Information based on query as of Thursday, July 4, 2024.
Permit Information
Permit NumberBLD09-01689
StatusFinaled
Name RRC CONTRACTORS
Site Address 2200 E WARM SPRINGS AVE STE 108
Project NameWARM SPRINGS OFFICE BLDG
Customer Number 
ePlanReviewNo
Description
(DR. TYLER SMITH - Architects Office - STE#108) Permit is for a new 2,067 square foot buisness tenant (Dentist Office) in an existing 5,100 square foot office shell (BLD07-02352). Approval per approved plans on file. Work to include: [construction of interior non-bearing walls to create five treatment rooms, three offices, a sterile room, a lab, a unisex restroom, a mechanical room, a medical gas room (surrounded by one hour fire barriers), a waiting room, and a staff lounge], installation of new plumbing, installation of new electrical, installation of new doors and hardware, and interior finishes in compliance with chapter 8 of the 2006 IBC. This building is not fire sprinklered. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 2/7/20102/23/2010 DONE
First Notice 1/17/20101/28/2010 DONE
FIRE-Final Inspection1/7/20101/7/20101/7/2010APASS
DetailsForrest France
Correction items verified for completion, notified tenant to obtain CO at city hall.
Print Occupancy Form  1/7/2010 DONE
Permanent Occupancy UNPAID FEE  1/7/2010 DONE
DetailsBarbara Stitt
FIRE-Final Inspection12/11/200912/11/200912/11/2009PPASS
DetailsForrest France
Fire life safety approved pending installation of "door to remain..... " signage at the main entry/exit, and seal at the door to the med. gas closet- to be completed prior to structural final inspection as discussed.
BLD-Final12/11/200912/11/200912/11/2009PPASS
DetailsDave Hannah
Derrick Phone #: ###-####
FIRE-Final Inspection12/9/200912/9/200912/9/2009PNR
DetailsForrest France
Contact Phone #: ###-####
BLD-Other12/7/200912/7/200912/7/2009PPASS
DetailsDave Hannah
Derik Phone #: ###-#### ok to cover ceiling
BLD-Other12/1/200912/1/200912/2/2009PPART
DetailsDave Hannah
Drek Phone #: ###-#### everything ok but for mec def need wires
BLD-Framing/Rough-in11/2/200911/3/200911/5/2009PPASS
DetailsDave Hannah
derik Phone #: ###-####
FIRE-Final Inspection11/4/200911/4/200911/4/2009PNR
DetailsForrest France
Construction underway, work in progress.
Received Certificate of Value  10/9/2009 DONE
DetailsBarbara Stitt
Received and documented revised cert of value for fees
Issue PAID IN FULL permit  10/9/2009 DONE
Print Occupancy Form  10/8/2009 DONE
Permit Ready to Issue  10/8/2009 DONE
Plan assigned to (TLW)10/1/2009 10/7/2009 PASS
DetailsTim L. Woodard
10/7/2009 16:42:48 TLW - activity updated through activity BLDA022 from case BLD09-01689.
Routing - PLAN CHECK10/7/2009 10/7/2009 PASS
DetailsTim L. Woodard
Approved with Redlines.
Routing - PLUMBING10/5/2009 10/7/2009 PASS
DetailsBill VanDegrift
max. 1 1/2" horizontal vent is 20'. 8 f.u. max on 2" horizontal waste. change P-6 hub drain to a floor sink for R.P. discharge. R.P. on vac pump, min. AVB on model trimmer. provide warning system on O2 and NO2.
Routing - FIRE  10/7/2009 PASS
DetailsTim L. Woodard
Field Verify. TLW
1st review completed  10/7/2009 DONE
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  10/7/2009 DONE
DetailsTim L. Woodard
Case Summary (BLD)  10/7/2009 DONE
DetailsTim L. Woodard
Case Summary (BLD)  10/7/2009 DONE
DetailsTim L. Woodard
Routing - PUBLIC WORKS10/1/2009 10/5/2009 PASS
DetailsBeverly Hall
approved on drawings and in Public Works sheet.
Routing - Addressing10/2/2009 10/2/2009 PASS
DetailsApril Wing
Routing PW Sewer Rating10/2/2009 10/2/2009 PASS
DetailsConnie Baumgartner
Application received 9/30/200910/1/2009 DONE
Recd Pcfee & Taken To Pln CK  10/1/2009 DONE
DetailsTisha Gallop
Plans ACCEPTED BY PLAN TECH  9/30/2009 DONE
DetailsTisha Gallop