Permit Information
Permit NumberBLD09-01423
StatusFinaled
Name SMASHBURGER
Site Address 8247 W FRANKLIN RD
Project NameFRANKLIN TOWNE PLAZA
Customer Number 
ePlanReviewNo
Description
(SMASHBURGER) This building is NOT fire sprinklered. To remodel an existing 1,795 square foot restaurant tenant space for a new restaurant tenant. Work is to include 2 restrooms accessible to the disabled, interior nonbearing walls, a grease hood and duct, gypsum board ceiling soffits, suspended lay-in tile ceiling, and finishes. In addition, transfer blocks and bottom cord sleepers will be added to the existing roof trusses to support new equipment. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. Interior nonstructural demolition is also covered under this permit. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 6/10/20106/17/2010 DONE
DetailsTisha Gallop
request for refund forwarded to Rita Deyoung.
Third Notice 5/9/20105/27/2010 DONE
faxed
Second Notice 4/24/20105/4/2010 DONE
First Notice 4/2/20104/14/2010 DONE
BLD-Final3/22/20103/23/20103/23/2010PPASS
DetailsMike Jordan
Larry Fisher Phone #: ###-####. ok for perm. occupancy. Verified correct installation of ADA signs. Also received Letter from engineer of record accepting the in place work for supports of new hoods and AHU's. Will hace letter scanned into permit at city hall.
FIRE-Final Inspection3/22/20103/23/20103/23/2010APASS
DetailsTroy Cobbley
Life safety passed
Permanent Occupancy  3/23/2010 DONE
DetailsTisha Gallop
BLD-Final3/19/20103/22/20103/22/2010PPART
DetailsJim Storey
Larry Phone #: ###-#### temp occ ok need signage for ada exit and latch side of men's rm.
FIRE-Final Inspection3/22/20103/22/20103/22/2010PPART
DetailsTroy Cobbley
A temporary occupancy was given until the duct smoke detector is tested and operation is verified.
FIRE-Final Inspection3/19/20103/22/20103/22/2010AFAIL
DetailsForrest France
Correction items have been completed with the exception of duct smoke detection equipment test and approval at one new unit.
Temporary Occupancy3/22/20106/20/20103/22/2010 DONE
DetailsTisha Gallop
BLD-Final3/19/20103/19/20103/19/2010PNR
DetailsMike Jordan
as late as possible//Larry Phone #: ###-####. Needs fire/life/safety finals. Called Larry at number provided to inform him of finals still required. Will reschedule for monday.
CHANGE STATUS TO (ISS)  3/19/2010 DONE
DetailsTisha Gallop
BLD-Framing/Rough-in3/16/20103/16/20103/16/2010PPASS
DetailsMike Jordan
ceiling framing inspection//Larry ###-####
Routing - PUBLIC WORKS3/2/2010 3/3/2010 PASS
DetailsCarl Westfall
New connection for grease trap. Connie looked at it. Called and left a message with Jim Alexander (RADIX). Requested that he call Shawna with West Boise Sewer District (###-####) to make sure they are OK with the proposed connection. CJW
Telephone call  3/3/2010 DONE
DetailsTisha Gallop
called and left vm for Jim Alexander/Radix Construction need to come pick up approved plan sheets for revision. No fees.
MISC ACTIONS  3/3/2010 DONE
DetailsTisha Gallop
Jim Alexander picked up approved plans
Plan resubmittals received  3/2/2010  
DetailsTisha Gallop
received transmittal and two copies of SP1.0, P1.0, P3.0; taken to Carl Westfall//per CJW this is not plan mod.
Routing - PLUMBING3/2/2010 3/2/2010 PASS
DetailsBill VanDegrift
relocated grease inteceptor approved as resubmitted
Routing - PLAN CHECK3/2/2010 3/2/2010 DONE
DetailsCarl Westfall
Route to Public Works.
Routing - PLAN CHECK3/2/2010 3/2/2010 DONE
DetailsCarl Westfall
Routed to Plumbing.
BLD-Framing/Rough-in2/24/20102/25/20102/25/2010APASS
DetailsMike Jordan
larry Phone #: ###-####. Interior steel stud walls only. No grid. Contractor to resubmit new details to structural engineer. for approval on structural upgrades for rtu units being added. Also went over existing fire walls with contractor and requested smoke index and fire spread specs for walk in cooler.
