joe Phone #: ###-####. Interior steel stud framing for walls and soffitt for lobbies on 2nd. and 3rd. floors only.
|
Issue PAID IN FULL permit | | | 8/5/2009 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 7/20/2009 | | 8/4/2009 | | PASS |
Tim L. Woodard
|
|
|
Project approved with comments. TLW
|
Plan assigned to (TLW) | 8/3/2009 | | 8/4/2009 | | PASS |
Tim L. Woodard
|
|
|
8/4/2009 08:58:24 TLW - activity updated through activity BLDA022 from case BLD09-01204.
|
Routing - FIRE | | | 8/4/2009 | | PASS |
Tim L. Woodard
|
|
|
Field Verify.
|
1st review completed | | | 8/4/2009 | | DONE |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/4/2009 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 8/4/2009 | | DONE |
Tim L. Woodard
|
|
|
|
Inspection Record Card- Bld | | | 8/4/2009 | | DONE |
|
|
|
|
Telephone call | | | 8/4/2009 | | DONE |
|
|
|
left vm for john maulin at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 8/4/2009 | | DONE |
|
|
|
|
Plan assigned to (CDM) | 7/20/2009 | 7/20/2009 | 8/3/2009 | | DEFR |
Tim L. Woodard
|
|
|
Defered to Tim Woodard
|
Routing - PUBLIC WORKS | 7/23/2009 | | 7/27/2009 | | PASS |
Beverly Hall
|
|
|
|
Routing - Addressing | 7/24/2009 | | 7/24/2009 | | PASS |
April Wing
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/20/2009 | | DONE |
Tisha Gallop
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/20/2009 | | DONE |
Tisha Gallop
|
|
|
|
Application received | | 7/20/2009 | | | |
|
|
|
|