DOC - Permit Expired | 8/9/2010 | 8/9/2010 | 8/9/2010 | A | PASS |
Jim Storey
|
|
|
R105.5 Expiration. Every permit issued shall become invalid unless the work authorized by such permit is commenced within 180 days after its issuance, or if the work authorized by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. The building official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each. The extension shall be requested in writing and justifiable cause demonstrated.
R105.8 Responsibility. It shall be the duty of every person who performs work for the installation or repair of building, structure, electrical, gas, mechanical or plumbing systems, for which this code is applicable, to comply with this code.
|
BLD-Aging Inspection | 8/4/2010 | 8/4/2010 | 8/9/2010 | | PASS |
Jim Storey
|
|
|
R105.5 Expiration. Every permit issued shall become invalid unless the work authorized by such permit is commenced within 180 days after its issuance, or if the work authorized by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. The building official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each. The extension shall be requested in writing and justifiable cause demonstrated.
R105.8 Responsibility. It shall be the duty of every person who performs work for the installation or repair of building, structure, electrical, gas, mechanical or plumbing systems, for which this code is applicable, to comply with this code.
|
BLD-Aging Inspection | 5/31/2010 | 5/31/2010 | 6/8/2010 | | FAIL |
Jim Storey
|
|
|
no call for insp.
|
BLD-Conference | 6/3/2010 | 6/4/2010 | 6/8/2010 | P | FAIL |
Jim Storey
|
|
|
no call for insp,
|
BLD-Aging Inspection | 3/31/2010 | 3/31/2010 | 4/1/2010 | | PASS |
Jim Storey
|
|
|
|
BLD-Aging Inspection | 1/28/2010 | 1/28/2010 | 1/28/2010 | | NR |
Jim Storey
|
|
|
no callfor insp. ele ri action.
|
BLD-Aging Inspection | 11/24/2009 | 11/24/2009 | 11/24/2009 | | NR |
Jim Storey
|
|
|
no callfor insp. ele ri action.
|
Issue PAID IN FULL permit | | | 8/25/2009 | | DONE |
|
|
|
|
Plan assigned to (TLW) | 8/20/2009 | | 8/24/2009 | | PASS |
Tim L. Woodard
|
|
|
8/24/2009 10:32:16 TLW - activity updated through activity BLDA022 from case BLD09-01420.
|
Routing - PLAN CHECK | 8/20/2009 | | 8/24/2009 | | PASS |
Tim L. Woodard
|
|
|
Approved per structural engineering attached to plans. TLW
|
Routing - FIRE | | | 8/24/2009 | | PASS |
Tim L. Woodard
|
|
|
Field Verify
|
1st review completed | | | 8/24/2009 | | PASS |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/24/2009 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 8/24/2009 | | DONE |
Tim L. Woodard
|
|
|
|
Inspection Record Card- Bld | | | 8/24/2009 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/24/2009 | | DONE |
|
|
|
|
Telephone call | | | 8/24/2009 | | DONE |
|
|
|
Called and left a voice message for James Dobney that permit is ready & fees due///8-24-09 @ 12:55pm BAS
|
Telephone call | | | 8/24/2009 | | DONE |
|
|
|
Called Rocky Mountain LLC (GC) and left voice message that permit is ready & fees due///8-24-09 @ 12:55pm BAS
|
Plans ACCEPTED BY PLAN TECH | | | 8/20/2009 | | DONE |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/20/2009 | | DONE |
Tisha Gallop
|
|
|
|
Application received | | 8/20/2009 | | | |
|
|
|
|