Issue PAID IN FULL permit  2/3/2010 DONE
DetailsTisha Gallop
(F) Reprint permit  2/3/2010 DONE
DetailsTisha Gallop
Routing - PLAN CHECK12/18/2009 1/22/2010 PASS
DetailsCarl Westfall
Drawings approved after resubmittal review.
PLANS/APPL TAKEN TO FRONT DESK  1/22/2010 DONE
Print Occupancy Form  1/22/2010 DONE
Print Occupancy Form  1/22/2010 DONE
Permit Ready to Issue  1/22/2010 DONE
Telephone call  1/22/2010 DONE
called Sydnee permit ready and fee given Also need GC & PR 1-22-10 dld
Plan assigned to (CJW)8/21/2009 1/22/2010 PASS
DetailsCarl Westfall
1/22/2010 11:21:03 CJW - activity updated through activity BLDA022 from case BLD09-01423.
Plan resubmittals received  1/13/2010  
DetailsCarl Westfall
Rec'd 2 copies of light comp, structrual calcs, and sheets S1.0; M1.0; E1.0; E2.0; E3.0; taken to Carl W
Routing - PLAN CHECK10/7/2009 12/18/2009 FAIL
DetailsCarl Westfall
Unresolved concerns about proposed structural modifications. Sent E-mail to architect.
Plan resubmittals received  12/17/2009  
DetailsTisha Gallop
by mail received transmittal, response letter, two copies of structural calculations and plan sheet S1.0; taken to Carl Westfall
Routing - PLAN CHECK9/18/2009 10/7/2009 FAIL
DetailsCarl Westfall
Completed the 2nd plan review. Waiting for additional information from the Architect and from the Structural Engineer. Sent the Architect an E-mail and called and talked to her to explain.
Plan resubmittals received  9/23/2009  
DetailsCarl Westfall
REC'D 2 COPIES OF SHEETS; CS; G1.0; SP1.0; F1.0; F2.0; A1.0; A2.0; A3.0; A3.1; A3.2; A4.0; M1.0; M2.0; M3.0;M3.1; M3.2; M3.3; P1.0; P2.0; P3.0; P3.1; E1.0; E2.0; E3.0- Taken to Carl Westfall
1st review completed  9/18/2009 FAIL
Failed IBC plan review.
Routing - PLANNING9/18/2009 9/18/2009 PASS
DetailsAndrea Tuning
New exterior doors and patio dining.
Routing - FIRE9/10/20099/10/20099/15/2009 PASS
DetailsScott Arellano
Attached IFC comments to plans
Routing - Erosion and Sediment9/15/2009 9/15/2009 PASS
DetailsSteven Webb
ESC plan waiver approved with attached conditions. ESC09-00539
Routing - PLAN CHECK9/15/2009 9/15/2009 DONE
DetailsCarl Westfall
Sent to Planning.
Route to Impact Fee Review9/10/20099/15/20099/10/2009 PASS
DetailsCindy M. Gould
Tenant improvement no impact fees
Routing - PLAN CHECK8/28/2009 9/10/2009 FAIL
DetailsCarl Westfall
The IBC plan review was started on September 4, 2009 and was finished on September 10, 2009 (10 work days in plan check). Revised drawings and additional information required. See the plan review report.
Routing - PLUMBING8/25/2009 8/28/2009 PASS
DetailsBill VanDegrift
ceiling is a return air plenum. mount backflow preventors for 123, 125 ,and 126 over floor sink at 198 and 128. install interceptor venting per detail P3.0.
Routing - PUBLIC WORKS8/21/2009 8/25/2009 PASS
DetailsBeverly Hall
Routing PW Environmental8/25/2009 8/25/2009 PASS
DetailsWalt Baumgartner
Grease abatement shown ok. New 1500 gal interceptor per Terry Alber
Routing - Addressing8/21/2009 8/21/2009 PASS
DetailsApril Wing
Pending Assignment by JCB8/21/2009 8/21/2009 DONE
DetailsJason Blais
Application received 8/20/20098/20/2009 DONE
DetailsAlexandra L. DeYoung