FIRE-Final Inspection | 8/31/2009 | 9/1/2009 | 9/1/2009 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed.
|
First Notice | | 9/1/2009 | 9/1/2009 | | DONE |
|
|
|
|
Permanent Occupancy | | | 9/1/2009 | | DONE |
Tisha Gallop
|
|
|
|
BLD-Final | 8/28/2009 | 8/31/2009 | 8/31/2009 | P | PART |
Mike Jordan
|
|
|
Jeff Phone #: ###-####. Will be ok for perm occ. once life/safety perms.
|
FIRE-Final Inspection | 8/28/2009 | 8/31/2009 | 8/31/2009 | A | PART |
Troy Cobbley
|
|
|
A temp for life safety was given until the interior door hardware has been changed to single action type and the exit sign in the warehouse area that leads to the front office has been removed since the door at this location has locking hardware in the direction of travel.
|
BLD-Final | 8/27/2009 | 8/28/2009 | 8/28/2009 | A | NR |
Mike Jordan
|
|
|
Jeff- occupancy only Phone #: ###-####. Needs life/safety insp. Contacted Jeff and left message.
|
Print Occupancy Form | | | 8/28/2009 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 8/27/2009 | | DONE |
|
|
|
|
Plan assigned to (TLW) | 8/24/2009 | | 8/25/2009 | | PASS |
Tim L. Woodard
|
|
|
8/25/2009 14:58:16 TLW - activity updated through activity BLDA022 from case BLD09-01444.
|
Routing - PLAN CHECK | 8/24/2009 | | 8/25/2009 | | PASS |
Tim L. Woodard
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 8/25/2009 | | DONE |
Tim L. Woodard
|
|
|
|
1st review completed | | | 8/25/2009 | | DONE |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/25/2009 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 8/25/2009 | | DONE |
Tim L. Woodard
|
|
|
|
Permit Ready to Issue | | | 8/25/2009 | | DONE |
|
|
|
|
Print Occupancy Form | | | 8/25/2009 | | DONE |
|
|
|
|
Telephone call | | | 8/25/2009 | | DONE |
|
|
|
called left message for Devin permit ready and fee given
|
Application received | | 8/24/2009 | | | |
|
|
|
|