Third Notice | | 2/2/2012 | 2/3/2012 | | DONE |
|
|
|
need to fax to Vertical///in file
|
Third Notice | | 1/17/2012 | 1/19/2012 | | DONE |
|
|
|
Verticle (for portion when took over project); already received FV from Curt Barber for his portion prior to fire. //1/19/12 faxed to Vertical
|
Third Notice | | 12/26/2011 | 1/3/2012 | | DONE |
|
|
|
need fv for vertical portion of project value and what they paid the mech contractor affordable heating & cooling -- faxed 1/3/12
|
Second Notice | | 12/15/2011 | 12/21/2011 | | DONE |
|
|
|
|
Telephone call | | | 12/9/2011 | | |
Tisha Gallop
|
|
|
Curt Barber with Custom Steel Structures called because received request for FV. Part way through this project at 2980 Main St there was a fire that did minor damage to 2980 Main and major damage to 2900 Main (Bld09-01796). At that time Vertical Corp took over project and pulled new permit for 2900 Main (bld10-01086 & Bld10-02356). Vertical worked off of this same original permit to get occupancy at 2980 Main, but there was never a change of GC recorded during that time. Curt will turn in what portion of the value he did and what his subs got, but need to contact Vertical for everything that happened after the fire.
|
First Notice | | 12/2/2011 | 12/5/2011 | | DONE |
|
|
|
|
Permanent Occupancy | | | 11/22/2011 | | DONE |
Christina Prado
|
|
|
|
BLD-Final | 11/15/2011 | 11/16/2011 | 11/16/2011 | A | PASS |
Dave Hannah
|
|
|
glen Phone #: ###-####
|
BLD-Aging Inspection | 10/19/2011 | 10/19/2011 | 10/19/2011 | | PASS |
Dave Hannah
|
|
|
|
(F) Reprint permit | | | 10/11/2011 | | |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 10/11/2011 | | DONE |
|
|
|
|
OVERRIDE | | | 9/30/2011 | | |
|
|
|
|
Telephone call | | | 9/30/2011 | | DONE |
Barbara Stitt
|
|
|
Called Curt and told him that permit is ready & fees due on 9-30-11 @ 4:05pm//BAS
|
Print Occupancy Form | | | 9/30/2011 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/30/2011 | | DONE |
Barbara Stitt
|
|
|
|
Routing - PLAN CHECK | 9/30/2011 | | 9/30/2011 | | PASS |
Tim L. Woodard
|
|
|
Approved with additional calculations
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/30/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 9/30/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 9/30/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Plan assigned to (TLW) | 2/14/2011 | | 9/30/2011 | | PASS |
Tim L. Woodard
|
|
|
|
Plan resubmittals received | | | 9/28/2011 | | |
|
|
|
Received sructural calcs for truss fix (emailed from engineer Shawn Reeder)
|
Zoning Approval | 5/3/2011 | 5/3/2011 | 5/3/2011 | | PASS |
Josh Wilson
|
|
|
|
Override - Parcel Holds | | | 5/3/2011 | | |
|
|
|
|
Plan Reviewer's activity | | | 2/18/2011 | | DONE |
Tim L. Woodard
|
|
|
Talked with Shawn Reeder (engineer), Dave Kelly (Contractor), and Ward Schwider (Architect) told them all I couldn't approve the modification without additional structural calculations. TLW
|
Plan resubmittals received | | | 2/17/2011 | | DONE |
Tisha Gallop
|
|
|
received two copies of plan sheet A2.0; taken to Tim Woodard.
|
Plan Modification Accepted | | | 2/14/2011 | | DONE |
Barbara Stitt
|
|
|
Plan modification accepted to replace the HVAC unit with a roof mounted Gas/electric HVAC unit. Modify the building the roof trusses to accomadate the HVAC system. For questions please contact Tim Woodard
|
BLD-Aging Inspection | 2/4/2011 | 2/4/2011 | 2/7/2011 | | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 11/12/2010 | 11/12/2010 | 11/12/2010 | P | PART |
Mike Jordan
|
|
|
Dave Phone #: ###-####. ok for temp. occ.
|
Zoning Approval Temp | 11/4/2010 | 11/4/2010 | 11/4/2010 | | PASS |
Josh Wilson
|
|
|
180 day temporary occupancy to complete improvements associated with 2900 Main St.
|
FIRE-Final Inspection | 11/3/2010 | 11/3/2010 | 11/3/2010 | A | PASS |
Forrest France
|
|
|
Fire life safety finaled.
|
FIRE-Final Inspection | 11/1/2010 | 11/2/2010 | 11/3/2010 | A | PASS |
Forrest France
|
|
|
Life safety is satisfactory pending building address numbers are posted in compliance with IFC requirements as discussed.
|
BLD-Conference | 10/21/2010 | 10/21/2010 | 10/21/2010 | A | PART |
Dave Hannah
|
|
|
talked with owner he will get finals
|
BLD-Aging Inspection | 10/20/2010 | 10/20/2010 | 10/21/2010 | | PASS |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 8/4/2010 | 8/4/2010 | 8/5/2010 | | PASS |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 10/6/2009 | 10/7/2009 | 10/7/2009 | A | PASS |
Dave Hannah
|
|
|
Curt Phone #: ###-####
|
Plan resubmittals received | | | 9/29/2009 | | |
Tisha Gallop
|
|
|
received two copies of sheet A2.0; taken to Tim Woodard
|
Print Occupancy Form | | | 9/28/2009 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/28/2009 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 9/28/2009 | | DONE |
|
|
|
|
Plan assigned to (TLW) | 9/21/2009 | | 9/25/2009 | | PASS |
Tim L. Woodard
|
|
|
9/25/2009 16:27:21 TLW - activity updated through activity BLDA022 from case BLD09-01620.
|
Routing - PLAN CHECK | 9/21/2009 | | 9/25/2009 | | PASS |
Tim L. Woodard
|
|
|
Approved per redlining and DRH09-00227.
|
Routing - FIRE | | | 9/25/2009 | | PASS |
Tim L. Woodard
|
|
|
Field verify
|
1st review completed | | | 9/25/2009 | | DONE |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/25/2009 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 9/25/2009 | | DONE |
Tim L. Woodard
|
|
|
|
Application received | | 9/21/2009 | 9/21/2009 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/21/2009 | | DONE |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/21/2009 | | DONE |
Tisha Gallop
|
|
|
|