Permit Information
Permit NumberBLD09-01711
StatusFinaled
Name ALTA CONSTRUCTION
Site Address 11818 W JOPLIN RD
Project Name 
Customer Number 
ePlanReviewNo
Description
Boise Public Works- West Boise Central Lab - Metals Lab Addition - To construct a 3,675 square foot, one story, wood framed addition on the west end of the existing West Boise Central Laboratory building. And to do a small remodel within the existing building between grid lines 3 & 4 and B & D. This addition will include two new Metals Instruments Rooms, two new Preparation Rooms and two new Acid Wash Rooms, a new Mechanical Room, a new AWN Room and new entry. This addition will also have a five foot high mechanical attic. All construction per the approved plans and attached comment list.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 6/27/20116/28/2011 DONE
Third Notice 5/30/20116/13/2011 DONE
interoffice mail to PW, Jackie Huffman
Second Notice 5/20/20115/25/2011 DONE
First Notice 5/6/20115/10/2011 DONE
BLD-Final4/25/20114/26/20114/26/2011APASS
DetailsJim Sly
Jeremy Phone #: ###-####
OK for Perm Occ.
Permanent Occupancy  4/26/2011 DONE
DetailsChristina Prado
Print Occupancy Form  4/25/2011 DONE
BLD-Final4/13/20114/13/20114/13/2011PPART
DetailsJim Sly
OK to Occupy. C/N ...Temp Occ..... Need Erosion control finaled After landscaping.
BLD-Final4/13/20114/13/20114/13/2011ACANC
DetailsJim Sly
Re-sched....
BLD-Final4/11/20114/12/20114/13/2011ANR
DetailsJim Sly
Brice Phone #: ###-####
PubWorks Occupancy Approval4/13/20114/13/20114/13/2011 DONE
DetailsTiffany Lowery
BLD-Final4/8/20114/11/20114/11/2011ANR
DetailsJim Sly
Bryce Phone #: ###-####
Complete prior corr notice........
BLD-Final4/7/20114/8/20114/11/2011PNR
DetailsJim Sly
bryce Phone #: ###-####
FIRE-Final Inspection4/7/20114/8/20114/8/2011APASS
DetailsTroy Cobbley
life safety passed
BLD-Final4/5/20114/6/20114/6/2011PFAIL
DetailsJim Sly
Jeremy Allen Phone #: ###-####
C/N Provide UL listings for firestopping all penitrations thru 1hr wall Mech room. Access hatch (door) to attic space from Mech room to close un-assisted and latch.
Need fire life safety final.
Zoning Approval4/6/20114/6/20114/6/2011 DONE
DetailsJoshua Johnson
BLD-Framing/Rough-in3/14/20113/15/20113/15/2011APART
DetailsJim Sly
Jeremy Allen Phone #: ###-####
2 small walls......autoclave and data rooms.....pending plan modifiction for structural and fire sprinkler.
BLD-Final2/15/20112/16/20112/16/2011PPART
DetailsJim Sly
Jeremy Phone #: ###-####
OK to Occupy phase 2 area.
FIRE-Final Inspection2/15/20112/16/20112/16/2011APART
DetailsTroy Cobbley
The new addition is ok to occupy. Phase III work still needs to be completed prior to a final sign off.
FIRE-Conference2/14/20112/15/20112/15/2011ADONE
DetailsTroy Cobbley
I went over life safety requirements with the job superintendant. They included relocating the electric alarm bell to the new FDC location.
FIRE-Conference1/14/20111/14/20111/14/2011PDONE
DetailsTroy Cobbley
Prior to life safety sign off the electric alarm bell, for the fire sprinkler system, will be required to be relocated and installed at the new FDC location. The general contractor was not on site to address this issue with.
BLD-Conference11/3/201011/3/201011/3/2010PCANC
DetailsJim Sly
WIP
BLD-Energy code compliance8/23/20108/24/20108/24/2010APART
DetailsJim Sly
Jeremy Phone #: ###-####
Concealed corner spaces are filled completely with insulation.
BLD-Energy code compliance8/19/20108/20/20108/20/2010APART
DetailsJim Sly
jeremy Phone #: ###-####
Wall insulation OK main floor......Need to inspect concealed spaces at (5) corner areas built to allow for air intakes. These areas need to be filled with insulation from floor to ceiling.
