Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD09-01210
StatusFinaled
Name SPRING CREEK CONTRACTORS
Site Address 604 N ALLUMBAUGH ST
Project NameDarigold
Customer Number 
ePlanReviewNo
Description
(DARIGOLD OFFICES - Mezzanine) Permit is to add enclosed offices on the existing mezzanine. Approval per approved plans on file. Work to include: construction of interior non-bearing walls to create two offices and a common entry, installation of new lighting less than 1 watt per square foot, relocate ducts and diffusers, new doors and hardware, and interior finishes in compliance with chapter 8 of the 2006 IBC. This building is fully fire sprinklered any alterations or modifications to the sprinkler system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA #13 as regulated by the fire department. A 20% increase to the accessibility standards is required on large tenant improvement project that will be submitted soon (per: Architect) **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  8/27/2019 DONE
Third Follow up  5/31/2011 DONE
DetailsTisha Gallop
received final value from Spring Creek Contractors on 5/27/11
Case Summary (BLD)  5/27/2011 DONE
DetailsTisha Gallop
Third Notice 8/17/20108/31/2010 DONE
mailed and called
Telephone call  8/31/2010 DONE
DetailsTisha Gallop
called Andy/Spring Creek Contractors cell phone and left vm need final values.
Third Notice 7/7/20108/4/2010 DONE
faxed(didn't go though) and mailed
Third Notice 6/9/20106/24/2010 DONE
faxed(didn't go through) mailed 6/29
Second Notice 5/21/20106/4/2010 DONE
First Notice5/3/20105/3/20105/11/2010 DONE
DetailsJim Storey
BLD-Final5/3/20105/3/20105/3/2010APASS
DetailsJim Storey
hardware corected to ok
DOC - Permit Finaled5/3/20105/3/20105/3/2010PPASS
DetailsJim Storey
BLD-Final4/21/20104/23/20104/23/2010ANR
DetailsJim Storey
need door hardware
FIRE-Final Inspection4/21/20104/21/20104/21/2010PFAIL
DetailsForrest France
Still missing approved hardware at three locations- see previous activity notes. Contacted operations manager regarding deficiencies.
BLD-Conference4/19/20104/20/20104/21/2010ACANC
DetailsJim Storey
BLD-Aging Inspection2/18/20102/18/20102/18/2010 PASS
DetailsTom Arcoraci
BLD-Aging Inspection12/4/200912/4/200912/4/2009 PEND
DetailsTom Arcoraci
needs fire final
BLD-Final8/19/20098/20/20098/20/2009ANR
DetailsDave Hannah
PJ Phone #: ###-#### needs fire final
FIRE-Final Inspection8/19/20098/19/20098/19/2009PFAIL
DetailsTroy Cobbley
Provide approved single action hardware on the three relocated doors.
BLD-Framing/Rough-in7/29/20097/29/20097/29/2009PPASS
DetailsJim Storey
p.j. Phone #: ###-####
Print Occupancy Form  7/28/2009 DONE
Details
Telephone call  7/28/2009 DONE
Details
t/c w clint kelly at ###-#### - permit ready and fees given
Permit Ready to Issue  7/28/2009 DONE
Details
Issue PAID IN FULL permit  7/28/2009 DONE
Plan assigned to (TLW)7/21/2009 7/27/2009 PASS
DetailsTim L. Woodard
7/27/2009 15:49:40 TLW - activity updated through activity BLDA022 from case BLD09-01210.
Routing - PLAN CHECK  7/27/2009 PASS
DetailsTim L. Woodard
Plans approved with comments in plan review report. TLW
Routing - FIRE  7/27/2009 PASS
DetailsTim L. Woodard
Field Verify
1st review completed  7/27/2009 PASS
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  7/27/2009 DONE
DetailsTim L. Woodard
Case Summary (BLD)  7/27/2009 DONE
DetailsTim L. Woodard
Routing - PUBLIC WORKS7/21/2009 7/23/2009 PASS
DetailsBeverly Hall
Bev signed and routed plans.
Routing - Addressing7/22/2009 7/22/2009 PASS
DetailsApril Wing
Application received 7/21/20097/21/2009 DONE
DetailsTisha Gallop
Plans ACCEPTED BY PLAN TECH  7/21/2009 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  7/21/2009 DONE
DetailsTisha Gallop