Permit Information
Permit NumberBLD09-01570
StatusFinaled
Name TVR INC
Site Address 11514 W EXECUTIVE DR
Project NameNorthern Sales
Customer Number 
ePlanReviewNo
Description
(NORTHERN SALES **RACKING**) Permit to add fourteen foot tall storage racking in an existing warehouse. Work to include: installation of prefabricated 14 foot tall storage racking including seismic bolting to existing slab. Approval of this permit is contingent on adhering to approved plans and engineering. The design, testing and utilization of industrial steel storage racks shall be in accordance with the RMI Specification for the Design, Testing and Utilization of Industrial Steel Storage Racks. (Special inspections on the anchor bolts are required per ICC/ESR 2251)**TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 10/25/200910/27/2009 DONE
First Notice10/7/200910/7/200910/15/2009 DONE
DetailsMike Jordan
BLD-Final10/6/200910/7/200910/7/2009APASS
DetailsMike Jordan
brandon Phone #: ###-####
DOC - Permit Finaled10/7/200910/7/200910/7/2009PPASS
DetailsMike Jordan
All issues have been resolved. Will have special insp. report scanned into permit.
FIRE-Final Inspection10/6/200910/6/200910/6/2009PPASS
DetailsTroy Cobbley
life safety has already been passed.
BLD-Final9/23/20099/23/20099/23/2009PFAIL
DetailsMike Jordan
brandon Phone #: ###-####. Contractor did get special insp. However the special insp. report did not verifiy the embedment length of 3 3/8 Inch as per the engineering. The wedge anchors were already installed with no special inspection. Noted to contractor that if they could verify the embedment length on 25% of bolts installed, that I would accept the work as being done incompliance with approved plans and specs. Spoke to contractor and made him aware that special insp. did not verify embedment length. Contractor to reschedule final when work is in compliance.
BLD-Final9/21/20099/22/20099/22/2009PFAIL
DetailsMike Jordan
brandon Phone #: ###-####. Needs special insp. on anchors that were installed.
FIRE-Final Inspection9/21/20099/22/20099/22/2009APASS
DetailsTroy Cobbley
life safety passed
Issue PAID IN FULL permit  9/21/2009 DONE
DetailsTisha Gallop
Routing - FIRE9/16/2009 9/18/2009 PASS
DetailsScott Arellano
Attached IFC comments to plans
Plan assigned to (TLW)9/11/2009 9/18/2009 PASS
DetailsTim L. Woodard
9/18/2009 10:43:05 TLW - activity updated through activity BLDA022 from case BLD09-01570.
1st review completed  9/18/2009 PASS
Routing - PLAN CHECK9/18/2009 9/18/2009 PASS
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  9/18/2009 DONE
DetailsTim L. Woodard
Inspection Record Card- Bld  9/18/2009 DONE
Details
Telephone call  9/18/2009 DONE
Details
left vm for brandon at ###-#### - permit ready and fees given
Permit Ready to Issue  9/18/2009 DONE
Details
Routing - PLAN CHECK9/11/2009 9/16/2009 PASS
DetailsTim L. Woodard
Special Inspections required on bolting. TLW
Case Summary (BLD)  9/16/2009 DONE
DetailsTim L. Woodard
Plans ACCEPTED BY PLAN TECH  9/11/2009 DONE
Application received 9/10/2009