Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD09-01289
StatusFinaled
Name SAGE CONSTRUCTION
Site Address 308 S 24TH ST
Project NameBOISE RESCUE MISSION
Customer Number 
ePlanReviewNo
Description
(BOISE RESCUE MISSION) Permit is to remodel an existing office mezzanine. This mezzanine was originally finished under BLD99-01884. Approval contingent on adhering to the approved set of plans. Work to include: [construction of interior non-bearing walls to create four offices, a small hallway, and a open reception area], relocating lighting, relocating service sink, installation of a new accessible sink, relocating ducts and diffusers, new doors and hardware, and interior finishes in compliance with chapter 8 of the 2006 IBC. This building is fully fire sprinklered any alterations or modifications to the sprinkler system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA #13 as regulated by the fire department. Any racking installed exceeding 8 ft. in height will require a separate racking permit. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 11/14/200911/5/2009 DONE
First Notice10/29/200910/29/200911/4/2009 DONE
DetailsDave Hannah
BLD-Final10/28/200910/29/200910/29/2009APASS
DetailsDave Hannah
tim - please call 1/2 hr prior Phone #: ###-####
DOC - Permit Finaled10/29/200910/29/200910/29/2009PPASS
DetailsDave Hannah
FIRE-Final Inspection10/28/200910/28/200910/28/2009PPASS
DetailsForrest France
Fire life safety completed satisfactory.
BLD-Final9/21/20099/22/20099/22/2009APART
DetailsDave Hannah
tim - please call 1/2 prior Phone #: ###-#### ok to occ to upstairs area
FIRE-Final Inspection9/21/20099/21/20099/22/2009PPART
DetailsForrest France
Fire life safety for the second floor remodel is acceptable, final pending completion of the scope of work for the project attatched fire sprinkler permit which includes heads at a new freezer in the warehouse area not yet installed.
BLD-Other9/15/20099/16/20099/17/2009PPART
DetailsDave Hannah
tim - ceiling cover - please call 1/2 hr prior Phone #: ###-#### ok to cover ceiling
BLD-Framing/Rough-in8/28/20098/31/20098/31/2009PPASS
DetailsDave Hannah
Tim Opp-Please call at least 30 mins prior to inspection Phone #: ###-####
Issue PAID IN FULL permit  8/7/2009 DONE
Permit Ready to Issue  8/5/2009 DONE
Telephone call  8/5/2009 DONE
Called Sage Construction and spoke with Debbie-informaed her that permit is ready and fees due///8-5-09 @ 8:40am BAS
Routing - PLAN CHECK  8/4/2009 PASS
DetailsTim L. Woodard
Approved with comments. TLW
Plan assigned to (TLW)7/30/2009 8/4/2009 PASS
DetailsTim L. Woodard
8/4/2009 13:53:34 TLW - activity updated through activity BLDA022 from case BLD09-01289.
Routing - PUBLIC WORKS  8/4/2009 PASS
DetailsConnie Baumgartner
Bev Hall Signed plans 8-3-09. TLW
Routing - FIRE  8/4/2009 PASS
DetailsTim L. Woodard
Field Verify Compliance. TLW
1st review completed  8/4/2009 PASS
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  8/4/2009 DONE
DetailsTim L. Woodard
Case Summary (BLD)  8/4/2009 DONE
DetailsTim L. Woodard
Case Summary (BLD)  8/4/2009 DONE
DetailsTim L. Woodard
Inspection Record Card- Bld  8/4/2009 DONE
Routing - Addressing7/30/2009 7/31/2009 PASS
DetailsApril Wing
Routing PW Sewer Rating7/31/2009 7/31/2009 PASS
DetailsConnie Baumgartner
Plans ACCEPTED BY PLAN TECH  7/30/2009 DONE
ok to take in as a level 1 per Tim W.
Application received 7/30/2009