Third Notice | | 10/25/2009 | 10/27/2009 | | DONE |
|
|
|
|
Second Notice | | 9/15/2009 | 10/15/2009 | | DONE |
|
|
|
|
First Notice | 9/14/2009 | 9/14/2009 | 9/15/2009 | | DONE |
Mike Jordan
|
|
|
|
BLD-Final | 9/14/2009 | 9/14/2009 | 9/14/2009 | P | PASS |
Mike Jordan
|
|
|
Brandon Phone #: ###-####
|
DOC - Permit Finaled | 9/14/2009 | 9/14/2009 | 9/14/2009 | P | PASS |
Mike Jordan
|
|
|
Letter of completion issued.
|
BLD-Final | 9/10/2009 | 9/11/2009 | 9/14/2009 | A | CANC |
Mike Jordan
|
|
|
randy Phone #: ###-####
|
FIRE-Sprinkler Rough-in | 9/11/2009 | 9/11/2009 | 9/11/2009 | P | PASS |
Troy Cobbley
|
|
|
Wrong inspection type called in.
|
FIRE-Final Inspection | 9/11/2009 | 9/11/2009 | 9/11/2009 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed. Per Tim Woodard the racking permit has been received.
|
BLD-Final | 9/8/2009 | 9/9/2009 | 9/9/2009 | P | NR |
Mike Jordan
|
|
|
Randy Phone #: ###-####. Needs zoning and life/safety finals.
|
FIRE-Final Inspection | 9/9/2009 | 9/9/2009 | 9/9/2009 | P | FAIL |
Forrest France
|
|
|
Pending rack permit as previously noted.
|
FIRE-Conference | 9/2/2009 | 9/2/2009 | 9/2/2009 | P | DONE |
Troy Cobbley
|
|
|
I spoke to brandon about the need for a racking permit for the storage racks that exceed 8'-0" in height. I let him know that prior to any sign off on the cooler related BLD permit a racking permit will be required to be applied for.
|
BLD-Conference | 8/3/2009 | 8/4/2009 | 8/4/2009 | A | DONE |
Mike Jordan
|
|
|
randy Phone #: ###-####. Noted that condensor units on west side of bldg. are not shown on site plan. After discussion with plan review and design review, anew site plan must be submitted and approved showing the condensing units on west side of bldg. Contacted and left message with Randy with TVR.
|
Issue PAID IN FULL permit | | | 7/27/2009 | | |
Tisha Gallop
|
|
|
|
Plan assigned to (TLW) | 7/21/2009 | | 7/24/2009 | | PASS |
Tim L. Woodard
|
|
|
7/24/2009 14:06:43 TLW - activity updated through activity BLDA022 from case BLD09-01209.
|
Routing - PLAN CHECK | 7/21/2009 | | 7/24/2009 | | PASS |
Tim L. Woodard
|
|
|
Approved as submitted. TLW
|
Routing - FIRE | | | 7/24/2009 | | PASS |
Tim L. Woodard
|
|
|
|
1st review completed | | | 7/24/2009 | | DONE |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/24/2009 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 7/24/2009 | | DONE |
Tim L. Woodard
|
|
|
|
Routing - Erosion and Sediment | 7/24/2009 | | 7/24/2009 | | PASS |
Tim L. Woodard
|
|
|
Waiver letter accepted must comply with attached conditions. TLW
|
Inspection Record Card- Bld | | | 7/24/2009 | | DONE |
|
|
|
|
Telephone call | | | 7/24/2009 | | DONE |
|
|
|
left vm for dale binning at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 7/24/2009 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/21/2009 | | DONE |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/21/2009 | | DONE |
Tisha Gallop
|
|
|
|
Application received | | 7/21/2009 | | | |
|
|
|
|