Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD09-01532
StatusFinaled
Name WESTERN REALTY ADVISORS INC
Site Address 702 W IDAHO ST
Project NameKey Bank
Customer Number 
ePlanReviewNo
Description
(KEY BUISNESS CENTER - Key Bank Building - 10th Floor) ***11/5/2009 - PLAN MODIFICATION TO ADD TWO NEW FIRE RATED DOORS TO THE ELEVATOR LOBBY, ADDITIONAL EXIT SIGNS, ADDITIONAL EMERGENCY EGRESS LIGHTS, ADDITION OF A NEW 2HR. WALL TO SEPARATE ONE OF THE EXIT ENCLOSURES FROM THE ELEVATOR LOBBY. ALL WORK PER THE APPROVED PLANS, ATTACHED PLAN REVIEW REPORT, RED-LINING, AND STRUCTURAL INSPECTORS APPROVALS***SRZ** Permit is to reconfigure an existing 6,660 square foot office space to meet the needs of a new tenant. This is an existing high-rise building. Work to include: construction of interior non-bearing walls, installation of interior doors and associated accessible hardware, installation of new lighting, and interior finishes in compliance with chapter 8 of the 2006 IBC. This building is fully fire sprinklered any alterations or modifications to the sprinkler system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA #13 as regulated by the fire department. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 5/6/20104/29/2010 DONE
This permit finaled on the web by Bill Waterfield
First Notice 4/19/20104/26/2010 DONE
Permanent Occupancy  4/9/2010 DONE
DetailsTisha Gallop
FIRE-Final Inspection4/6/20104/6/20104/7/2010PPASS
DetailsForrest France
Fire life safety final approved, project attatched FIR permits completed/finaled.
BLD-Final4/6/20104/7/20104/7/2010APASS
DetailsDave Hannah
bill Phone #: ###-#### ok for perm occ
BLD-Final12/22/200912/23/200912/23/2009APART
DetailsDave Hannah
Please call Bill 15 minutes ahead ###-#### Phone #: ###-#### Internet Inspection Request from: Bill Waterfield ok for temp occ needs a fire damper in duct work crossing lobby
Temporary Occupancy12/23/20093/23/201012/23/2009 DONE
DetailsAlexandra L. DeYoung
FIRE-Final Inspection12/22/200912/22/200912/22/2009PPASS
DetailsForrest France
Fire life safety inspection passed after corrections made while on site including door hardware, one exit sign, missing ceiling tile installed.
BLD-Conference12/21/200912/21/200912/21/2009PPASS
DetailsDave Hannah
Bill Phone #: ###-#### 20 min doors ok
CHANGE STATUS TO (ISS)  12/21/2009 DONE
(F) Reprint permit  12/21/2009 DONE
Print Occupancy Form  11/6/2009 DONE
Permit Ready to Issue  11/6/2009 DONE
Telephone call  11/6/2009 DONE
DetailsBarbara Stitt
Left voice message for Jeff Likes that permit is ready & fees due///11-6-09 @ 12:06pm BAS
Plan assigned to (SRZ)11/4/200911/4/200911/5/2009 PASS
DetailsSam Zahorka
11/5/2009 15:11:12 SRZ - activity updated through activity BLDA022 from case BLD09-01532.
Routing - PLAN CHECK11/4/2009 11/5/2009 PASS
DetailsSam Zahorka
with red-lining
Case Summary (BLD)  11/5/2009 DONE
Case Summary (BLD)  11/5/2009 DONE
PLANS/APPL TAKEN TO FRONT DESK  11/5/2009 DONE
DetailsSam Zahorka
Plan Modification Accepted  11/4/2009  
DetailsSam Zahorka
Rec'd plan mod to add two fire rated doors to the elevator lobby and update elevator lobby to be two hour walls; two copies of sheets A1.1 & A8.1
CHANGE STATUS TO (REV)  11/4/2009 DONE
BLD-Framing/Rough-in10/20/200910/21/200910/22/2009PPASS
DetailsDave Hannah
Phone #: ###-#### Internet Inspection Request from: Bill Waterfield
Print Occupancy Form  9/14/2009 DONE
Permit Ready to Issue  9/14/2009 DONE
Telephone call  9/14/2009 DONE
DetailsBarbara Stitt
Called Jeff Likes and told him that permit is ready, fees due and need to know who GC will be and RC #///9-14-09 @ 11:04am BAS
Issue PAID IN FULL permit  9/14/2009 DONE
DetailsTisha Gallop
Plan assigned to (TLW)9/4/2009 9/11/2009 PASS
DetailsTim L. Woodard
9/11/2009 14:50:32 TLW - activity updated through activity BLDA022 from case BLD09-01532.
Routing - PLAN CHECK9/4/2009 9/11/2009 PASS
DetailsTim L. Woodard
No corrections required. TLW
Routing - FIRE  9/11/2009 PASS
DetailsTim L. Woodard
Field Verify
1st review completed  9/11/2009 DONE
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  9/11/2009 DONE
DetailsTim L. Woodard
Case Summary (BLD)  9/11/2009 DONE
DetailsTim L. Woodard
Case Summary (BLD)  9/11/2009 DONE
DetailsTim L. Woodard
Plans ACCEPTED BY PLAN TECH  9/4/2009 DONE
DetailsAlexandra L. DeYoung
Application received 9/3/20099/3/2009 DONE
DetailsAlexandra L. DeYoung