First Notice | | 6/6/2010 | 6/23/2010 | | DONE |
|
|
|
|
BLD-Final | 5/26/2010 | 5/27/2010 | 5/27/2010 | A | PASS |
Mike Jordan
|
|
|
ok for perm occ.
|
Permanent Occupancy UNPAID FEE | | | 5/27/2010 | | DONE |
|
|
|
|
FIRE-Final Inspection | 5/7/2010 | 5/10/2010 | 5/10/2010 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed.
|
BLD-Final | 5/6/2010 | 5/7/2010 | 5/7/2010 | A | PASS |
Mike Jordan
|
|
|
Rod Phone #: ###-####. ok for temp. occ. Open plumbing permit should be stand alone permit. Needs to complete firecaulking at riser room and repair the doorhardware at the pet salon.
|
Zoning Approval | 5/7/2010 | 5/7/2010 | 5/7/2010 | | PASS |
Josh Wilson
|
|
|
|
Temporary Occupancy UNPAID FEE | | | 5/7/2010 | | DONE |
|
|
|
|
FIRE-Final Inspection | 5/5/2010 | 5/6/2010 | 5/6/2010 | A | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given with Scott and Marks approval until the fire alarm permit for the new tamper switch on the anti-freeze loop has been finaled. The work has been scheduled for monday morning at 8:00am.
|
FIRE-Conference | 5/6/2010 | 5/6/2010 | 5/6/2010 | A | DONE |
Troy Cobbley
|
|
|
The property manager, Linda, contacted me about a temporary occupancy for this project until Monday due to SimpleGrinnell not being able to perform their work until that I deferred her to Mark Senteno for a decision.
|
FIRE-Final Inspection | 5/3/2010 | 5/4/2010 | 5/4/2010 | P | FAIL |
Troy Cobbley
|
|
|
The project related fire alarm permit needs to be finaled, verification of factory installed duct smoke detectors and the indicators installed on the main exit doors as discussed. The previous items have been corrected.
|
BLD-Final | 4/29/2010 | 4/30/2010 | 4/30/2010 | A | NR |
Mike Jordan
|
|
|
rod Phone #: ###-####. Also spoke to contractor about shell and core permit.
|
FIRE-Final Inspection | 4/28/2010 | 4/29/2010 | 4/29/2010 | P | FAIL |
Troy Cobbley
|
|
|
The project related fire alarm permit needs to be finaled. Also indicators and stickers need to be installed at the two sets of double main entry doors. The exit discharge light on the northwest exit door did not function.
|
FIRE-Conference | 4/14/2010 | 4/14/2010 | 4/14/2010 | P | DONE |
Troy Cobbley
|
|
|
I spoke with the job superintendant for CNI Construction about the need for an additional fire alarm permit for the connection of the canopy anti-freeze system control valve into the existing fire alarm system located at 104 Milwaukee. This fire alarm work is not covered under the new PetsMart fire alarm system. I let him know that I could not sign off on the building until this additional permit has atleast been submitted for review. He said he would let the associated parties know.
|
BLD-Other | 4/7/2010 | 4/8/2010 | 4/8/2010 | A | PASS |
Mike Jordan
|
|
|
rob - ceiling grid Phone #: ###-####. Reinspected grid ceiling. grid as installed per cisca 0-2 ok. Received letter from CASCO (architect of record) noting that CISCA 0-2 system is approved to be installed in leiu of the CICSCA3-4. Will have letter scanned into project.
|
BLD-Conference | 4/5/2010 | 4/5/2010 | 4/5/2010 | P | DONE |
Mike Jordan
|
|
|
Met on site with contractor to discuss ceiling grid issues. Will discuss with plan reviewer before proceeding further.
|
BLD-Framing/Rough-in | 3/31/2010 | 3/31/2010 | 3/31/2010 | P | FAIL |
Mike Jordan
|
|
|
Ceiling grid inspection please-Rod- Phone #: ###-####. Installed grid not per plan.
|
BLD-Energy code compliance | 3/1/2010 | 3/2/2010 | 3/2/2010 | A | PASS |
Mike Jordan
|
|
|
Rod Phone #: ###-####
|
BLD-Framing/Rough-in | 2/25/2010 | 3/1/2010 | 3/1/2010 | A | PASS |
Mike Jordan
|
|
|
ROD Phone #: ###-####. All interior steel stud framed walls and backing for ada elements, no grid. Also spoke to rod about 1hr. consttruction requirements for fire riser room.
|
BLD-Aging Inspection | 2/24/2010 | 2/24/2010 | 2/24/2010 | | PASS |
Mike Jordan
|
|
|
work is in progress on interior steel stud walls. Visited job site last week. Should be ready for framing inspection by early next week as per contractor.
|
Issue PAID IN FULL permit | | | 11/25/2009 | | DONE |
|
|
|
|
Print Occupancy Form | | | 11/23/2009 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/23/2009 | | DONE |
Barbara Stitt
|
|
|
|
Telephone call | | | 11/23/2009 | | DONE |
Barbara Stitt
|
|
|
Called Mark Bender at ###-#### and left a voice message that permit is ready, fees due and need GC/RCE #///11-23-09 @ 12:05pm BAS
|
Plan assigned to (CJW) | 8/14/2009 | 8/14/2009 | 11/20/2009 | | PASS |
Carl Westfall
|
|
|
11/20/2009 09:21:10 CJW - activity updated through activity BLDA022 from case BLD09-01275.
|
Routing - PLUMBING | 11/19/2009 | | 11/20/2009 | | PASS |
Bill VanDegrift
|
|
|
move WF-1 downstream of R.P..
