Third Notice | | 5/17/2010 | 5/25/2010 | | DONE |
|
|
|
|
Third Notice | | 4/12/2010 | 5/3/2010 | | DONE |
|
|
|
faxed
|
Third Notice | | 3/15/2010 | 3/29/2010 | | DONE |
|
|
|
faxed
|
Second Notice | | 3/5/2010 | 3/10/2010 | | DONE |
|
|
|
|
First Notice | | 2/22/2010 | 2/23/2010 | | DONE |
|
|
|
|
Permanent Occupancy | | | 2/12/2010 | | DONE |
|
|
|
|
BLD-Final | 2/11/2010 | 2/11/2010 | 2/11/2010 | P | PASS |
Mike Jordan
|
|
|
Joe Phone #: ###-####. Ok for perm occ. Will have final letter from special insp. agency scanned into permit.
|
FIRE-Final Inspection | 2/11/2010 | 2/11/2010 | 2/11/2010 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
BLD-Final | 2/3/2010 | 2/3/2010 | 2/3/2010 | P | PART |
Mike Jordan
|
|
|
Joe Phone #: ###-####. ok for temp occ. Need final letter from special insp. agency , and fire/life/safety needs to perm.
|
FIRE-Final Inspection | 2/2/2010 | 2/3/2010 | 2/3/2010 | A | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given for the life safety with scotts permission until the elevator recall/fire alarm interconnections have been tested. Life safety will be ok to sign off when these devices and the fire alarm permit is finaled.
|
FIRE-Final Inspection | 2/1/2010 | 2/2/2010 | 2/3/2010 | A | FAIL |
Troy Cobbley
|
|
|
The exit signs/emergency lights need to be modified to match the revised layout.
|
Temporary Occupancy | 2/3/2010 | 5/4/2010 | 2/3/2010 | | DONE |
Alexandra L. DeYoung
|
|
|
|
Zoning Approval | 2/3/2010 | 2/3/2010 | 2/3/2010 | | PASS |
Josh Wilson
|
|
|
|
FIRE-Conference | 2/1/2010 | 2/1/2010 | 2/1/2010 | P | DONE |
Troy Cobbley
|
|
|
Joe and I went over exit sign/emergency light placement
|
BLD-Conference | 12/29/2009 | 12/30/2009 | 12/30/2009 | A | DONE |
Mike Jordan
|
|
|
Joe Phone #: ###-####. Reviewed plans and spoke with contractor on infill for elevator shaft from cmu wall to elevator doors.
|
BLD-Framing/Rough-in | 12/1/2009 | 12/2/2009 | 12/2/2009 | A | PASS |
Mike Jordan
|
|
|
Joe Phone #: ###-####. Interior steel studs for elevator mech. room. (1hr.).
|
BLD-Framing/Rough-in | 10/20/2009 | 10/20/2009 | 10/20/2009 | P | PART |
Mike Jordan
|
|
|
Joe Phone #: ###-####. Interior steel stud framed walls at 2nd. floor. No grid or hardlids or plumbing wall in between restrooms.
|
BLD-Foundation | 9/28/2009 | 9/28/2009 | 9/28/2009 | P | PART |
Mike Jordan
|
|
|
Joe Phone #: ###-####Elevator pit. wip. Noted that job will have special insp.
|
Issue PAID IN FULL permit | | | 9/2/2009 | | DONE |
|
|
|
|
Plan assigned to (TLW) | 7/23/2009 | | 8/13/2009 | | PASS |
Tim L. Woodard
|
|
|
8/13/2009 13:52:49 TLW - activity updated through activity BLDA022 from case BLD09-01219.
|
Routing - PLAN CHECK | 8/12/2009 | | 8/13/2009 | | PASS |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/13/2009 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 8/13/2009 | | DONE |
Tim L. Woodard
|
|
|
|
Print Occupancy Form | | | 8/13/2009 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/13/2009 | | DONE |
|
|
|
|
Telephone call | | | 8/13/2009 | | DONE |
|
|
|
Called Sam Burrows left message permit ready and fee given Also need GC # AND RP ///DLD
|
Routing - FIRE | 8/7/2009 | | 8/12/2009 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
1st review completed | | | 8/12/2009 | | PASS |
|
|
|
|
Case Summary (BLD) | | | 8/7/2009 | | DONE |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 7/28/2009 | | 8/7/2009 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - Design Review | 7/28/2009 | | 7/28/2009 | | PASS |
Josh Wilson
|
|
|
Josh Wilson - CZC09-00110
|
Routing - Erosion and Sediment | | | 7/28/2009 | | PASS |
Steven Webb
|
|
|
ESC09-00464 plan waiver approved with attached conditions.
|
Routing - PLANNING | 7/28/2009 | | 7/28/2009 | | PASS |
Josh Wilson
|
|
|
Josh Wilson
|
Routing PW Drainage | 7/24/2009 | | 7/27/2009 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Street Lights | 7/27/2009 | | 7/27/2009 | | PASS |
Hank Alarcon
|
|
|
|
Routing PW Sewer Rating | 7/27/2009 | | 7/27/2009 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - PUBLIC WORKS | 7/23/2009 | | 7/27/2009 | | PASS |
Beverly Hall
|
|
|
|
Pending Assignment by JCB | 7/22/2009 | | 7/23/2009 | | DONE |
Jason Blais
|
|
|
|
Routing - Addressing | 7/23/2009 | | 7/23/2009 | | PASS |
April Wing
|
|
|
|
Intake Approval | | | 7/22/2009 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/22/2009 | | DONE |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/22/2009 | | DONE |
Tisha Gallop
|
|
|
|
Application received | | 7/22/2009 | | | |
|
|
|
|