BLD-Framing/Rough-in8/18/20108/18/20108/18/2010PPART
DetailsJim Sly
jeremy Phone #: ###-####
Main floor except Mech room OK to insulate.
BLD-Framing/Rough-in7/22/20107/23/20107/23/2010APART
DetailsJim Sly
Jeremy Phone #: ###-####
Small roof above crushing table OK..... Architect to advise...... Firestopping of Plumb cleanout penitrations thru membrane 1hr wall...... continuation of 1hr membrane at rim area of floor.....
BLD-Energy code compliance7/19/20107/20/20107/20/2010PPART
DetailsDave Hannah
Jeremy Phone #: ###-#### walls of mezzanine ok to cover
BLD-Final7/7/20107/7/20107/7/2010PNR
DetailsJim Sly
Jeremy Phone #: ###-####
Should have been frame insp. Flat roof OK
BLD-Energy code compliance6/21/20106/22/20106/22/2010PPART
DetailsJim Sly
Jeremy Allen Phone #: ###-####
Wall pre-rocked for Electr panels......OK
BLD-Framing/Rough-in6/16/20106/17/20106/17/2010APART
DetailsJim Sly
Roof sheating and wall sheating inspection please-Jeremy Phone #: ###-####
Roof and Exterior shear nailing OK.....except shear panel missing at panel South of door in West wall. Engineer to advise.
BLD-Footing6/8/20106/9/20106/9/2010APART
DetailsJim Sly
jeremy - rebar Phone #: ###-####
Soil grinding room.....OK pending Special inspection STRATA tests and approvals.
BLD-Foundation4/23/20104/26/20104/26/2010APART
DetailsJim Sly
slab inspectioin//Jeremy Allen Phone #: ###-####
OK pending STRATA special inspection, tests, and approvals
BLD-Foundation4/2/20104/5/20104/5/2010APART
DetailsJim Sly
Jeremy Phone #: ###-####
OK pending MTI inspections, tests and approvals.
BLD-Footing3/30/20103/31/20103/31/2010APART
DetailsJim Sly
Jeremy Phone #: ###-####
OK pending MTI special inspections, tests and approvals.
Issue PAID IN FULL permit  1/4/2010 DONE
DetailsTisha Gallop
Print Occupancy Form  12/30/2009 DONE
DetailsTisha Gallop
Print Occupancy Form  12/23/2009 DONE
Telephone call  12/23/2009 DONE
Details
t/c w steve at ###-#### - permit ready and fees given - also need gc name, rce#, ACHD receipt and rp
Permit Ready to Issue  12/23/2009 DONE
Details
Plan resubmittals received  12/22/2009 DONE
received transmittal letter, structural calculations, 3 sets of S2.1, S3.1, S5.3, S5.4 - taken to john menard
Plan Reviewer's activity  12/22/2009 PASS
DetailsJohn Menard
Reviewed and approved final structural revisions. JCM
PLANS/APPL TAKEN TO FRONT DESK  12/22/2009 DONE
DetailsJohn Menard
Plan assigned to (JCM)10/1/2009 12/22/2009 PASS
DetailsJohn Menard
12/22/2009 15:21:53 JCM - activity updated through activity BLDA022 from case BLD09-01711.
Routing - PLAN CHECK11/23/2009 12/22/2009 PASS
DetailsJohn Menard
Routing Off Site - STRUCTURAL12/14/2009 12/21/2009 FAIL
DetailsJohn Menard
Received structural comment list requesting additional revisions. JCM
Plan resubmittals requested  12/21/2009 DONE
DetailsJohn Menard
E-mailed the architect a copy of the third structural review list requesting additional revisions. JCM
Telephone call  12/14/2009 DONE
DetailsTisha Gallop
called Action Couriers for pick-up
Plan resubmittals received  12/11/2009  
DetailsJohn Menard
received 3 sets of S2.1, S3.1, S5.2, S5.3, S5.4 - transmittal letter, calculation sheets - inserted to by arch rep - taken to john menard
Routing Off Site - STRUCTURAL11/20/2009 12/4/2009 FAIL
DetailsJohn Menard
Received comment list from consulting engineer for second review requesting revisions. JCM
Plan resubmittals requested  12/4/2009 DONE
DetailsJohn Menard
E-mialed the architect a copy of the second structural reveiw requesting additional revisions. JCM
Plan resubmittals received  11/23/2009 DONE
DetailsJohn Menard
rec'd two copies of sheets c3.0 and c4.0- taken to john m
Routing - PLUMBING11/20/2009 11/23/2009 PASS
DetailsBill VanDegrift
sewer service piping has been moved out from under soils grinding area.
