Trinity Trailer Manufacturing Inc. - (suite 300) Permit for minor tenant improvements to an existing space with work to include the construction of 715 sq. ft. of office space including two accessible restrooms within a 11,095 sq. ft. tenant space, HVAC unit for the office space with the blower unit and ducting to be installed on the equipment platform above the offices. All work to be done per the approve plans. This is a fully sprinkled building (for area increase) any alterations to the sprinkler system will require a separate permit and shall comply with NFPA13 as regulated by the City of Boise Fire Department. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 6/20/20107/15/2010 DONE
BLD-Final6/9/20106/10/20106/10/2010APASS
DetailsJim Storey
pete Phone #: ###-#### - please call so he can meet you there final ok
Permanent Occupancy  6/10/2010 DONE
FIRE-Final Inspection6/2/20106/3/20106/3/2010APASS
DetailsForrest France
Fire life safety completed acceptable, inspection passed.
BLD-Final6/2/20106/2/20106/2/2010PNR
DetailsJim Storey
pete - please call 1/2 hr prior so he can meet you there Phone #: ###-####
FIRE-Final Inspection4/19/20104/19/20104/19/2010APART
DetailsForrest France
See activity notes 3/25
FIRE-Final Inspection3/25/20103/25/20103/25/2010PNR
DetailsForrest France
Need project related fire sprinkler permit final prior to fire life safety approvals.
BLD-Energy code compliance3/1/20103/2/20103/2/2010PPASS
DetailsJim Storey
Pete Phone #: ###-####-Please call prior to inspection
BLD-Framing/Rough-in2/19/20102/22/20102/22/2010APASS
DetailsJim Storey
pete - please call 1/2 hr prior Phone #: ###-####
BLD-Aging Inspection1/15/20101/15/20101/15/2010 PASS
DetailsJim Storey
wip
Issue PAID IN FULL permit  10/16/2009 DONE
OVERRIDE  10/13/2009  
OVERRIDE  10/13/2009  
OVERRIDE  10/13/2009  
Plan assigned to (CDM)10/6/200910/6/200910/13/2009 PASS
DetailsCarl D Madsen
10/13/2009 11:28:33 CDM - activity updated through activity BLDA022 from case BLD09-01739.
Routing - PLAN CHECK10/7/2009 10/13/2009 PASS
DetailsCarl D Madsen
Case Summary (BLD)  10/13/2009 DONE
DetailsCarl D Madsen
Routing - FIRE  10/13/2009 PASS
Verify in field CDM
1st review completed  10/13/2009 DONE
PLANS/APPL TAKEN TO FRONT DESK  10/13/2009  
Print Occupancy Form  10/13/2009 DONE
Details
Telephone call  10/13/2009 DONE
Details
t/c w dale at ###-#### - permit ready and fees given - also need gc name and rce#
Override - Parcel Holds  10/13/2009  
Permit Ready to Issue  10/13/2009 DONE
Details
Routing - PUBLIC WORKS10/6/2009 10/7/2009 PASS
DetailsBeverly Hall
Routing PW Sewer Rating10/7/2009 10/7/2009 PASS
DetailsConnie Baumgartner
Plans ACCEPTED BY PLAN TECH  10/6/2009 DONE
DetailsTisha Gallop
Override - Parcel Holds  10/6/2009  
Recd Pcfee & Taken To Pln CK  10/6/2009 DONE
DetailsTisha Gallop
Routing - Addressing10/6/2009 10/6/2009 PASS
DetailsApril Wing
Application received 10/6/2009