Second Notice | | 10/3/2010 | 10/7/2010 | | DONE |
|
|
|
|
First Notice | | 9/10/2010 | 9/23/2010 | | DONE |
|
|
|
|
Permanent Occupancy | | | 8/31/2010 | | |
|
|
|
|
BLD-Final | 8/26/2010 | 8/27/2010 | 8/27/2010 | A | PASS |
Tom Arcoraci
|
|
|
>> Inspection requested via web by Pam Bullock
|
FIRE-Final Inspection | 7/7/2010 | 7/8/2010 | 7/8/2010 | A | PASS |
Forrest France
|
|
|
Life safety passed per the scope of permit work.
|
BLD-Aging Inspection | 6/14/2010 | 6/14/2010 | 6/14/2010 | | PASS |
Tom Arcoraci
|
|
|
|
Zoning Approval | 6/3/2010 | 6/3/2010 | 6/3/2010 | | PASS |
Josh Wilson
|
|
|
|
FIRE-Conference | 4/14/2010 | 4/14/2010 | 4/15/2010 | P | DONE |
Forrest France
|
|
|
Regarding items per activity notes 3/29.
|
FIRE-Final Inspection | 3/29/2010 | 3/29/2010 | 3/29/2010 | A | NR |
Forrest France
|
|
|
Project is not in condition for final fire life safety at this time. Discussed general requirements with the owner including door hardware, building address, exit signs, location of fire extinguishers to be posted, and the new med gas closet (N2 and 02 only).
|
BLD-Aging Inspection | 2/22/2010 | 2/22/2010 | 2/22/2010 | A | DONE |
Forrest France
|
|
|
|
BLD-Other | 1/6/2010 | 1/6/2010 | 1/6/2010 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 1/6/2010 | 1/6/2010 | 1/6/2010 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Energy code compliance | 11/5/2009 | 11/6/2009 | 11/6/2009 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Framing/Rough-in | 11/4/2009 | 11/5/2009 | 11/5/2009 | A | PASS |
Tom Arcoraci
|
|
|
Troy Phone #: ###-####
|
BLD-Framing/Rough-in | 10/7/2009 | 10/7/2009 | 10/7/2009 | P | PART |
Tom Arcoraci
|
|
|
troy Phone #: ###-####
|
BLD-Foundation | 9/16/2009 | 9/17/2009 | 9/17/2009 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 9/16/2009 at 9:35:59 AM. Contact: ###-####.
|
BLD-Footing | 9/16/2009 | 9/16/2009 | 9/17/2009 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 9/16/2009 at 9:35:34 AM. Contact: ###-####.
|
Issue PAID IN FULL permit | | | 9/8/2009 | | DONE |
Tisha Gallop
|
|
|
|
Print Occupancy Form | | | 8/31/2009 | | DONE |
|
|
|
|
Telephone call | | | 8/31/2009 | | DONE |
|
|
|
Called Hill Construction and spoke with Stephanie and told her that permit is ready & fees due///8-31-09 @ 9:50am BAS
|
Routing - PLAN CHECK | 8/21/2009 | | 8/28/2009 | | PASS |
Sam Zahorka
|
|
|
|
Telephone call | | | 8/28/2009 | | DONE |
Sam Zahorka
|
|
|
Had a telephone converstion with the architect about the exterior Medical gas room. Exterior Medical Gas room is detailed on plans but not required due to the storage amounts of (O2) and (N) compressed gas will be below the permitted levels per the IFC. He stated the owner still wanted to construct as per the approved plans. SRZ
|
Case Summary (BLD) | | | 8/28/2009 | | DONE |
Sam Zahorka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/28/2009 | | DONE |
Sam Zahorka
|
|
|
|
Inspection Record Card- Bld | | | 8/28/2009 | | DONE |
|
|
|
|
Plan assigned to (SRZ) | 7/22/2009 | | 8/28/2009 | | PASS |
Sam Zahorka
|
|
|
8/28/2009 13:30:51 SRZ - activity updated through activity BLDA022 from case BLD09-01218.
|
Routing - PLAN CHECK | 8/14/2009 | | 8/21/2009 | | FAIL |
Sam Zahorka
|
|
|
Emailed corrections to the architect.
|
Plan resubmittals received | | | 8/21/2009 | | |
Tisha Gallop
|
|
|
received transmittal and two copies of sheets E0.0, E1.0, E2.0; inserted by arch. rep. and taken back to Sam Z.
|
Plan resubmittals received | | | 8/18/2009 | | |
Tisha Gallop
|
|
|
Received transmittal, response letter, and two copies of plan sheets A2.0, A2.1, A2.2, H1.0; inserted by arch. rep. and taken back to Sam Z.
|
Routing - FIRE | 8/11/2009 | 8/11/2009 | 8/14/2009 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
1st review completed | | | 8/14/2009 | | FAIL |
|
|
|
Failed Plan Check
|
Route to Impact Fee Review | 8/11/2009 | 8/14/2009 | 8/11/2009 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - PLAN CHECK | 7/30/2009 | | 8/11/2009 | | FAIL |
Sam Zahorka
|
|
|
Emailed Plan review comments/corrections to the architect. Routed to Fire.
|
Routing - PLANNING | 7/30/2009 | | 7/30/2009 | | PASS |
Josh Wilson
|
|
|
Josh Wilson DRH09-00095, Susan Riggs CUP08-00128
|
Routing - PLUMBING | 7/28/2009 | | 7/30/2009 | | PASS |
Bill VanDegrift
|
|
|
BILL r.p. to be provided with adiquate drainage to accept full discharge. additional cross connection protection may be required.
|
Routing - Erosion and Sediment | 7/27/2009 | | 7/28/2009 | | PASS |
Steven Webb
|
|
|
ESC09-00463 plan approved with attached conditions.
|
Routing - PUBLIC WORKS | 7/22/2009 | | 7/27/2009 | | PASS |
Beverly Hall
|
|
|
|
Routing PW Drainage | 7/24/2009 | | 7/27/2009 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Sewer Rating | 7/24/2009 | | 7/24/2009 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 7/23/2009 | | 7/23/2009 | | PASS |
April Wing
|
|
|
|
Routing - PLANNING Land Div | 7/22/2009 | | 7/22/2009 | | PASS |
Dave Abo
|
|
|
Lot 3 of Fikes Subdivision.
|
Plans ACCEPTED BY PLAN TECH | | | 7/22/2009 | | DONE |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/22/2009 | | DONE |
Tisha Gallop
|
|
|
|
Pending Assignment by JCM | 7/22/2009 | | 7/22/2009 | | BLDA |
John Menard
|
|
|
7/22/2009 13:40:52 JCM - activity updated through activity BLDA160 from case BLD09-01218.
|
Application received | | 7/22/2009 | | | |
|
|
|
|