Plan resubmittals received  11/20/2009 DONE
DetailsBarbara Stitt
Received 1 cover transmittal letter from Insight Architects, 1copy of Supplemental structural calculations,1 copy of S2.1, S3.1, S3.4, S5.4 and called Action Courier for pick up per John Menard
Routing - PLAN CHECK11/13/2009 11/20/2009 PASS
DetailsJohn Menard
Plan resubmittals received  11/19/2009  
DetailsJohn Menard
Received 1 cover transmittal letter from Insight Architects, 2 copies of Supplemental structural calculations, 2 copies of A1.1, A10.1, A10.2, A11.1, S2.1, S3.1, S3.4, S5.4, P1.1, P3.1 and taken to John Menard
Route to Impact Fee Review11/5/200911/10/200911/17/2009 PASS
DetailsCindy M. Gould
Fire and Police impact fees applied
Routing - FIRE11/5/200911/5/200911/13/2009 PASS
DetailsScott Arellano
Attached IFC comments to plans
1st review completed  11/13/2009 FAIL
Failed Structural, Plumbing, Planning, Plan Check
Routing - PLAN CHECK10/22/2009 11/5/2009 FAIL
DetailsJohn Menard
Routing - PLANNING10/21/2009 10/21/2009 PASS
DetailsJoshua Johnson
Cup09-00068 Josh Johnson
Routing - PLUMBING10/14/2009 10/21/2009 FAIL
DetailsBill VanDegrift
SDR 35 piping is not approved under the soils grinding area. vents from sanitary sewer connected fixtures may not connect to acid waste vents. a PVB will be required on the eye wash-1 by acid tank. verify existing cross connection control. address items 1&2 and resubmit.
Routing Off Site - STRUCTURAL10/1/2009 10/20/2009 FAIL
DetailsJohn Menard
Received comment list from the consulting structural engineer requesting revisions. JCM
Plan resubmittals requested  10/20/2009 DONE
DetailsJohn Menard
E-mailed the architect a copy of the structural review requesting revisions. JCM
Routing PW Sewer Rating10/14/2009 10/14/2009 PASS
DetailsConnie Baumgartner
Routing - Erosion and Sediment10/14/2009 10/14/2009 PASS
DetailsSteven Webb
ESC plan approved with attached conditions. ESC09-00614
Routing - PUBLIC WORKS10/2/2009 10/14/2009 PASS
DetailsBeverly Hall
Routing PW Sewer Design10/12/2009 10/13/2009 PASS
DetailsJon R. Gunnerson
SEWER TAP PERMIT REQUIRED
Routing PW Solid Waste10/13/2009 10/13/2009 PASS
DetailsPeter J. McCullough
Routing PW Environmental10/13/2009 10/13/2009 PASS
DetailsWalt Baumgartner
Reviewed - Pretreatment Group
Routing PW Drainage10/6/2009 10/13/2009 PASS
DetailsBrian Murphy
Routing PW Flood Plain10/13/2009 10/13/2009 PASS
DetailsJim Wyllie
Routing - Addressing10/6/2009 10/6/2009 PASS
DetailsApril Wing
Routing - PLANNING Land Div10/1/2009 10/2/2009 PASS
DetailsTodd Tucker
Plans ACCEPTED BY PLAN TECH  10/1/2009 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  10/1/2009 DONE
DetailsTisha Gallop
Pending Assignment by JCM10/1/2009 10/1/2009 BLDA
DetailsJohn Menard
10/1/2009 14:42:55 JCM - activity updated through activity BLDA166 from case BLD09-01711.
Telephone call  10/1/2009 DONE
DetailsTisha Gallop
called Action Couriers for pick up
Application received 10/1/2009