Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD09-01219
StatusFinaled
Name EKC INC
Site Address 400 N BENJAMIN LN
Project NameADA COUNTY BENJAMIN CAMPUS
Customer Number 
ePlanReviewNo
Description
(ADA COUNTY BENJAMIN CAMPUS - PHASE III)(ADA COUNTY JUVENILE SERVICES) This permit is to remodel the remaining 9,799 sq. ft. area on the second floor and 440 sq. ft. on the first floor for a new Juvenile Services office area per approved plans and CZC09-00110. Work to include: [construction of interior non-bearing walls to create: fourteen offices, one break room, a reception and work room, four group rooms, two unisex accessible toilets, separate sex men's and women's restrooms, two waiting rooms, and a storage area], {construction of a new entrance including: new canopy, new elevator, new exterior door, new parking, and infill two existing exterior openings} installation of new lighting, new plumbing fixtures, new ducts and diffusers, new doors and hardware, new accessible sales and service counter, and interior finishes in compliance with chapter 8 of the 2006 IBC. This building is fully fire sprinklered any alterations or modifications to the sprinkler system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA #13 as regulated by the fire department. Any racking installed exceeding 8 ft. in height will require a separate racking permit. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 5/17/20105/25/2010 DONE
Third Notice 4/12/20105/3/2010 DONE
faxed
Third Notice 3/15/20103/29/2010 DONE
faxed
Second Notice 3/5/20103/10/2010 DONE
First Notice 2/22/20102/23/2010 DONE
Permanent Occupancy  2/12/2010 DONE
BLD-Final2/11/20102/11/20102/11/2010PPASS
DetailsMike Jordan
Joe Phone #: ###-####. Ok for perm occ. Will have final letter from special insp. agency scanned into permit.
FIRE-Final Inspection2/11/20102/11/20102/11/2010PPASS
DetailsTroy Cobbley
Life safety passed
BLD-Final2/3/20102/3/20102/3/2010PPART
DetailsMike Jordan
Joe Phone #: ###-####. ok for temp occ. Need final letter from special insp. agency , and fire/life/safety needs to perm.
FIRE-Final Inspection2/2/20102/3/20102/3/2010APART
DetailsTroy Cobbley
A temporary occupancy was given for the life safety with scotts permission until the elevator recall/fire alarm interconnections have been tested. Life safety will be ok to sign off when these devices and the fire alarm permit is finaled.
FIRE-Final Inspection2/1/20102/2/20102/3/2010AFAIL
DetailsTroy Cobbley
The exit signs/emergency lights need to be modified to match the revised layout.
Temporary Occupancy2/3/20105/4/20102/3/2010 DONE
DetailsAlexandra L. DeYoung
Zoning Approval2/3/20102/3/20102/3/2010 PASS
DetailsJosh Wilson
FIRE-Conference2/1/20102/1/20102/1/2010PDONE
DetailsTroy Cobbley
Joe and I went over exit sign/emergency light placement
BLD-Conference12/29/200912/30/200912/30/2009ADONE
DetailsMike Jordan
Joe Phone #: ###-####. Reviewed plans and spoke with contractor on infill for elevator shaft from cmu wall to elevator doors.
BLD-Framing/Rough-in12/1/200912/2/200912/2/2009APASS
DetailsMike Jordan
Joe Phone #: ###-####. Interior steel studs for elevator mech. room. (1hr.).
BLD-Framing/Rough-in10/20/200910/20/200910/20/2009PPART
DetailsMike Jordan
Joe Phone #: ###-####. Interior steel stud framed walls at 2nd. floor. No grid or hardlids or plumbing wall in between restrooms.
BLD-Foundation9/28/20099/28/20099/28/2009PPART
DetailsMike Jordan
Joe Phone #: ###-####Elevator pit. wip. Noted that job will have special insp.
Issue PAID IN FULL permit  9/2/2009 DONE
Plan assigned to (TLW)7/23/2009 8/13/2009 PASS
DetailsTim L. Woodard
8/13/2009 13:52:49 TLW - activity updated through activity BLDA022 from case BLD09-01219.
Routing - PLAN CHECK8/12/2009 8/13/2009 PASS
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  8/13/2009 DONE
DetailsTim L. Woodard
Case Summary (BLD)  8/13/2009 DONE
DetailsTim L. Woodard
Print Occupancy Form  8/13/2009 DONE
Permit Ready to Issue  8/13/2009 DONE
Telephone call  8/13/2009 DONE
Called Sam Burrows left message permit ready and fee given Also need GC # AND RP ///DLD
Routing - FIRE8/7/2009 8/12/2009 PASS
DetailsScott Arellano
Attached IFC comments to plans
1st review completed  8/12/2009 PASS
Case Summary (BLD)  8/7/2009 DONE
DetailsTim L. Woodard
Routing - PLAN CHECK7/28/2009 8/7/2009 PASS
DetailsTim L. Woodard
Routing - Design Review7/28/2009 7/28/2009 PASS
DetailsJosh Wilson
Josh Wilson - CZC09-00110
Routing - Erosion and Sediment  7/28/2009 PASS
DetailsSteven Webb
ESC09-00464 plan waiver approved with attached conditions.
Routing - PLANNING7/28/2009 7/28/2009 PASS
DetailsJosh Wilson
Josh Wilson
Routing PW Drainage7/24/2009 7/27/2009 PASS
DetailsBrian Murphy
Routing PW Street Lights7/27/2009 7/27/2009 PASS
DetailsHank Alarcon
Routing PW Sewer Rating7/27/2009 7/27/2009 PASS
DetailsConnie Baumgartner
Routing - PUBLIC WORKS7/23/2009 7/27/2009 PASS
DetailsBeverly Hall
Pending Assignment by JCB7/22/2009 7/23/2009 DONE
DetailsJason Blais
Routing - Addressing7/23/2009 7/23/2009 PASS
DetailsApril Wing
Intake Approval  7/22/2009 PASS
Plans ACCEPTED BY PLAN TECH  7/22/2009 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  7/22/2009 DONE
DetailsTisha Gallop
Application received 7/22/2009