BLD-Final | 12/3/2009 | 12/4/2009 | 12/4/2009 | P | PASS |
Dave Hannah
|
|
|
Johanna-Please call at least a half hour prior to inspection so she can meet ya there Phone #: ###-####
|
DOC - Permit Finaled | 12/4/2009 | 12/4/2009 | 12/4/2009 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Energy code compliance | 11/5/2009 | 11/6/2009 | 11/7/2009 | P | PASS |
Dave Hannah
|
|
|
johanna Phone #: ###-####
|
BLD-Framing/Rough-in | 11/5/2009 | 11/5/2009 | 11/5/2009 | P | PASS |
Dave Hannah
|
|
|
johanna Phone #: ###-#### ok top insulate
|
BLD-Framing/Rough-in | 10/23/2009 | 10/23/2009 | 10/24/2009 | P | CANC |
Dave Hannah
|
|
|
johanna Phone #: ###-#### shear ok to cover ext
|
BLD-Foundation | 9/21/2009 | 9/21/2009 | 9/22/2009 | P | PASS |
Dave Hannah
|
|
|
Brent Phone #: ###-####
|
BLD-Footing | 9/17/2009 | 9/17/2009 | 9/17/2009 | P | PASS |
Dave Hannah
|
|
|
Brent Phone #: ###-####
|
PubWorks Subgrade Approval | 9/16/2009 | 9/16/2009 | 9/16/2009 | | DONE |
Terry Records
|
|
|
Footing subgrade approved by the geotechnical engineer
|
Issue PAID IN FULL permit | | | 8/11/2009 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/10/2009 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 8/7/2009 | 8/7/2009 | 8/7/2009 | A | DONE |
Perry Paine
|
|
|
8/7/2009 15:05:25 PEP - activity updated through activity BLDA022 from case BLD09-01297.
|
Case Summary (BLD) | | | 8/7/2009 | | |
|
|
|
|
Inspection Record Card- Bld | | | 8/7/2009 | | |
|
|
|
|
1st review completed | | | 8/7/2009 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/7/2009 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 8/3/2009 | | 8/7/2009 | | PASS |
Perry Paine
|
|
|
Perry
|
Routing Walk-In (BLD) | 8/4/2009 | 8/4/2009 | 8/4/2009 | A | DONE |
Perry Paine
|
|
|
8/4/2009 08:23:49 PEP - activity updated through activity BLDI260 from case BLD09-01297.
|
Intake Approval | | | 8/4/2009 | | FAIL |
|
|
|
need foundation engineering and P W signoff
|
Routing Walk-In (PW Hillside) | 8/3/2009 | 8/3/2009 | 8/3/2009 | A | PASS |
Brian Murphy
|
|
|
A letter frm the applicant's geotechnical engineer indicating that the footing subgrade is acceptable must be approved by Public Works prior to scheuling an inspection.
|
Routing Walk-In (Zoning) | 8/3/2009 | 8/3/2009 | 8/3/2009 | A | PASS |
Colleen T Carroll
|
|
|
|
Routing Walk-In (Erosion) | 8/3/2009 | 8/3/2009 | 8/3/2009 | P | PASS |
Steven Webb
|
|
|
ESC plan waiver request approved with attached conditions. ESC09-00491
|
Application received | | 8/3/2009 | | | |
|
|
|
|