Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD09-01742
StatusFinaled
Name HC COMPANY INC
Site Address 2748 S VICTORY VIEW WAY
Project NameVIC PARK BUILDING #3
Customer Number 
ePlanReviewNo
Description
(BRINKS) New tenant in 6,042 sq. ft. vacant space created under BLD09-01867, part of a 32,350 sq. ft. existing shell building per approved plans. Work to include select demolition of floor & wall to install interior concrete footings for interior masonry walls and vault slab and new window & man door; frame wall construction to create administrative offices, conference room and support areas; new overhead doors, mandoor & exterior window; access control hardware for this security facility with doors openable from egress side per section 1008.1.8, 2006 IBC; structural modifications for support of exterior walls at new openings and roof structure for HVAC units per plans; two fully accessible restrooms (men / women):interior finishes and upgrade of electrical, mechanical, plumbing, sprinkler and alarm systems. Shell building was constructed under permit BLD07-00737. NOTE: This building is fully fire sprinklered. drs CZC09-00181 3-29-10 FINAL CERT OF VALUE PER GC$ 431,408.00 ///DLD
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Telephone call  7/2/2010 DONE
DetailsTisha Gallop
called Carl Fisher/Brinks, we received a check from Brinks for $62.17. Told him that statement for $62.17 (the initial pln check fee based on the final value) was sent out in error. The final value fees are actually $346.22. Per Carl's request sent back the check for $62.17 and a new invoice for the $346.22 to Brink Inc, Attn: Naresh Srinivasan, 555 Dividend Dr. Ste 100, Coppell, TX 75019.
Case Summary (BLD)  4/29/2010 DONE
DetailsTisha Gallop
Telephone call  4/5/2010 DONE
DetailsTisha Gallop
per phone call from Matt/HC Co. bill for final value fees should be sent to Brinks Inc.
Third Notice 3/30/20103/29/2010 DONE
Second Notice 3/20/20103/25/2010 DONE
First Notice 3/5/20103/10/2010 DONE
Permanent Occupancy  2/23/2010 DONE
DetailsTisha Gallop
BLD-Final2/16/20102/16/20102/16/2010PPASS
DetailsMike Jordan
Call 1/2 hour upon arrival, thanks. Inspection requested from web by: Darren Gossett Phone #: ###-####. ok for perm occ.
FIRE-Final Inspection2/16/20102/16/20102/16/2010PPASS
DetailsTroy Cobbley
Life safety passed. The access controlled egress doors 200 A & B, 204 A & C wil not be required to have the sensor on the egress side as per IFC 1008.1.3.4 and Dan Stuart and Jason Blaise's approval.
Plan Reviewer's activity  2/16/2010 DONE
Phone call from Troy Cobbley, fire inspector, concerning operation of exit door hardware. Due to high security, there is a sally port between main exit doors. Doors have mag locks on threat side and have door operation from egress side interconnected with door operation / security such that the only one door can be open at a time. In an emergency situation were the is a loss of power or an alarm goes off the doors are fell safe and unlock. Visited with Troy Cobbley after talking about the security issues with Jason Blais, Building Official. The extra security is allowed with the fail safe features.
FIRE-Final Inspection2/11/20102/12/20102/12/2010ACANC
DetailsTroy Cobbley
The project related fire alarm permit needs to be finaled and the exit signs/emergency lighting inspected. Other life safety items have been verified.
BLD-Other2/2/20102/2/20102/2/2010PPASS
DetailsMike Jordan
Please call 1/2 hour prior to arrival, thanks! Phone #: ###-#### Internet Inspection Request from: Darren Gossett. Ceiling grid ok.
BLD-Energy code compliance2/2/20102/2/20102/2/2010PPASS
DetailsMike Jordan
Please call 1/2 hour prior to arrival, thanks! Phone #: ###-#### Internet Inspection Request from: Darren Gossett
BLD-Energy code compliance1/6/20101/6/20101/6/2010PNR
DetailsMike Jordan
Please call 1/2 hour upon arrival, thanks. Phone #: ###-#### Internet Inspection Request from: Darren Gossett
BLD-Wall cover1/4/20101/4/20101/4/2010APART
DetailsMike Jordan
Please call 1/2 hour upon arrival, thanks. Phone #: ###-#### Internet Inspection Request from: Darren Gossett. Interior steel stud framed walls and furuots. Pend. elec. plumbing, and mech.
