Information based on query as of Thursday, July 4, 2024.
Permit Information
Permit NumberBLD09-01623
StatusFinaled
Name PARKER PORTRAITS
Site Address 2620 W BANNOCK ST
Project NameParker Portraits
Customer Number 
ePlanReviewNo
Description
(Parker Portraits) Interior tenant improvement to change occupancy use group from "A3" Israel Congregation Church Assembly Occupancy too a "B" occupancy for Parker Portraits Business Office. The floor area is 2,562 Sq. Ft. Scope of work includes change of (4) classrooms along the West side of the building into offices; interior NB walls in the SE corner of the building that created an office (Rm 114), a reception room (Rm. 113) and a Work Room (Rm. 112) were constructed by the Congregational Israel Church. Scope of work includes: relocate pull accordion curtains to the south end of the raised platform and use of the platform for storage (Rm. 111); add handrails at stairs to storage platform; modify front entry stairs & landing and add an additional landing, ramp, handrails and edge protection to provide an accessible route from Handicap parking to the main entry; add new concrete landing and stairs with handrails at the rear exit; change out doors #105, #106 to provide required 32" clearance width; new doors at MEN / WOMEN Restrooms; Doors #109 & #110 to BREAK & SUPPLY rooms are to be removed to provide 32" clear width and provide accessibility compliant latch side clearances and clear floor areas on both sides of doors; modify the existing restrooms for accessibility compliance, add an accessible front approach drinking fountain and a drinking fountain bubbler on the break room sink for standing unit compliance; provide a service sink. SEE ATTACHED ENGINEERING FOR DESIGN LOADING AND FOR INSTALLATION INSTRUCTIONS / REQUIREMENTS. CUPO4-00124 CVA04-00047 & CZC06-00110 drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 2/7/20102/1/2010 DONE
First Notice 1/21/20101/28/2010 DONE
Permanent Occupancy  1/11/2010 DONE
Details
BLD-Final1/4/20101/5/20101/5/2010APASS
DetailsDave Hannah
Evelyn after 9 am if possible Phone #: ###-#### ok for perm occ
FIRE-Final Inspection12/17/200912/17/200912/17/2009PPASS
DetailsForrest France
Life safety completed acceptable, inspection passed.
Zoning Approval12/17/200912/17/200912/17/2009 PASS
DetailsCody Riddle
Handrails will be verified by building inspector.
Issue PAID IN FULL permit  12/10/2009 DONE
Telephone call  12/9/2009 DONE
DetailsBarbara Stitt
Per Steve Webb an ESC permit and waiver are required but no Responsible Person is required for this project
Plan assigned to (DRS)9/29/20099/29/200912/8/2009 PASS
DetailsDan Stuart
12/8/2009 11:04:50 DRS - activity updated through activity BLDA022 from case BLD09-01623.
Routing - PLAN CHECK11/30/2009 12/8/2009 PASS
DetailsDan Stuart
Attached engineering design calcs for handrails and installation instructions; attached spec sheets provided; modified permit wording and modified plan review. To permit desk to issue.
PLANS/APPL TAKEN TO FRONT DESK  12/8/2009 PASS
Print Occupancy Form  12/8/2009 DONE
Telephone call  12/8/2009 DONE
DetailsTisha Gallop
called Jay Parker and left vm permit is ready, fees, need GC, RCE, RP
Permit Ready to Issue  12/8/2009 DONE
DetailsTisha Gallop
Plan resubmittals received  12/7/2009  
DetailsDan Stuart
Rec'd one copy of calcs and two copies of sheet TI-1.0- taken to Dan
Routing - PLAN CHECK10/7/2009 11/30/2009 FAIL
DetailsDan Stuart
Resubmittals of 11/25/09 inserted into plans. Two items remain to be addressed that were part of plan review of 10/2/09. Copy of plan review e-mailed to architect Ron Moss.
Plan resubmittals requested  11/30/2009 DONE
Copy of plan review e-mailed to ronwmoss@gmail.com with copy to parkerportraits@msn.com.
Telephone call  11/30/2009 DONE
Called Ron Moss to see how I could get the plan review to him. Resubmittals required. Reviewed items concerning service sink and handrail connections at exterior ramp with him. He gave me his home e-mail address to send report to him.
Plan resubmittals received  11/25/2009  
DetailsTisha Gallop
received two copies of response to comments, copy of Boise City Plan Reivew Report, specs for Tri-Temp Water Dispenser (1 pg.), specs for Swing Clear Full Mortise Template Hinges (1 pg.), letter from Congregation Ahavath Beth Israel addressed to Dan Stuart (2 pgs.), Elkay specs for wall mount water cooler (2 pgs.), plan sheets TI-1.0, TI-1.1; taken to Dan Stuart
Route to Impact Fee Review10/5/200910/8/200910/14/2009 PASS
DetailsCindy M. Gould
Tenant improvement no impact fees.
