Third Notice | | 6/10/2010 | 6/17/2010 | | DONE |
Tisha Gallop
|
|
|
request for refund forwarded to Rita Deyoung.
|
Third Notice | | 5/9/2010 | 5/27/2010 | | DONE |
|
|
|
faxed
|
Second Notice | | 4/24/2010 | 5/4/2010 | | DONE |
|
|
|
|
First Notice | | 4/2/2010 | 4/14/2010 | | DONE |
|
|
|
|
BLD-Final | 3/22/2010 | 3/23/2010 | 3/23/2010 | P | PASS |
Mike Jordan
|
|
|
Larry Fisher Phone #: ###-####. ok for perm. occupancy. Verified correct installation of ADA signs. Also received Letter from engineer of record accepting the in place work for supports of new hoods and AHU's. Will hace letter scanned into permit at city hall.
|
FIRE-Final Inspection | 3/22/2010 | 3/23/2010 | 3/23/2010 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
Permanent Occupancy | | | 3/23/2010 | | DONE |
Tisha Gallop
|
|
|
|
BLD-Final | 3/19/2010 | 3/22/2010 | 3/22/2010 | P | PART |
Jim Storey
|
|
|
Larry Phone #: ###-#### temp occ ok need signage for ada exit and latch side of men's rm.
|
FIRE-Final Inspection | 3/22/2010 | 3/22/2010 | 3/22/2010 | P | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given until the duct smoke detector is tested and operation is verified.
|
FIRE-Final Inspection | 3/19/2010 | 3/22/2010 | 3/22/2010 | A | FAIL |
Forrest France
|
|
|
Correction items have been completed with the exception of duct smoke detection equipment test and approval at one new unit.
|
Temporary Occupancy | 3/22/2010 | 6/20/2010 | 3/22/2010 | | DONE |
Tisha Gallop
|
|
|
|
BLD-Final | 3/19/2010 | 3/19/2010 | 3/19/2010 | P | NR |
Mike Jordan
|
|
|
as late as possible//Larry Phone #: ###-####. Needs fire/life/safety finals. Called Larry at number provided to inform him of finals still required. Will reschedule for monday.
|
CHANGE STATUS TO (ISS) | | | 3/19/2010 | | DONE |
Tisha Gallop
|
|
|
|
BLD-Framing/Rough-in | 3/16/2010 | 3/16/2010 | 3/16/2010 | P | PASS |
Mike Jordan
|
|
|
ceiling framing inspection//Larry ###-####
|
Routing - PUBLIC WORKS | 3/2/2010 | | 3/3/2010 | | PASS |
Carl Westfall
|
|
|
New connection for grease trap. Connie looked at it. Called and left a message with Jim Alexander (RADIX). Requested that he call Shawna with West Boise Sewer District (###-####) to make sure they are OK with the proposed connection. CJW
|
Telephone call | | | 3/3/2010 | | DONE |
Tisha Gallop
|
|
|
called and left vm for Jim Alexander/Radix Construction need to come pick up approved plan sheets for revision. No fees.
|
MISC ACTIONS | | | 3/3/2010 | | DONE |
Tisha Gallop
|
|
|
Jim Alexander picked up approved plans
|
Plan resubmittals received | | | 3/2/2010 | | |
Tisha Gallop
|
|
|
received transmittal and two copies of SP1.0, P1.0, P3.0; taken to Carl Westfall//per CJW this is not plan mod.
|
Routing - PLUMBING | 3/2/2010 | | 3/2/2010 | | PASS |
Bill VanDegrift
|
|
|
relocated grease inteceptor approved as resubmitted
|
Routing - PLAN CHECK | 3/2/2010 | | 3/2/2010 | | DONE |
Carl Westfall
|
|
|
Route to Public Works.
|
Routing - PLAN CHECK | 3/2/2010 | | 3/2/2010 | | DONE |
Carl Westfall
|
|
|
Routed to Plumbing.
|
BLD-Framing/Rough-in | 2/24/2010 | 2/25/2010 | 2/25/2010 | A | PASS |
Mike Jordan
|
|
|
larry Phone #: ###-####. Interior steel stud walls only. No grid. Contractor to resubmit new details to structural engineer. for approval on structural upgrades for rtu units being added. Also went over existing fire walls with contractor and requested smoke index and fire spread specs for walk in cooler.