BLD-Foundation12/17/200912/18/200912/18/2009APART
DetailsMike Jordan
Pouring grout at 8:00 am. Phone #: ###-#### Internet Inspection Request from: Darren Gossett. wip.
BLD-Foundation12/16/200912/17/200912/17/2009ADEFR
DetailsMike Jordan
Pouring grout at 11:00 am. Phone #: ###-#### Internet Inspection Request from: Darren Gossett. Special insp. on site.
BLD-Foundation12/16/200912/16/200912/16/2009PPART
DetailsMike Jordan
Pouring grout at 12:30 pm. Phone #: ###-#### Internet Inspection Request from: Darren Gossett. wip. top of wall for interior masonry walls. Special insp. on site.
BLD-Conference12/15/200912/15/200912/15/2009ACANC
DetailsMike Jordan
Pouring grout at 9:00 am.
Phone #: ###-#### Internet Inspection Request from: Darren Gossett. Grout was cancelled. Will have special insp.
BLD-Foundation12/14/200912/14/200912/14/2009PPART
DetailsMike Jordan
Grout pour at 2:00 pm. Phone #: ###-#### Internet Inspection Request from: Darren Gossett. wip on interior masonry walls.
BLD-Foundation12/10/200912/10/200912/10/2009PCANC
DetailsMike Jordan
Daren Phone #: ###-####. Grout placement has been cancelled.
BLD-Foundation12/9/200912/10/200912/10/2009APART
DetailsMike Jordan
Pouring grout at 9:00 am. Phone #: ###-#### Internet Inspection Request from: Darren Gossett Reviewed special insp. reports to date.
BLD-Foundation12/7/200912/8/200912/8/2009APART
DetailsMike Jordan
Pouring grout at 11:00 am. Phone #: ###-#### Internet Inspection Request from: Darren Gossett. Interior masonry walls from 12ft. to 16ft. elev. wip. Special insp. will be on site.
BLD-Foundation12/4/200912/7/200912/7/2009APART
DetailsMike Jordan
Pouring grout at 8:30 am. Phone #: ###-#### Internet Inspection Request from: Darren Gossett. Wip on interior masonry walls from 8ft. to 12ft. elev. Special insp. on site.
BLD-Conference12/4/200912/7/200912/7/2009ACANC
DetailsMike Jordan
Can we please have the conference at 10:00 am? Phone #: ###-#### Internet Inspection Request from: Darren Gossett
BLD-Foundation12/3/200912/4/200912/4/2009APART
DetailsMike Jordan
Pouring grout at 8:30 am. Phone #: ###-#### Internet Inspection Request from: Darren Gossett. Special inspector on site. Grout placement from 4ft. to 8ft. elev.
BLD-Foundation12/2/200912/3/200912/3/2009ACANC
DetailsMike Jordan
Pouring grout at 12 pm. Phone #: ###-#### Internet Inspection Request from: Darren Gossett. Grout placement rescheduled for tommorow in the am. wip in 4ft. to 8ft. elev.
BLD-Foundation12/1/200912/2/200912/2/2009APART
DetailsMike Jordan
Pouring block at 12 pm Phone #: ###-#### Internet Inspection Request from: Darren Gossett. wip on interior masonry walls, 0 to 4ft. elev. Will have special insp.
BLD-Footing11/24/200911/25/200911/25/2009APASS
DetailsMike Jordan
Phone #: ###-#### Internet Inspection Request from: Darren Gossett. INterior footings and matt slab rieinforcement. SPecial insp. on site.
