Permit Information
Permit NumberBLD09-01636
StatusFinaled
Name ROBINSON KEVIN P
Site Address 1024 W PARKHILL DR
Project Name 
Customer Number 
ePlanReviewNo
Description
This project is for the placement of a new 500s.f. above grade, open detached deck structure. ESC permit is waived due to the small scope of excavation and land disturbance. R-1B ok per Colleen Carroll. All per the approved plans as marked and the plan review notes. pep
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/21/20106/21/20106/21/2010PPASS
DetailsTony Young
Kevin-Please call at least 30 mins prior to inspection Phone #: ###-####,, structure meets min. code at this time
DOC - Permit Finaled6/21/20106/21/20106/21/2010PPASS
DetailsTony Young
BLD - Request for Extension5/6/20105/7/20105/7/2010APASS
DetailsTony Young
Kevin Phone #: ###-####
BLD-Conference12/8/200912/8/200912/8/2009PPASS
DetailsTony Young
Recieved call from Kolby Orcher,, structural engineer,, he okayed all structural thus far,, ie: footings, and deck connections,, deck has been cut back beyond 9' setback,, all material, etc appears to be on applicants property according to p/line flags/survey,,, owner will complete work in spring as weather permits
BLD-Foundation12/7/200912/7/200912/8/2009PPART
DetailsTony Young
Kevin Phone #: ###-####
will get foundation signed off by engineer,,
NOTE, deck was cut back to meet setbacks,, required 9' is met
BLD-Conference11/17/200911/19/200911/25/2009APART
DetailsTony Young
someone called in to see if they got a permit and said the work was already done. There were no inspections done
4464, will call when ready
BLD-Conference11/23/200911/25/200911/25/2009APART
DetailsTony Young
someone called in to see if they got a permit and said the work was already done. There were no inspections done.
owner said he would call for inspections when ready,, he will get footings signed off by engineer if they are poured,,(could not verify,, did not go past front door of house), said he had soil report in hand,, Spoke via intercom on exterior of house,, ok for now,, will wait for him to call in for inspections
BLD-Conference11/16/200911/17/200911/19/2009ANH
DetailsTony Young
someone called in to see if they got a permit and said the work was already done. There were no inspections done.
will keep trying to catch owner home
BLD-Conference11/13/200911/16/200911/16/2009ANH
DetailsTony Young
someone called in to see if they got a permit and said the work was already done. There were no inspections done.
PubWorks Subgrade Approval10/29/200910/29/200910/29/2009 DONE
DetailsTerry Records
Footing subgrade approved by the geotechnical engineer
Routing Walk-In (BLD)9/29/20099/29/20099/29/2009ADONE
DetailsPerry Paine
9/29/2009 10:39:04 PEP - activity updated through activity BLDA022 from case BLD09-01636.
Plan assigned to (PEP)9/29/20099/29/20099/29/2009 DONE
DetailsPerry Paine
1st review completed  9/29/2009  
PLANS/APPL TAKEN TO FRONT DESK  9/29/2009  
Permit Ready to Issue  9/29/2009 DONE
DetailsTisha Gallop
Issue PAID IN FULL permit  9/29/2009 DONE
DetailsTisha Gallop
Case Summary (BLD)  9/29/2009  
Inspection Record Card- Bld  9/29/2009  
Routing Walk-In (BLD)9/23/20099/23/20099/23/2009ADONE
DetailsAlexandra L. DeYoung
9/23/2009 11:36:49 ALR - activity updated through activity BLDI260 from case BLD09-01636.
Routing Walk-In (Zoning)9/23/20099/23/20099/23/2009PPASS
DetailsColleen T Carroll
Routing Walk-In (BLD)9/23/20099/23/20099/23/2009PFAIL
DetailsPerry Paine
Routing - PUBLIC WORKS GRADING9/23/2009 9/23/2009 PASS
DetailsTerry Records
A letter from the applicant's geotechnical engineer indicating that the footing subgrade is acceptable must be approved by Public Works prior to scheduling an inspection. Call Terry Records at ###-####.
Application received 9/23/2009