|
Routing - PLAN CHECK | 11/20/2009 | | 11/20/2009 | | DONE |
Carl Westfall
|
|
|
Took drawings to the permits desk.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/20/2009 | | DONE |
|
|
|
|
Routing - FIRE | 11/16/2009 | | 11/19/2009 | | PASS |
Scott Arellano
|
|
|
Attached updated IFC comments to plans
|
Routing - PLAN CHECK | 11/19/2009 | | 11/19/2009 | | |
|
|
|
Sent back to Plumbing
|
Plan resubmittals received | | | 11/19/2009 | | DONE |
Tisha Gallop
|
|
|
received response to comments and two copies of plan sheets P1.1, P1.2, P2.0, P3.0, P3.1; taken to Carl Westfall
|
Routing - PLUMBING | 11/13/2009 | | 11/16/2009 | | FAIL |
Bill VanDegrift
|
|
|
still need all water in the treatment area, pet isolation, bathing, kennel areas,isolated with a R.P. hot and clod. Hot water can not recirculate from the pretected system to the unprotected system.
|
Routing - PLAN CHECK | 9/29/2009 | | 11/13/2009 | | PASS |
Carl Westfall
|
|
|
Drawings approved after resubmittal review.
|
Plan resubmittals received | | | 11/12/2009 | | |
Carl Westfall
|
|
|
received cover letter, 2 sets of A0.1, A1.0, A2.2, A6.0, A6.1, A8.0, A8.1, A8.4 - taken to carl westfall
|
Routing - PUBLIC WORKS | 10/6/2009 | | 10/7/2009 | | PASS |
Beverly Hall
|
|
|
|
Routing PW Environmental | 10/6/2009 | | 10/7/2009 | | PASS |
Walt Baumgartner
|
|
|
reviewed - West Boise Sewer Dist.
|
Routing - FIRE | 9/28/2009 | | 9/29/2009 | | FAIL |
Scott Arellano
|
|
|
Emailed and faxed updated review comments to architect (William Bandle).
|
Routing - PLUMBING | 9/25/2009 | | 9/28/2009 | | |
|
|
|
|
Routing - PLAN CHECK | 9/10/2009 | | 9/25/2009 | | FAIL |
Carl Westfall
|
|
|
Completed the 2nd plan review. Sent E-mail to the Architect listing the corrections needed.
|
Plan resubmittals received | | | 9/21/2009 | | |
Carl Westfall
|
|
|
Rec'd by mail response letter, door hardware info, and two copies of sheets; f1.0; a0.1; a2.0; a2.1; a2.2; a2.3; a3.0; a5.0; a6.0; a6.1; a6.2; a8.0; a8.1; a8.4; a9.0; a12.0; p0.1; p1.0; p1.1; p1.2; p2.0; p2.1; p3.0; p3.1; e0.1; e1.0- taken to Carl W.
|
Routing - PLANNING | 9/9/2009 | | 9/10/2009 | | PASS |
Josh Wilson
|
|
|
|
1st review completed | | | 9/10/2009 | | FAIL |
|
|
|
Failed Plumbing, Plan Check, Fire
|
Routing - PLAN CHECK | 9/8/2009 | | 9/9/2009 | | |
|
|
|
Sent to Planning
|
Routing - FIRE | 9/1/2009 | 9/1/2009 | 9/8/2009 | | FAIL |
Scott Arellano
|
|
|
Faxed and emailed resubmittal items to architect.
|
Route to Impact Fee Review | 9/1/2009 | 9/4/2009 | 9/2/2009 | | PASS |
Cindy M. Gould
|
|
|
Tenant improvement no impact fees
|
Routing - PLAN CHECK | 8/21/2009 | | 9/1/2009 | | FAIL |
Carl Westfall
|
|
|
The IBC plan review was started on August 24, 2009 and was finished on September 1, 2009. Revised drawings were required. See the plan review report.
|
Routing - PLUMBING | 8/17/2009 | | 8/21/2009 | | FAIL |
Bill VanDegrift
|
|
|
all water to fixtures in the treatment area must be protected by a reduced pressure zone backflow preventer (RP) located outside the treatment area. all water to the pet isolation, bathing, kennel areas must be protected by an r.p.. wp-1 will require an r.p. upstream.
|
Routing - PUBLIC WORKS | 8/14/2009 | | 8/17/2009 | | PASS |
Beverly Hall
|
|
|
|
Routing PW Sewer Rating | 8/17/2009 | | 8/17/2009 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Environmental | 8/17/2009 | | 8/17/2009 | | PASS |
Walt Baumgartner
|
|
|
Any silver bearing wastewater from xray room must be pretreated prior to discharge to District sewer system. Call ###-#### for guidance.
|
Routing - Addressing | 8/14/2009 | | 8/14/2009 | | PASS |
April Wing
|
|
|
|
Pending Assignment by JCB | 8/11/2009 | | 8/14/2009 | | DONE |
Darla L Downs
|
|
|
Assigned to Carl Westfall
|
Intake Approval | | | 8/11/2009 | | PASS |
|
|
|
Conducted follow-up plan intake meeting. Allowed project to be submitted for permit.
|
Application received | | 7/29/2009 | 7/29/2009 | | DONE |
Barbara Stitt
|
|
|
|
Intake Approval | | | 7/29/2009 | | FAIL |
|
|
|
NEED: 1) United Water fire flow; 2) Need Ceiling notes & details for CISCA 0-2; 3) Fire pump / riser room & construction details & door to exterior; 4) Automatic lighting control shutoff for tenant space > 5,000sq. ft.; 5) Heating & Cooling load calcs.
|