Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD09-01519
StatusFinaled
Name WEBSTER CONSTRUCTION
Site Address 3017 N CRANE CREEK RD
Project Name 
Customer Number 
ePlanReviewNo
Description
Permit for the addition of approximately 197 sq. ft. of living space, interior remodel and the replacement of the roof system. Separate electrical, plumbing and mechanical permits are required. All work to be done per the approved plans, plan review report and any notations. R-1B and setbacks per planning.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/10/200912/10/200912/11/2009PPASS
DetailsTony Young
Dave Phone #: ###-####
NOTE: crawl access was covered w/ new carpet being put down,, contractor assured me all was insulated, clean, etc.
DOC - Permit Finaled12/11/200912/11/200912/11/2009PPASS
DetailsTony Young
c of c issued
BLD-Final12/9/200912/10/200912/10/2009APASS
DetailsTony Young
Dave Phone #: ###-####
BLD-Energy code compliance10/28/200910/29/200910/29/2009APASS
DetailsTony Young
david Phone #: ###-####
BLD-Energy code compliance10/27/200910/28/200910/28/2009PPASS
DetailsTony Young
david Phone #: ###-####
BLD-Framing/Rough-in10/27/200910/27/200910/27/2009PPASS
DetailsTony Young
david Phone #: ###-####
BLD-Footing9/28/20099/29/20099/29/2009APART
DetailsTony Young
dave Phone #: ###-####
posts and addition ok,, wip
PubWorks Subgrade Approval9/28/20099/28/20099/28/2009 PASS
DetailsBrian Murphy
Received letter from engineer subgrade ok per Brian Murphy
Routing Walk-In (BLD)9/10/20099/10/20099/10/2009PDONE
DetailsPerry Paine
9/10/2009 14:19:16 PEP - activity updated through activity BLDA022 from case BLD09-01519.
Case Summary (BLD)  9/10/2009 DONE
Inspection Record Card- Bld  9/10/2009 DONE
1st review completed  9/10/2009 DONE
PLANS/APPL TAKEN TO FRONT DESK  9/10/2009  
Issue PAID IN FULL permit  9/10/2009 DONE
Intake Approval  9/3/2009 FAIL
need foundation engineering.
Routing Walk-In (PW Hillside)9/2/20099/2/20099/2/2009PPASS
DetailsTerry Records
A letter from the applicant's geotechnical engineer indicating that the footing subgrade is acceptable must be approved by Boise Public Works prior to scheduling a footing inspection.
Routing Walk-In (Zoning)9/2/20099/2/20099/2/2009PPASS
DetailsColleen T Carroll
Routing Walk-In (BLD)9/2/20099/2/20099/2/2009PFAIL
DetailsPerry Paine
Foundation engineering required. ESC waiver should be ok
Plan assigned to (PEP)9/2/20099/2/20099/2/2009 DONE
DetailsPerry Paine
Application received 9/2/2009