BLD-Final | 8/24/2012 | 8/24/2012 | 8/24/2012 | P | PASS |
Dave Hannah
|
|
|
Ready for signoff?
|
First Notice | | 9/3/2012 | 8/24/2012 | | DONE |
|
|
|
|
Print Occupancy Form | | | 8/24/2012 | | DONE |
Barbara Stitt
|
|
|
|
Permanent Occupancy | | | 8/24/2012 | | DONE |
Barbara Stitt
|
|
|
|
BLD-Final | 7/13/2012 | 7/16/2012 | 7/25/2012 | P | PASS |
Forrest France
|
|
|
Correction items verified. Life safety inspection passed.
|
BLD-Final | 7/13/2012 | 7/16/2012 | 7/16/2012 | P | CANC |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 2/3/2012 | 2/3/2012 | 2/9/2012 | | PASS |
Dave Hannah
|
|
|
|
BLD-Conference | 8/26/2011 | 8/29/2011 | 8/30/2011 | A | DONE |
Dave Hannah
|
|
|
Jason & Legal working with owners
|
BLD-Aging Inspection | 3/15/2011 | 3/15/2011 | 3/22/2011 | | PASS |
Dave Hannah
|
|
|
|
Plan Reviewer's activity | | | 2/4/2011 | | DONE |
Jason Blais
|
|
|
Applicant has requested an extension in time until July 1, 2011, to complete the lot consolidation. This has been accepted by Building Management and the Legal Department. Letter attached to this case.
|
BLD-Aging Inspection | 1/11/2011 | 1/11/2011 | 1/11/2011 | | DEFR |
Dave Hannah
|
|
|
|
Plan Reviewer's activity | | | 1/5/2011 | | DONE |
Jason Blais
|
|
|
Sent Notice & Order to address remaining needed (infill openings on lot line or consolidate two lots into one to remove the interior lot line) in order to final out the permit and issue a Certificate of Occupancy. Document attached to this case.
|
BLD-Other | 10/21/2010 | 10/21/2010 | 10/22/2010 | P | PART |
Dave Hannah
|
|
|
stopped in they will call jason to get this rolling
|
BLD-Aging Inspection | 10/20/2010 | 10/20/2010 | 10/21/2010 | | PART |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 8/3/2010 | 8/3/2010 | 8/3/2010 | | PASS |
Dave Hannah
|
|
|
|
BLD-Conference | 4/14/2010 | 4/19/2010 | 4/21/2010 | A | PASS |
Dave Hannah
|
|
|
thay have finished mazz. and are working on lot survey
|
BLD-Conference | 4/1/2010 | 4/1/2010 | 4/1/2010 | P | PART |
Dave Hannah
|
|
|
talked with shop manager they are working on the mezzanine and looking for a surveyor
|
Plan Reviewer's activity | | | 3/15/2010 | | DONE |
Tim L. Woodard
|
|
|
Accepted the engineering calcs and are not requiring an additional building permit for the repairs to the mezzanine. Dave Hannah will verify construction repairs. TLW
|
Plan resubmittals received | | | 3/5/2010 | | DONE |
Jason Blais
|
|
|
Received structural engineering calculations and fixes for the mezzanine. Reviewed with Building Inspector, Dave Hannah. Provided copy to Plans Examiner, Tim Woodard.
|
Plan Reviewer's activity | | | 12/30/2009 | | DONE |
Tim L. Woodard
|
|
|
Sent corrections required to applicants email addresses and also sent via mail to Valley Glass. A copy of the corrections required are attached to the case. TLW
|
Plan resubmittals received | | | 9/30/2009 | | |
Tisha Gallop
|
|
|
received revised floor plan; taken to Tim Woodard
|
BLD-Final | 9/21/2009 | 9/22/2009 | 9/24/2009 | P | PART |
Dave Hannah
|
|
|
sharon or dave Phone #: ###-#### will need to submit new floor plan
|
FIRE-Final Inspection | 9/21/2009 | 9/22/2009 | 9/22/2009 | A | FAIL |
Forrest France
|
|
|
Missing building address numbers, door hardware at several locations is not compliant including the main entry/exit office door, noted bare electrical wiring and open junction boxes at some locations, extension cords are not to be used for permanent power sources to equipment, missing floorplan to accurately indicate building layout including service, storage and mezzanine areas, paper faced insulation at the deck is not compliant, suggest further plan review to help determine min. requirements for occupancy.
|
Issue PAID IN FULL permit | | | 9/21/2009 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/17/2009 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 9/17/2009 | | DONE |
Tim L. Woodard
|
|
|
|
Print Occupancy Form | | | 9/17/2009 | | DONE |
|
|
|
|
Telephone call | | | 9/17/2009 | | DONE |
|
|
|
t/c w sharon at ###-#### - permit ready
|
Permit Ready to Issue | | | 9/17/2009 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 9/10/2009 | | 9/16/2009 | | PASS |
Tim L. Woodard
|
|
|
|
Plan assigned to (TLW) | 9/10/2009 | | 9/16/2009 | | DONE |
Tim L. Woodard
|
|
|
|
1st review completed | | | 9/16/2009 | | DONE |
Tim L. Woodard
|
|
|
|
Application received | | 9/10/2009 | 9/10/2009 | | DONE |
Alexandra L. DeYoung
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/10/2009 | | |
|
|
|
|
Second Notice | | 9/3/2012 | | | |
|
|
|
|