Third Notice | | 7/7/2010 | 6/29/2010 | | DONE |
|
|
|
|
Third Notice | | 6/9/2010 | 6/24/2010 | | DONE |
|
|
|
faxed
|
Second Notice | | 5/24/2010 | 6/4/2010 | | DONE |
|
|
|
|
First Notice | | 5/1/2010 | 5/14/2010 | | DONE |
|
|
|
|
Letter of compliance/Occupancy | | | 4/21/2010 | | DONE |
Barbara Stitt
|
|
|
|
Office final | | | 4/21/2010 | | DONE |
Barbara Stitt
|
|
|
Per Dave Hannah ok to Final
|
BLD-Final | 9/25/2009 | 9/28/2009 | 9/29/2009 | P | PASS |
Dave Hannah
|
|
|
Duane Amyx Phone #: ###-####
|
FIRE-Final Inspection | 9/25/2009 | 9/28/2009 | 9/28/2009 | A | PASS |
Forrest France
|
|
|
Correction notice items field verified, project related FIR permits okayed for final, fire life safety passed.
|
BLD-Final | 9/3/2009 | 9/4/2009 | 9/5/2009 | P | PART |
Dave Hannah
|
|
|
ok for temp occ
|
FIRE-Final Inspection | 9/3/2009 | 9/4/2009 | 9/4/2009 | A | PART |
Forrest France
|
|
|
Fire life safety at the remodel area approved for a temporary per M. Sentenno.
|
FIRE-Final Inspection | 9/2/2009 | 9/3/2009 | 9/3/2009 | A | CANC |
Forrest France
|
|
|
Overbooked
|
BLD-Other | 8/25/2009 | 8/26/2009 | 8/27/2009 | P | PART |
Dave Hannah
|
|
|
dick if possible later in the pm Phone #: ###-#### ceiling grid ok to cut in perm if ok with other trades
|
BLD-Framing/Rough-in | 8/20/2009 | 8/21/2009 | 8/21/2009 | P | PART |
Tony Young
|
|
|
Dick Phone #: ###-#### ok to cover walls approved by trades,, will fire block as needed at 10ft,, ok to one side other walls,, not much detail on plans,, some walls are existing
|
Issue PAID IN FULL permit | | | 8/13/2009 | | DONE |
|
|
|
|
Plan assigned to (TLW) | | | 8/12/2009 | | PASS |
Tim L. Woodard
|
|
|
8/12/2009 11:58:57 TLW - activity updated through activity BLDA022 from case BLD09-01301.
|
Routing - PLAN CHECK | 8/5/2009 | | 8/12/2009 | | PASS |
Tim L. Woodard
|
|
|
Approved as submitted. TLW
|
Routing - FIRE | | | 8/12/2009 | | PASS |
Tim L. Woodard
|
|
|
Field Verify
|
Routing - Erosion and Sediment | 8/12/2009 | | 8/12/2009 | | PASS |
Tim L. Woodard
|
|
|
Per form 707 sawcutting is not exceeding 40 lf. TLW
|
1st review completed | | | 8/12/2009 | | DONE |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/12/2009 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 8/12/2009 | | DONE |
Tim L. Woodard
|
|
|
|
Inspection Record Card- Bld | | | 8/12/2009 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/12/2009 | | DONE |
|
|
|
|
Telephone call | | | 8/12/2009 | | DONE |
|
|
|
Called left message with Jeff King permit ready and fee given also need GC
|
Routing PW Environmental | 8/5/2009 | | 8/5/2009 | | PASS |
Walt Baumgartner
|
|
|
okay - routing to existing grease lines per Terry Alber
|
Routing - PUBLIC WORKS | 8/5/2009 | | 8/5/2009 | | PASS |
Beverly Hall
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/4/2009 | | DONE |
|
|
|
|
Routing - Addressing | 8/4/2009 | | 8/4/2009 | | PASS |
April Wing
|
|
|
|
Application received | | 8/3/2009 | 8/3/2009 | | DONE |
Alexandra L. DeYoung
|
|
|
|