|
Issue PAID IN FULL permit | | | 2/3/2010 | | DONE |
Tisha Gallop
|
|
|
|
(F) Reprint permit | | | 2/3/2010 | | DONE |
Tisha Gallop
|
|
|
|
Routing - PLAN CHECK | 12/18/2009 | | 1/22/2010 | | PASS |
Carl Westfall
|
|
|
Drawings approved after resubmittal review.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/22/2010 | | DONE |
|
|
|
|
Print Occupancy Form | | | 1/22/2010 | | DONE |
|
|
|
|
Print Occupancy Form | | | 1/22/2010 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/22/2010 | | DONE |
|
|
|
|
Telephone call | | | 1/22/2010 | | DONE |
|
|
|
called Sydnee permit ready and fee given Also need GC & PR 1-22-10 dld
|
Plan assigned to (CJW) | 8/21/2009 | | 1/22/2010 | | PASS |
Carl Westfall
|
|
|
1/22/2010 11:21:03 CJW - activity updated through activity BLDA022 from case BLD09-01423.
|
Plan resubmittals received | | | 1/13/2010 | | |
Carl Westfall
|
|
|
Rec'd 2 copies of light comp, structrual calcs, and sheets S1.0; M1.0; E1.0; E2.0; E3.0; taken to Carl W
|
Routing - PLAN CHECK | 10/7/2009 | | 12/18/2009 | | FAIL |
Carl Westfall
|
|
|
Unresolved concerns about proposed structural modifications. Sent E-mail to architect.
|
Plan resubmittals received | | | 12/17/2009 | | |
Tisha Gallop
|
|
|
by mail received transmittal, response letter, two copies of structural calculations and plan sheet S1.0; taken to Carl Westfall
|
Routing - PLAN CHECK | 9/18/2009 | | 10/7/2009 | | FAIL |
Carl Westfall
|
|
|
Completed the 2nd plan review. Waiting for additional information from the Architect and from the Structural Engineer. Sent the Architect an E-mail and called and talked to her to explain.
|
Plan resubmittals received | | | 9/23/2009 | | |
Carl Westfall
|
|
|
REC'D 2 COPIES OF SHEETS; CS; G1.0; SP1.0; F1.0; F2.0; A1.0; A2.0; A3.0; A3.1; A3.2; A4.0; M1.0; M2.0; M3.0;M3.1; M3.2; M3.3; P1.0; P2.0; P3.0; P3.1; E1.0; E2.0; E3.0- Taken to Carl Westfall
|
1st review completed | | | 9/18/2009 | | FAIL |
|
|
|
Failed IBC plan review.
|
Routing - PLANNING | 9/18/2009 | | 9/18/2009 | | PASS |
Andrea Tuning
|
|
|
New exterior doors and patio dining.
|
Routing - FIRE | 9/10/2009 | 9/10/2009 | 9/15/2009 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
Routing - Erosion and Sediment | 9/15/2009 | | 9/15/2009 | | PASS |
Steven Webb
|
|
|
ESC plan waiver approved with attached conditions. ESC09-00539
|
Routing - PLAN CHECK | 9/15/2009 | | 9/15/2009 | | DONE |
Carl Westfall
|
|
|
Sent to Planning.
|
Route to Impact Fee Review | 9/10/2009 | 9/15/2009 | 9/10/2009 | | PASS |
Cindy M. Gould
|
|
|
Tenant improvement no impact fees
|
Routing - PLAN CHECK | 8/28/2009 | | 9/10/2009 | | FAIL |
Carl Westfall
|
|
|
The IBC plan review was started on September 4, 2009 and was finished on September 10, 2009 (10 work days in plan check). Revised drawings and additional information required. See the plan review report.
|
Routing - PLUMBING | 8/25/2009 | | 8/28/2009 | | PASS |
Bill VanDegrift
|
|
|
ceiling is a return air plenum. mount backflow preventors for 123, 125 ,and 126 over floor sink at 198 and 128. install interceptor venting per detail P3.0.
|
Routing - PUBLIC WORKS | 8/21/2009 | | 8/25/2009 | | PASS |
Beverly Hall
|
|
|
|
Routing PW Environmental | 8/25/2009 | | 8/25/2009 | | PASS |
Walt Baumgartner
|
|
|
Grease abatement shown ok. New 1500 gal interceptor per Terry Alber
|
Routing - Addressing | 8/21/2009 | | 8/21/2009 | | PASS |
April Wing
|
|
|
|
Pending Assignment by JCB | 8/21/2009 | | 8/21/2009 | | DONE |
Jason Blais
|
|
|
|
Application received | | 8/20/2009 | 8/20/2009 | | DONE |
Alexandra L. DeYoung
|
|
|
|