Telephone call  11/24/2009 DONE
DetailsBarbara Stitt
Called Rick Lavelle at 1-###-#### ext 16 and told him that permit is ready, fees due, need GC, RCE # and RP information///11-24-09 @ 11:15am BAS
Permit Ready to Issue  11/24/2009 DONE
DetailsBarbara Stitt
Issue PAID IN FULL permit  11/24/2009 DONE
Print Occupancy Form  11/23/2009 DONE
Details
Route to Impact Fee Review11/17/200911/20/200911/20/2009 PASS
DetailsCindy M. Gould
tenant improvement no fees
Routing - FIRE11/17/200911/17/200911/20/2009 PASS
DetailsScott Arellano
Attached IFC comments to plans
Plan assigned to (DRS)11/2/2009 11/20/2009 PASS
DetailsDan Stuart
11/20/2009 12:59:39 DRS - activity updated through activity BLDA022 from case BLD09-01742.
1st review completed  11/20/2009 FAIL
Failed Public Works
Routing - PLAN CHECK11/20/2009 11/20/2009 PASS
DetailsDan Stuart
To permit desk to issue.
PLANS/APPL TAKEN TO FRONT DESK  11/20/2009 PASS
Plan Reviewer's activity  11/17/2009 DONE
Resubmittals are NOT required. Copy of plan review e-mailed to architect for his records.
Routing - PLAN CHECK11/10/2009 11/17/2009 PASS
DetailsDan Stuart
Routing to fire code analyst for review.
Routing - PUBLIC WORKS11/10/2009 11/10/2009 PASS
DetailsBeverly Hall
Routing - PLAN CHECK11/10/2009 11/10/2009 PEND
DetailsDan Stuart
Routed back to plumbing for re-review.
Routing - PLUMBING  11/10/2009 PASS
DetailsBill VanDegrift
the vepor vent off of the tank must extend through the roof separatly.
Routing - PLAN CHECK11/5/2009 11/9/2009 PEND
DetailsDan Stuart
Routed back to PW
Plan resubmittals received  11/6/2009 DONE
Rec'd 2 copies of sheets p100 and p200- inserted and taken back to Dan S
Routing PW Environmental11/6/2009 11/6/2009 PASS
DetailsWalt Baumgartner
OK. single floor sink in garage for snowmelt to route to small flamm trap (Watts OI-15) to be located in the floor in adjacent store room.
Routing - Erosion and Sediment11/3/2009 11/5/2009 PASS
DetailsSteven Webb
ESC plan waiver approved with attached conditions. ESC09-00690
Routing - PLANNING11/5/2009 11/5/2009 PASS
DetailsJosh Wilson
OK per DRH09-00261
Routing PW Environmental11/4/2009 11/4/2009 FAIL
DetailsWalt Baumgartner
Routing - PUBLIC WORKS11/2/2009 11/4/2009 FAIL
DetailsConnie Baumgartner
Failed by Environment, contact Walt Baumgartner at ###-####
Routing PW Sewer Rating11/3/2009 11/3/2009 PASS
DetailsConnie Baumgartner
Pending Assignment by JCB10/29/2009 11/2/2009 DONE
DetailsJason Blais
Intake Approval  10/29/2009 PASS
Telephone call  10/29/2009 DONE
DetailsTisha Gallop
called Rick Lavelle and left voice message need submittal fee, ESC app and waiver letter, plm, mech, and ele initial values. 10:22am LEG
Plans ACCEPTED BY PLAN TECH  10/29/2009 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  10/29/2009 DONE
DetailsTisha Gallop
Application received 10/6/200910/6/2009 DONE
DetailsAlexandra L. DeYoung
Intake Approval  10/6/2009 FAIL
A zoning certificate is required which has been applied for by Larson Architects who are adressing the exterior alterations to the building. 9-6-09 CDM
Telephone call  10/6/2009 DONE
Talked to Rick Lavelle at Reprise Designs and requested a complete certificate of value and contractors declaration to be E-Mailed to me so I could insert them into the plans. I also discused with Rick the requirement for a zoning certificate. He said that Cornell Larson was taking care of the Zoning certificate for the minor exterior alterations. Cornell is also submitting a separate BLD for the exterior work with the exception of the store front alterations. I discussed the Zoning certificate with Damon at Larson and they were going to try to include the store front alterations with the Zoning Certificate application that they have already turned in. 10-6-09 CDM