Routing - FIRE10/5/200910/5/200910/7/2009 PASS
DetailsScott Arellano
Attached IFC comments to plans
1st review completed  10/7/2009 FAIL
Failed Plan Check
Meeting  10/6/2009 DONE
SUMMARY OF MEETING CONCERNING PARKER PORTRAITS, 2620 Bannock Street, OCCUPANCY USE CHANGE, BLD09-01623.

10/6/09 - Meeting with Ron Moss, Evelyn Grimes, Jenifer Gilliland, Tim Woodard and me to discuss the plan review report and compliance requirements needed to be shown on plans.
1) Sec. 1008.1.1 - All doors or openings without doors shall provide 32" clear width.
2) The ramp construction, landing, handrails, edge protection & accessible route to meet current code.
3) New ramp that replaced original ramp was constructed without app., plans, permits or inspections. As a replacement of an existing ramp, the location should be in compliance with Sec. 1024.3, exit discharge location, requiring a 10 ft. separation from ramp to property line but it does not comply. Plans indicate 3 feet from the ramp to the property line. From the ramp to the existing west wall of the Greek Orthodox Church, based on scale of drawing at 1/8" per foot, scales as being approximately 4.33', a total of 7.33' from edge of ramp to existing building. Evelyn to provide modification request to Jason Blais, Building Official, requesting a modification per sec. 104.10, allowing the ramp to be located as shown on plans with less separation distance to the property than normally required.
3) To provide accessible wheelchair drinking fountain in corridor and a bubbler drinking fountain on the Break Room sink for standing persons for code compliance.
4) Doors 109 & 110 will probably be removed and the opening cased to provide required clear width & latch side clearances.
5) Restroom door #106 will be relocated to open in with the door against the north wall and the 18" latch side clearance from the door to the new lav OR a pocket door installed on the outside of the existing wall to meet door opening clear width and the existing door & frame removed as needed to provide the 32" clear width. If door swing is change to open to the wall, proposed use of surface mounted wall conduit strip molding to move the light switch from behind door. Door hardware on new doors 105 & 106 shall be lever style for accessibility.
5) Site plan with dimensions from building to property line from the surveyor is not required. We will use Evelyn's noted dimensions on site plan for evaluation of concerns for code requirements.
6) Evelyn will provide a signed letter from previous owners that they constructed new interior walls to create office 114 & reception 113.
7) Will provide handrails on stair to raised platform or remove the raised platform except for a 36" shelf, for storage, around the perimeter of the storage area, room 111, located north of the accordion doors OR alter stairs moving them into the platform to provide 11" clear handrail extension for one riser width so new handrails do not affect the existing accordion door location.
8) Breakroom sink is double compartment. One side will be designated as the service sink.
9) Stair landing and rise / run / rails for rear stair to comply with current code.
10) Evelyn to cut and paste dimensioned elevations for accessible water closet, grab bars and sink elevations for code compliance requirements for restroom fixtures onto her plans for use to clarify installation requirements to match her notes. Plan view data provide in enlarged restroom drawing do not show grab bars per code, clearances under accessible new lav or water closet height.
11) All doors required to be changed out to meet door clear width requirements of 32" shall have compliant accessible hardware and clearances when new doors are installed or doors & frames removed as necessary to provide the required clear width.
Plan resubmittals requested  10/5/2009 DONE
Sent e-mail copy of plan review to Ron Moss - ron@design4place.com; Evelyn Grime - evelyn@design4place.com and Jay Parker - parkerportraits@msn.com
Routing - PLAN CHECK10/1/2009 10/5/2009 FAIL
DetailsDan Stuart
Resubmittals required. Plan review e-mailed to Ron Moss, Evelyn Grime and Jay Parker. Plan routed to fire code analyst for review.
Routing - Erosion and Sediment10/1/2009 10/1/2009 PASS
DetailsSteven Webb
ESC09-00607 plan waiver approved with attached conditions.
Routing - PLANNING10/1/2009 10/1/2009 PASS
DetailsCody Riddle
Routing - PUBLIC WORKS9/30/2009 10/1/2009 PASS
DetailsBeverly Hall
New service sink & drinking fountains
Recd Pcfee & Taken To Pln CK  9/30/2009 DONE
DetailsTisha Gallop
Routing - Addressing9/30/2009 9/30/2009 PASS
DetailsApril Wing
Plan resubmittals received  9/30/2009  
DetailsTisha Gallop
received one copy of info on Pre-catalyzed Waterbased Epoxy and one copy of Topographic Survey plan sheet; taken to Dan Stuart
Routing PW Drainage9/30/2009 9/30/2009 PASS
DetailsBrian Murphy
Routing PW Sewer Rating9/30/2009 9/30/2009 PASS
DetailsConnie Baumgartner
Intake Approval  9/29/2009 PASS
Accepted into the review process for routing.
Plans ACCEPTED BY PLAN TECH  9/29/2009 DONE
DetailsTisha Gallop
Intake Approval  9/21/2009 FAIL
Submittals incomplete per checklist
Application received 9/21/2009