DOC - Permit Expired | 2/17/2011 | 2/17/2011 | 2/17/2011 | P | PASS |
Tony Young
|
|
|
|
BLD-Aging Inspection | 2/17/2011 | 2/17/2011 | 2/17/2011 | | FAIL |
Tony Young
|
|
|
|
BLD-Aging Inspection | 12/16/2010 | 12/16/2010 | 12/21/2010 | | PEND |
Tony Young
|
|
|
|
BLD-Energy code compliance | 1/7/2010 | 1/7/2010 | 1/7/2010 | P | PASS |
Jim Storey
|
|
|
John Phone #: ###-####
|
BLD-Framing/Rough-in | 1/7/2010 | 1/7/2010 | 1/7/2010 | P | PASS |
Jim Storey
|
|
|
John Phone #: ###-#### c/n made ok
|
BLD-Framing/Rough-in | 12/28/2009 | 12/29/2009 | 12/29/2009 | A | FAIL |
Tony Young
|
|
|
john Phone #: ###-#### c/n posted
|
BLD-Foundation | 9/21/2009 | 9/21/2009 | 9/21/2009 | P | PASS |
Mike Jordan
|
|
|
Greg-late pm please Phone #: ###-####
|
BLD-Footing | 9/16/2009 | 9/16/2009 | 9/16/2009 | P | PART |
Tony Young
|
|
|
John Douglas ###-#### ext ftgs ok
|
Plan assigned to (PEP) | 9/16/2009 | 9/16/2009 | 9/16/2009 | | PASS |
Perry Paine
|
|
|
9/16/2009 08:48:05 PEP - activity updated through activity BLDA022 from case BLD09-01467.
|
Routing Walk-In (BLD) | 9/15/2009 | 9/15/2009 | 9/16/2009 | P | DONE |
Perry Paine
|
|
|
9/16/2009 08:48:05 PEP - activity updated through activity BLDA022 from case BLD09-01467.
|
Case Summary (BLD) | | | 9/16/2009 | | |
|
|
|
|
Inspection Record Card- Bld | | | 9/16/2009 | | |
|
|
|
|
1st review completed | | | 9/16/2009 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/16/2009 | | |
|
|
|
|
Permit Ready to Issue | | | 9/16/2009 | | DONE |
Tisha Gallop
|
|
|
|
Issue PAID IN FULL permit | | | 9/16/2009 | | DONE |
Tisha Gallop
|
|
|
|
Routing Walk-In (BLD) | 9/8/2009 | 9/8/2009 | 9/15/2009 | A | DONE |
Tisha Gallop
|
|
|
9/15/2009 12:42:07 LEG - activity updated through activity BLDI252 from case BLD09-01467.
|
PubWorks Subgrade Approval | 9/11/2009 | 9/11/2009 | 9/11/2009 | | DONE |
Terry Records
|
|
|
footing subgrade approved
|
Routing Walk-In (BLD) | 9/4/2009 | 9/4/2009 | 9/8/2009 | A | DONE |
Perry Paine
|
|
|
9/8/2009 10:57:30 LEG - activity updated through activity BLDI252 from case BLD09-01467.
|
Meeting | | | 9/8/2009 | | DONE |
|
|
|
met with builder..Josh. Engineering from the original new home permit will be acceptable if he can get it submitted.
|
Routing Walk-In (Erosion) | 9/4/2009 | 9/4/2009 | 9/4/2009 | A | PASS |
Steven Webb
|
|
|
ESC plan approved with attached conditions. ESC09-00560
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/4/2009 | | |
|
|
|
|
Routing - FRONT DESK | 9/2/2009 | | 9/4/2009 | | |
Tisha Gallop
|
|
|
Tisha
|
Plan resubmittals received | | | 9/4/2009 | | |
Tisha Gallop
|
|
|
received two copies of revised esc plan and narrative; inserted into plans by LEG and routed to ESC
|
CHANGE STATUS TO (REV) | | | 9/4/2009 | | DONE |
|
|
|
|
Routing Walk-In (Erosion) | 9/1/2009 | 9/1/2009 | 9/2/2009 | A | FAIL |
Steven Webb
|
|
|
ESC plan does not meet the requirement of BMC 8-17. Checklist e-mailed to applicant. Re-submittal is required.
|
Routing Walk-In (Zoning) | 8/31/2009 | 8/31/2009 | 8/31/2009 | P | PASS |
Colleen T Carroll
|
|
|
|
Routing Walk-In (Zoning) | 8/27/2009 | 8/27/2009 | 8/31/2009 | A | DONE |
Colleen T Carroll
|
|
|
8/31/2009 16:27:26 CTC - activity updated through activity BLDI254 from case BLD09-01467.
|
Routing Walk-In (PW Hillside) | 8/27/2009 | 8/27/2009 | 8/27/2009 | A | PASS |
Terry Records
|
|
|
A letter from the applicant's geotechnical engineer indicating that the footing subgrade is acceptable must be approved by Public Works prior to scheduling an inspection. Call Terry Records at ###-####.
|
Application received | | 8/27/2009 | | | |
|
|
|
|