Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD09-01405
StatusFinaled
Name ROPER INVESTMENT COMPANY
Site Address 160 N 8TH ST
Project NamePampered Nails & Spa
Customer Number 
ePlanReviewNo
Description
(PAMPERED NAILS AND SPA - Capitol Terrace Building) Permit is to convert an existing 1,291square feet pet store (Charlie's Pet Boutique - MIS06-00179) into a nail salon. Approval per approved plans on file and attached mechanical engineering. Work to include: [construction of interior non-bearing steel stud walls to create VIP lounge area, a small water heater closet, and a back door vestibule], no new lighting, eight new sinks, new ducts and diffusers, new doors and hardware, and interior finishes in compliance with chapter 8 of the 2006 IBC. This building is fully fire sprinklered any alterations or modifications to the sprinkler system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA #13 as regulated by the fire department. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 2/16/20132/6/2013 DONE
Permanent Occupancy  2/6/2013 DONE
DetailsBarbara Stitt
BLD-Final2/4/20132/5/20132/5/2013APASS
DetailsDave Hannah
Per 410 Fire sprinkler and life safety finished - no card on site to sign- call if questions ###-####
FIRE-Final Inspection2/4/20132/4/20132/4/2013APASS
DetailsForrest France
Fire life safety final approved. No signature card on site.
Telephone call  2/1/2013  
FIR12-00754 issued 12/28/12 for Delta Fire Spriklers no ispections at this time
Telephone call  12/7/2012 DONE
DetailsBarbara Stitt
Per Ben, American Sprinkler should be submitting plans next week. 12-7-12 @ 9:40am//BAS
FIRE-Conference11/19/201211/20/201211/20/2012ADONE
DetailsForrest France
On site conference with tenant rep. regarding overspaced fire sprinkler coverage at one room. The posted fire extinguisher is overdue annual certification. Upon completion of C/N items, fire life safety can be passed.
BLD-Aging Inspection9/28/20129/28/201210/5/2012 PEND
DetailsDave Hannah
needs fire final
BLD-Aging Inspection4/23/20124/23/20125/1/2012 PASS
DetailsDave Hannah
BLD-Aging Inspection2/1/20122/1/20122/1/2012 DEFR
DetailsDave Hannah
sent to fire
BLD-Aging Inspection9/14/20119/14/20119/22/2011 DEFR
DetailsDave Hannah
sent to forest
BLD-Aging Inspection9/14/20119/14/20119/14/2011AFAIL
DetailsForrest France
Overspaced fire sprinklers at one area.
BLD-Aging Inspection7/15/20117/15/20117/15/2011PPEND
DetailsForrest France
Pending fire sprinkler work.
BLD-Aging Inspection7/15/20117/15/20117/15/2011 DEFR
DetailsDave Hannah
sent to fire
FIRE-Conference5/5/20115/5/20115/5/2011PDONE
DetailsForrest France
Conversation with tenant regarding spacing issues at fire sprinkler coverage.
BLD-Aging Inspection4/28/20114/28/20114/30/2011 FAIL
DetailsDave Hannah
needs fire finals
FIRE-Final Inspection4/28/20114/29/20114/28/2011AFAIL
DetailsForrest France
Fire sprinkler coverage at the VIP room is incorrectly spaced, fire extinguisher is overdue certification and needs posted as discussed.
BLD-Final2/17/20112/17/20112/17/2011PPASS
DetailsDave Hannah
ken Phone #: ###-#### ok for perm occ
BLD-Conference2/10/20112/10/20112/14/2011PCANC
DetailsDave Hannah
BLD-Aging Inspection2/8/20112/8/20112/10/2011 PART
DetailsDave Hannah
BLD-Aging Inspection12/7/201012/7/201012/8/2010 PASS
DetailsDave Hannah
BLD-Aging Inspection10/4/201010/4/201010/11/2010 DEFR
DetailsDave Hannah
Temporary Occupancy UNPAID FEE  9/22/2009 DONE
BLD-Final9/18/20099/21/20099/21/2009PPART
DetailsDave Hannah
ken Phone #: ###-#### ok for temp occ needs to resubmit plans that reflect what was built mainly no vip lounge
FIRE-Final Inspection9/18/20099/21/20099/21/2009AFAIL
DetailsForrest France
Correction items noted at the previous inspection are not done, project is not in condition for final at this time.
FIRE-Final Inspection9/16/20099/16/20099/16/2009ANR
DetailsForrest France
Space not ready for final inspection. Inspection correction items include the need for at least one fire extinguisher, and replacement of sticker on main exterior door signage indicating "Doors to be unlocked when building is occupied". Existing sticker is deteriorated.
BLD-Framing/Rough-in9/9/20099/10/20099/11/2009APART
DetailsDave Hannah
please call Ken ###-#### ok to cover front area area in back not framed and the owner now does no want to finish this area but leave it as is for now
Issue PAID IN FULL permit  9/3/2009 DONE
DetailsTisha Gallop
Print Occupancy Form  9/1/2009 DONE
Details
Permit Ready to Issue  9/1/2009 DONE
Telephone call  9/1/2009 DONE
called Ken permit ready and fee given
Plan assigned to (TLW)8/18/2009 8/31/2009 PASS
DetailsTim L. Woodard
8/31/2009 16:19:13 TLW - activity updated through activity BLDA022 from case BLD09-01405.
Routing - PLAN CHECK8/28/2009 8/31/2009 PASS
DetailsTim L. Woodard
Approved with redlines on plans. TLW
PLANS/APPL TAKEN TO FRONT DESK  8/31/2009 DONE
DetailsTim L. Woodard
Case Summary (BLD)  8/31/2009 DONE
DetailsTim L. Woodard
Plan resubmittals received  8/28/2009  
DetailsTisha Gallop
received two copies of sheet A1; taken to Tim Woodard
Routing - PLUMBING8/28/2009 8/28/2009 PASS
DetailsBill VanDegrift
per plans and 2003 upc
Routing - PLAN CHECK8/24/2009 8/26/2009 PASS
DetailsTim L. Woodard
Plans approved with redlines. TLW
1st review completed  8/26/2009 FAIL
DetailsTim L. Woodard
Failed Plumbing
Routing - FIRE  8/26/2009 PASS
DetailsTim L. Woodard
Field Verify. TLW
Plan Reviewer's activity  8/25/2009 DONE
DetailsTim L. Woodard
TI Level Changed to a level II vs. a level I. Due to change in reviewing depts. Mechanical and Plumbing are required to now review Nail Saloons. TLW
Routing - MECHANICAL8/21/2009 8/24/2009 PASS
DetailsTroy James
Routing - PLUMBING8/24/2009 8/24/2009 FAIL
DetailsBill VanDegrift
waste and water is undersized. water to pedicure ststions must be protected by an r.p.. isolate from potable water. show locations of waste terminations. show venting for indirect waste.
Routing - PUBLIC WORKS8/18/2009 8/21/2009 PASS
DetailsBeverly Hall
Routing - PLAN CHECK8/21/2009 8/21/2009 PEND
DetailsTim L. Woodard
routed to Mech. to review. TLW
Routing - Addressing8/20/2009 8/20/2009 PASS
DetailsApril Wing
Application received 8/18/20098/18/2009 FAIL
DetailsTisha Gallop
Plans ACCEPTED BY PLAN TECH  8/18/2009 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  8/18/2009 DONE
DetailsTisha Gallop
Routing - PLAN CHECK8/18/2009 8/18/2009 PEND
DetailsTim L. Woodard
Sent plans to public works for review. TLW