First Notice | | 5/14/2010 | 5/21/2010 | | DONE |
|
|
|
|
Permanent Occupancy | | | 5/4/2010 | | DONE |
|
|
|
|
BLD-Final | 3/8/2010 | 3/8/2010 | 3/8/2010 | P | PASS |
Tom Arcoraci
|
|
|
Gary Phone #: ###-####
|
FIRE-Final Inspection | 3/5/2010 | 3/5/2010 | 3/5/2010 | P | PASS |
Forrest France
|
|
|
Items on previous correction notice are finished, life safety final passed. Discussed final inspections needed for electrical and structural divisions with the contractor on site.
|
BLD-Final | 3/5/2010 | 3/5/2010 | 3/5/2010 | P | NR |
Tom Arcoraci
|
|
|
gary Phone #: ###-####
|
FIRE-Final Inspection | 3/1/2010 | 3/2/2010 | 3/2/2010 | A | FAIL |
Troy Cobbley
|
|
|
See the redline comments on the city approved plans which include providing approved hardware on all of the doors as per the scope of work and provide annual inspection for the fire extinguisher.
|
BLD-Final | 2/26/2010 | 3/1/2010 | 3/1/2010 | A | FAIL |
Tom Arcoraci
|
|
|
gary - early morning please Phone #: ###-#### needs all finals,dorr hardware ect........
|
BLD-Conference | 1/27/2010 | 1/29/2010 | 1/29/2010 | A | PASS |
Tom Arcoraci
|
|
|
Gary Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 12/24/2009 | | DONE |
|
|
|
|
(F) Reprint permit | | | 12/24/2009 | | DONE |
|
|
|
|
Plan assigned to (SRZ) | 12/22/2009 | 12/22/2009 | 12/23/2009 | | PASS |
Sam Zahorka
|
|
|
12/23/2009 11:45:32 SRZ - activity updated through activity BLDA022 from case BLD09-01625.
|
Routing - PLAN CHECK | 12/22/2009 | | 12/23/2009 | | PASS |
Sam Zahorka
|
|
|
|
Case Summary (BLD) | | | 12/23/2009 | | DONE |
Sam Zahorka
|
|
|
|
Routing - PLANNING | 12/23/2009 | | 12/23/2009 | | PASS |
Sarah Schafer
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/23/2009 | | DONE |
Sam Zahorka
|
|
|
|
Telephone call | | | 12/23/2009 | | DONE |
|
|
|
called Omar permit ready and fees given 12-23-09 dld
|
Plan Modification Accepted | | | 12/22/2009 | | |
Tisha Gallop
|
|
|
Plan Modification accepted for Bld09-01625 (Elite Dog Grooming) to provide a new accessability ramp to replace existing non-conforming ramp. New ramp will be of a different configuration to comply with ANSI code. During course of construction the existing ramp was found to be more steep than code allows. Submitted on one plan sheet; routed to Sam Zahorka
|
Plan resubmittals received | | | 12/21/2009 | | |
Tisha Gallop
|
|
|
received two copies of 1 plan sheet; taken to Sam Zahorka
|
Meeting | | | 12/18/2009 | | DONE |
Sam Zahorka
|
|
|
Attended meeting with Ken Reed the architect and Cody Riddle to discuss possible code solutions for the required accessible ramp. A possible solution was discussed and a plan modification was requested to be submitted. SRZ
|
BLD-Framing/Rough-in | 12/16/2009 | 12/16/2009 | 12/16/2009 | P | PASS |
Tom Arcoraci
|
|
|
Gary Phone #: ###-####
|
Issue PAID IN FULL permit | | | 11/3/2009 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 10/26/2009 | | 10/30/2009 | | PASS |
Sam Zahorka
|
|
|
Issuance Pending Planning to pass. Routed to Planning.
|
Case Summary (BLD) | | | 10/30/2009 | | DONE |
Sam Zahorka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/30/2009 | | DONE |
Sam Zahorka
|
|
|
|
Print Occupancy Form | | | 10/30/2009 | | DONE |
|
|
|
|
Telephone call | | | 10/30/2009 | | DONE |
|
|
|
left vm for kenneth reed at ###-#### - permit ready and fees given - also need gc name, rce# and ACHD receipt
|
Permit Ready to Issue | | | 10/30/2009 | | DONE |
|
|
|
|
Plan assigned to (SRZ) | 9/22/2009 | | 10/30/2009 | | PASS |
Sam Zahorka
|
|
|
10/30/2009 13:15:06 SRZ - activity updated through activity BLDA022 from case BLD09-01625.
|
Plan resubmittals received | | | 10/27/2009 | | DONE |
Tisha Gallop
|
|
|
received letter and two copies of one plan sheet; taken to Sam Zahorka
|
Meeting | | | 10/27/2009 | | DONE |
Sam Zahorka
|
|
|
Met with the architect and discussed his resubmittals and corrections. He suggested I wait to review until he delivers letter explaining actual cost of alterations for occupancy change and 20% estimate for accessiblility upgrades.
|
Case Summary (BLD) | | | 10/26/2009 | | DONE |
Sam Zahorka
|
|
|
|
Routing - PLAN CHECK | 10/12/2009 | | 10/26/2009 | | FAIL |
Sam Zahorka
|
|
|
2nd plan review completed. Emailed corrections to the architect.
|
Plan resubmittals received | | | 10/19/2009 | | |
Tisha Gallop
|
|
|
received response letter and two copies of plan sheet (no page number); taken to Sam Zahorka
|
1st review completed | | | 10/12/2009 | | FAIL |
|
|
|
Failed Plan Check
|
Routing - FIRE | 10/6/2009 | | 10/12/2009 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
Routing - PLAN CHECK | 9/25/2009 | | 10/6/2009 | | FAIL |
Sam Zahorka
|
|
|
Emailed corrections to the architect.
|
Routing - PLANNING | 10/6/2009 | | 10/6/2009 | | PASS |
Cody Riddle
|
|
|
|
Case Summary (BLD) | | | 10/5/2009 | | DONE |
Sam Zahorka
|
|
|
|
Telephone call | | | 10/2/2009 | | DONE |
Sam Zahorka
|
|
|
Returned Ken Reeds telephone call from yesterday. He left a message inquiring on status. This permit was routed to me on 9/25/09 and I started my review on 10/1/09.
|
Routing - PLUMBING | 9/23/2009 | | 9/25/2009 | | PASS |
Bill VanDegrift
|
|
|
minor plumbing remodel, existing to ada. a cross connection inspection will be required at the rough-in inspection and upgrades may be required. Pet grooming
|
Routing - PUBLIC WORKS | 9/22/2009 | | 9/23/2009 | | PASS |
Beverly Hall
|
|
|
|
Telephone call | | | 9/23/2009 | | DONE |
Sam Zahorka
|
|
|
I called Ken Reed the Architect and suggested he contact ACHD becuse of the change of use for this building. I let him know they require their own submittals and fees. I re-inforced we can not issue the building permit until ACHD has approved and signed off. I also let him know Planning and Plumbing approval will be needed and possibly a plumbing plan will be required. **SRZ**
|
Routing PW Sewer Rating | 9/23/2009 | | 9/23/2009 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 9/22/2009 | | 9/22/2009 | | PASS |
April Wing
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/22/2009 | | DONE |
Tisha Gallop
|
|
|
|
Pending Assignment by JCB | 9/22/2009 | | 9/22/2009 | | DONE |
Jason Blais
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/21/2009 | | DONE |
Tisha Gallop
|
|
|
|
Application received | | 9/21/2009 | | | |
|
|
|
|