BLD-Final | 5/6/2010 | 5/7/2010 | 5/7/2010 | P | PASS |
Dave Hannah
|
|
|
david Phone #: ###-####
|
DOC - Permit Finaled | 5/7/2010 | 5/7/2010 | 5/7/2010 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 5/6/2010 | 5/7/2010 | 5/6/2010 | A | DONE |
Dave Hannah
|
|
|
David Phone #: ###-####--Per request of David Bowman
|
BLD-Grading Inspection | 5/6/2010 | 5/6/2010 | 5/6/2010 | P | DONE |
Terry Records
|
|
|
Final grading and drainage approved.
|
BLD-Final | 5/3/2010 | 5/4/2010 | 5/4/2010 | A | NR |
Dave Hannah
|
|
|
David Phone #: ###-#### needs hill side and fire sprink finals
|
BLD-Aging Inspection | 3/29/2010 | 3/29/2010 | 3/31/2010 | | PASS |
Dave Hannah
|
|
|
work in progress
|
BLD-Energy code compliance | 1/25/2010 | 1/26/2010 | 1/26/2010 | A | PASS |
Tom Arcoraci
|
|
|
DAvid Phone #: ###-####
|
BLD-Framing/Rough-in | 1/19/2010 | 1/20/2010 | 1/20/2010 | A | PASS |
Dave Hannah
|
|
|
David Phone #: ###-####
|
BLD-Framing/Rough-in | 1/14/2010 | 1/15/2010 | 1/15/2010 | A | FAIL |
Dave Hannah
|
|
|
David Phone #: ###-#### needs to install seal package for energy code before framing inspection also mec no oked for rough in city set of plans are wet and stuck in tube cant get them out esc also needs work site needs to be cleaned up mud cleaned off sidewalks road and gutters and drains need to be cleaned
|
BLD-Foundation | 10/19/2009 | 10/19/2009 | 10/19/2009 | P | PASS |
Dave Hannah
|
|
|
Santos Phone #: ###-####
|
BLD-Footing | 10/6/2009 | 10/7/2009 | 10/7/2009 | A | FAIL |
Dave Hannah
|
|
|
Phone #: ###-#### no soils signoff
|
PubWorks Subgrade Approval | 10/7/2009 | 10/7/2009 | 10/7/2009 | | DONE |
Terry Records
|
|
|
Subgrade for upper level footings approved by the geotechnical engineer.
|
BLD-Foundation | 9/17/2009 | 9/18/2009 | 9/18/2009 | A | PART |
Dave Hannah
|
|
|
Santos Phone #: ###-#### ok to pour basement walls
|
BLD-Foundation | 9/10/2009 | 9/10/2009 | 9/10/2009 | P | CANC |
Dave Hannah
|
|
|
santos Phone #: ###-####
|
BLD-Footing | 8/28/2009 | 8/31/2009 | 8/31/2009 | A | PASS |
Mike Jordan
|
|
|
Santos ###-####. Footings for basement walls only.
|
PubWorks Subgrade Approval | 8/31/2009 | 8/31/2009 | 8/31/2009 | | PART |
Terry Records
|
|
|
Subgrade for lower level footings approved by the geotechnical engineer. A separate approval letter will be required for the upper level footings.
|
Issue PAID IN FULL permit | | | 8/19/2009 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/14/2009 | | DONE |
|
|
|
|
Route to Impact Fee Review | 7/31/2009 | 8/5/2009 | 8/12/2009 | | PASS |
Cindy M. Gould
|
|
|
|
Inspection Record Card- Bld | | | 8/12/2009 | | DONE |
|
|
|
|
Plan assigned to (CDM) | 7/31/2009 | 7/31/2009 | 8/11/2009 | | PASS |
Carl D Madsen
|
|
|
8/11/2009 15:25:50 CDM - activity updated through activity BLDA022 from case BLD09-01294.
|
Routing - PLAN CHECK | 8/5/2009 | | 8/11/2009 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 8/10/2009 | | 8/11/2009 | | PASS |
Carl D Madsen
|
|
|
|
Case Summary (BLD) | | | 8/11/2009 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/11/2009 | | |
|
|
|
|
Routing - Erosion and Sediment | 8/7/2009 | | 8/10/2009 | | PASS |
Steven Webb
|
|
|
ESC plan approved with attached conditions. ESC09-00489
|
Routing - FIRE | 8/10/2009 | | 8/10/2009 | | PASS |
Scott Arellano
|
|
|
Bouder Heights subdivision #3. A fire sprinkler system is required for this structure; designed in accordance with NFPA 13D.
|
1st review completed | | | 8/10/2009 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLANNING | 8/7/2009 | | 8/7/2009 | | PASS |
David Moser
|
|
|
CFH09-00015
|
Routing - PUBLIC WORKS | 8/5/2009 | | 8/5/2009 | | PASS |
Beverly Hall
|
|
|
|
Routing PW Grading-Hillside | 7/31/2009 | | 8/5/2009 | | PASS |
Terry Records
|
|
|
Approved as Category 1
|
Application received | | 7/31/2009 | 7/31/2009 | | DONE |
Tisha Gallop
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/31/2009 | | |
Tisha Gallop
|
|
|
|
Routing - Addressing | 7/31/2009 | | 7/31/2009 | | PASS |
April Wing
|
|
|
|