Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD09-01620
StatusFinaled
Name VERTICAL CORP
Site Address 2980 W MAIN ST
Project NameEberlestock
Customer Number 
ePlanReviewNo
Description
(EBERLESTOCK - Mercantile Building) Permit is to remodel an existing 4,200 square foot mercantile store (Car Parts Store) to meet the needs of a new tenant and upgrade the accessibility. PLAN MODIFICATION 9-30-11 – Modification submitted to add a new RTU to the existing rooftop w/structural calculations and fall protection.**TLW** Approval per approved plans on file, all redlining, and DRH09-00227. Work to include: construction of interior non-bearing walls to create a 882 square foot stock room and to create a 378 square foot office, replacement of knob hardware with lever hardware, installing two new wall hung accessible sinks, re-installing required hi/low drinking fountain, installation of new grab bars, installation of new exit lighting, installation of new interior lighting, and interior finishes in compliance with chapter 8 of the 2006 IBC. This building is not fire sprinklered. Any racking installed exceeding 8 ft. in height will require a separate racking permit. PLAN MODIFICATION 9-30-11 – Modification submitted to add a new RTU to the existing rooftop w/structural calculations and fall protection.**TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 2/2/20122/3/2012 DONE
need to fax to Vertical///in file
Third Notice 1/17/20121/19/2012 DONE
Verticle (for portion when took over project); already received FV from Curt Barber for his portion prior to fire. //1/19/12 faxed to Vertical
Third Notice 12/26/20111/3/2012 DONE
need fv for vertical portion of project value and what they paid the mech contractor affordable heating & cooling -- faxed 1/3/12
Second Notice 12/15/201112/21/2011 DONE
Telephone call  12/9/2011  
DetailsTisha Gallop
Curt Barber with Custom Steel Structures called because received request for FV. Part way through this project at 2980 Main St there was a fire that did minor damage to 2980 Main and major damage to 2900 Main (Bld09-01796). At that time Vertical Corp took over project and pulled new permit for 2900 Main (bld10-01086 & Bld10-02356). Vertical worked off of this same original permit to get occupancy at 2980 Main, but there was never a change of GC recorded during that time. Curt will turn in what portion of the value he did and what his subs got, but need to contact Vertical for everything that happened after the fire.
First Notice 12/2/201112/5/2011 DONE
Permanent Occupancy  11/22/2011 DONE
DetailsChristina Prado
BLD-Final11/15/201111/16/201111/16/2011APASS
DetailsDave Hannah
glen Phone #: ###-####
BLD-Aging Inspection10/19/201110/19/201110/19/2011 PASS
DetailsDave Hannah
(F) Reprint permit  10/11/2011  
CHANGE STATUS TO (ISS)  10/11/2011 DONE
OVERRIDE  9/30/2011  
Telephone call  9/30/2011 DONE
DetailsBarbara Stitt
Called Curt and told him that permit is ready & fees due on 9-30-11 @ 4:05pm//BAS
Print Occupancy Form  9/30/2011 DONE
Permit Ready to Issue  9/30/2011 DONE
DetailsBarbara Stitt
Routing - PLAN CHECK9/30/2011 9/30/2011 PASS
DetailsTim L. Woodard
Approved with additional calculations
PLANS/APPL TAKEN TO FRONT DESK  9/30/2011 DONE
DetailsTim L. Woodard
Case Summary (BLD)  9/30/2011 DONE
DetailsTim L. Woodard
Case Summary (BLD)  9/30/2011 DONE
DetailsTim L. Woodard
Plan assigned to (TLW)2/14/2011 9/30/2011 PASS
DetailsTim L. Woodard
Plan resubmittals received  9/28/2011  
Received sructural calcs for truss fix (emailed from engineer Shawn Reeder)
Zoning Approval5/3/20115/3/20115/3/2011 PASS
DetailsJosh Wilson
Override - Parcel Holds  5/3/2011  
Plan Reviewer's activity  2/18/2011 DONE
DetailsTim L. Woodard
Talked with Shawn Reeder (engineer), Dave Kelly (Contractor), and Ward Schwider (Architect) told them all I couldn't approve the modification without additional structural calculations. TLW
Plan resubmittals received  2/17/2011 DONE
DetailsTisha Gallop
received two copies of plan sheet A2.0; taken to Tim Woodard.
Plan Modification Accepted  2/14/2011 DONE
DetailsBarbara Stitt
Plan modification accepted to replace the HVAC unit with a roof mounted Gas/electric HVAC unit. Modify the building the roof trusses to accomadate the HVAC system. For questions please contact Tim Woodard
BLD-Aging Inspection2/4/20112/4/20112/7/2011 PASS
DetailsDave Hannah
BLD-Final11/12/201011/12/201011/12/2010PPART
DetailsMike Jordan
Dave Phone #: ###-####. ok for temp. occ.
Zoning Approval Temp11/4/201011/4/201011/4/2010 PASS
DetailsJosh Wilson
180 day temporary occupancy to complete improvements associated with 2900 Main St.
FIRE-Final Inspection11/3/201011/3/201011/3/2010APASS
DetailsForrest France
Fire life safety finaled.
FIRE-Final Inspection11/1/201011/2/201011/3/2010APASS
DetailsForrest France
Life safety is satisfactory pending building address numbers are posted in compliance with IFC requirements as discussed.
BLD-Conference10/21/201010/21/201010/21/2010APART
DetailsDave Hannah
talked with owner he will get finals
BLD-Aging Inspection10/20/201010/20/201010/21/2010 PASS
DetailsDave Hannah
BLD-Aging Inspection8/4/20108/4/20108/5/2010 PASS
DetailsDave Hannah
BLD-Framing/Rough-in10/6/200910/7/200910/7/2009APASS
DetailsDave Hannah
Curt Phone #: ###-####
Plan resubmittals received  9/29/2009  
DetailsTisha Gallop
received two copies of sheet A2.0; taken to Tim Woodard
Print Occupancy Form  9/28/2009 DONE
Details
Permit Ready to Issue  9/28/2009 DONE
Issue PAID IN FULL permit  9/28/2009 DONE
Plan assigned to (TLW)9/21/2009 9/25/2009 PASS
DetailsTim L. Woodard
9/25/2009 16:27:21 TLW - activity updated through activity BLDA022 from case BLD09-01620.
Routing - PLAN CHECK9/21/2009 9/25/2009 PASS
DetailsTim L. Woodard
Approved per redlining and DRH09-00227.
Routing - FIRE  9/25/2009 PASS
DetailsTim L. Woodard
Field verify
1st review completed  9/25/2009 DONE
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  9/25/2009 DONE
DetailsTim L. Woodard
Case Summary (BLD)  9/25/2009 DONE
DetailsTim L. Woodard
Application received 9/21/20099/21/2009 DONE
Plans ACCEPTED BY PLAN TECH  9/21/2009 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  9/21/2009 DONE
DetailsTisha Gallop