BLD-Final | 4/28/2010 | 4/29/2010 | 4/29/2010 | A | PASS |
Jim Storey
|
|
|
chad Phone #: ###-####
|
DOC - Permit Finaled | 4/29/2010 | 4/29/2010 | 4/29/2010 | P | PASS |
Jim Storey
|
|
|
|
BLD-Final | 4/27/2010 | 4/28/2010 | 4/28/2010 | A | FAIL |
Mike Jordan
|
|
|
chad Phone #: ###-####. Provide insualtion cert. Provide landings on all exterior doors. Extend handrail to last riser at 1st. floor. c/n posted.
|
BLD-Aging Inspection | 3/30/2010 | 3/30/2010 | 3/30/2010 | | PASS |
Jim Storey
|
|
|
|
BLD-Wall cover | 1/24/2010 | 1/25/2010 | 1/25/2010 | P | PASS |
Jim Storey
|
|
|
Papers are there with the fix. Thanks for your help, Chad Phone #: ###-#### Internet Inspection Request from: Chad Christensen c/n made ok
|
BLD-Wall cover | 1/22/2010 | 1/22/2010 | 1/22/2010 | P | CANC |
Tom Arcoraci
|
|
|
Hope cold is better, paper work and construction will be done by noon. Thanks Chad Phone #: ###-#### Internet Inspection Request from: Chad Christensen
|
BLD-Conference | 1/20/2010 | 1/21/2010 | 1/21/2010 | A | NR |
Jim Storey
|
|
|
Framer will be there at 8:00 all should be well by 9:00, Framer would love to be out there when you are there to show you resolution for cracked I joist. Hope to cover in the PM Thanks Chad Phone #: ###-#### Internet Inspection Request from: Chad Christensen
|
BLD-Wall cover | 1/19/2010 | 1/20/2010 | 1/20/2010 | A | PART |
Jim Storey
|
|
|
Phone #: ###-#### Internet Inspection Request from: Chad Christensen framing ok need i joist repair for broken bottom cord. ok to insulate.
|
BLD-Foundation | 10/19/2009 | 10/21/2009 | 10/21/2009 | A | PASS |
Jim Storey
|
|
|
Bill ###-####
|
BLD-Footing | 10/20/2009 | 10/20/2009 | 10/20/2009 | P | PASS |
Jim Storey
|
|
|
Bill Phone #: ###-####
|
BLD-Footing | 10/16/2009 | 10/20/2009 | 10/20/2009 | A | CANC |
Jim Storey
|
|
|
Bill Phone #: ###-#### called and cancled until pm.
|
Route to Impact Fee Review | 9/8/2009 | 9/11/2009 | 10/9/2009 | | PASS |
Cindy M. Gould
|
|
|
|
Inspection Record Card- Bld | | | 10/9/2009 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/9/2009 | | DONE |
|
|
|
|
Telephone call | | | 10/9/2009 | | DONE |
|
|
|
called Chad left message permit ready and fee given Also need RP #
|
Issue PAID IN FULL permit | | | 10/9/2009 | | DONE |
|
|
|
|
Plan assigned to (CDM) | 9/8/2009 | 9/8/2009 | 10/8/2009 | | PASS |
Carl D Madsen
|
|
|
10/8/2009 11:09:08 CDM - activity updated through activity BLDA022 from case BLD09-01550.
|
Case Summary (BLD) | | | 10/8/2009 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 10/8/2009 | | 10/8/2009 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/8/2009 | | |
|
|
|
|
Plan resubmittals received | | | 10/7/2009 | | |
Tisha Gallop
|
|
|
received two copies of structural calcs, truss engineering, engineering stamped plans on 11" x 17" and plan sheets 4, 8, and 9; taken to Carl Madsen
|
1st review completed | | | 9/14/2009 | | FAIL |
|
|
|
|
Routing - PUBLIC WORKS | 9/9/2009 | | 9/11/2009 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - PLANNING | 9/9/2009 | | 9/9/2009 | | PASS |
Colleen T Carroll
|
|
|
Driveway needs to be 50' from intersection and no more than 33' wide in front 20 setback
|
Routing - Addressing | 9/8/2009 | | 9/9/2009 | | PASS |
April Wing
|
|
|
|
Application received | | 9/8/2009 | 9/8/2009 | | DONE |
Tisha Gallop
|
|
|
|
Routing - PLAN CHECK | 9/11/2009 | | | | FAIL |
Carl D Madsen
|
|
|
Engineering is required 9-14-09 CDM
Sent E-Mail to Chad Christensen with the required resubmittal items. 9-14-09 CDM
|