Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD09-01752
StatusFinaled
Name CSDI CONSTRUCTION INC
Site Address 1335 S MAPLE GROVE RD
Project NameBLACK EAGLE #1
Customer Number 
ePlanReviewNo
Description
(BROWN MACKIE COLLEGE - SOUTHEAST CORNER OF BUILDING) This building is fully fire sprinklered for area increase. To create a 7,144 square foot tenant space within an existing 44,703 square foot, one story building. This tenant space will be an educational occupancy for students above the 12th grade. It will be a teaching facility for educational programs including veterinary technician and criminal justice. It will include classrooms, criminal justice labs, pet treatment, pet surgical lab, and pet boarding. There will be an X-ray machine and an oxygen storage room. Work is to include interior nonbearing walls, a nonrated corridor, 2 restrooms accessible to the disabled, 1 unisex restroom accessible to the disabled, movable pet kennels, a folding partition, interior doors, interior windows, millwork, and finishes. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Follow up  4/2/2010 DONE
DetailsTisha Gallop
processed FV received and will mail statement for additional fees to CSDI since did not indicate who else to bill or their information on the paperwork that was received by fax on 3/30/10.
Third Notice 3/24/20103/29/2010 DONE
faxed, mailed and called
Telephone call  3/29/2010 DONE
DetailsTisha Gallop
left vm for Jeffrey Langan still need FV. If value went up I can bill owner/tenant if he provides me with the info. I said if no FV received w/in 2 weeks will put CSDI on hold for no further permits or inspections until receive FV.
Third Notice 3/9/20103/10/2010 DONE
faxed, mailed and called
Telephone call  3/10/2010 DONE
DetailsTisha Gallop
called and spoke with Jeffrey Langan/CSDI, he said will work on final values and suggests we change our process for FV. Told him working on improving but no changes approved yet.
Third Notice 2/23/20102/23/2010 DONE
faxed
Second Notice 2/5/20102/18/2010 DONE
First Notice 1/25/20101/26/2010 DONE
BLD-Final1/15/20101/15/20101/15/2010PPASS
DetailsMike Jordan
elec. signed off, need passed final on record. Elec. has signed off. Ok for perm occ.
Permanent Occupancy UNPAID FEE  1/15/2010 DONE
DetailsTisha Gallop
Temporary Occupancy UNPAID FEE  12/31/2009 DONE
DetailsTisha Gallop
BLD-Final12/29/200912/30/200912/30/2009PPART
DetailsMike Jordan
Mike Phone #: ###-####. Ok for temp occ. Will be ok for perm. occ once elec. signs perm.
FIRE-Final Inspection12/29/200912/30/200912/30/2009PPASS
DetailsTroy Cobbley
Life safety passed
FIRE-Final Inspection12/28/200912/29/200912/29/2009AFAIL
DetailsTroy Cobbley
Provide final for the project related fire alarm permit and provide panic hardware on the two classroom doors and the two exterior doors as discussed.
BLD-Other12/8/200912/9/200912/9/2009PPART
DetailsMike Jordan
Mike please call before going out Phone #: ###-####. Ceiling grid ok. pend elec. ri insp.
BLD-Framing/Rough-in12/3/200912/4/200912/4/2009APASS
DetailsMike Jordan
Mike Phone #: ###-####. 1hr. shafts for oxygen room supply and return air. ok.
BLD-Framing/Rough-in11/17/200911/18/200911/18/2009PPASS
DetailsMike Jordan
dry wall Phone #: ###-####. received ul design for 1hr. room from architect. 1hr. const. ok.
BLD-Framing/Rough-in11/16/200911/16/200911/16/2009PPASS
DetailsMike Jordan
mike Phone #: ###-####. Verified backing for ada elements in restrooms.
BLD-Framing/Rough-in11/12/200911/13/200911/13/2009APASS
DetailsMike Jordan
Mike Phone #: ###-#### Interior srel stud framed walls only. no grid. Need details for 1hr shaft enclosures and 1hr wall assembly for oxygen room. Still needs to install backing for ada elements.
BLD-Conference11/10/200911/12/200911/12/2009ADONE
DetailsMike Jordan
Mike Phone #: ###-####
Print Occupancy Form  11/4/2009 DONE
Permit Ready to Issue  11/4/2009 DONE
Telephone call  11/4/2009 DONE
DetailsBarbara Stitt
Called Jeffery at ###-#### and told him permit is ready & fees due///11-4-09 @ 11:00am BAS
Issue PAID IN FULL permit  11/4/2009 DONE
Routing - FIRE10/29/200910/29/200911/3/2009 PASS
DetailsScott Arellano
Attached IFC comments to plans.
Plan assigned to (CJW)10/9/2009 11/3/2009 PASS
DetailsCarl Westfall
11/3/2009 16:34:56 CJW - activity updated through activity BLDA022 from case BLD09-01752.
Routing - PUBLIC WORKS11/3/2009 11/3/2009 PASS
DetailsConnie Baumgartner
Looks like at least one more sink is being added.
Routing - PLUMBING11/3/2009 11/3/2009 PASS
DetailsBill VanDegrift
To review resubmittals. per resubmitted plans and 2003 upc
1st review completed  11/3/2009 FAIL
Failed Plumbing
Routing - PLAN CHECK11/3/2009 11/3/2009 PEND
DetailsConnie Baumgartner
Back to PW.
Routing - PLAN CHECK11/3/2009 11/3/2009 PEND
DetailsBill VanDegrift
Back to Plumbing for resubmittal review.
Routing - PLAN CHECK11/3/2009 11/3/2009 PASS
DetailsCarl Westfall
PLANS/APPL TAKEN TO FRONT DESK  11/3/2009 DONE
Route to Impact Fee Review10/29/200911/3/200910/30/2009 PASS
DetailsCindy M. Gould
Tenant improvement no impact fees
Routing - PLAN CHECK10/26/2009 10/29/2009 PASS
DetailsCarl Westfall
Revised drawings were submitted on October 26. The plan review was started on October 28. The drawings were approved with "red lines" on October 29, 2009.
Plan resubmittals received  10/26/2009  
DetailsCarl Westfall
Rec'd two copies of pages; A-0; ST-1; A-1; A-2; A-3; A-4; A-5; E-0.0; E-1.0; E-2.1; E-2.2; E-2.3; E-2.4; E-2.5; E-3.0; E-3.1; MG-1.0; MG-1.1; MG-1.2; MG-1.3; M-1.0; M-2.0; M-3.0; M-3.1; M-4.0; P-1.0; P-2.0; P-3.0; P-4.0- Taken to Carl W.
Routing - PLAN CHECK10/19/2009 10/26/2009 FAIL
DetailsCarl Westfall
The drawings had 3 major flaws that needed to be resolved before a plan review could be done. The drawings were on hold until revised drawings were submitted.
Plan resubmittals received  10/20/2009  
DetailsTisha Gallop
received two copies of sheets P-1.0, P-2.0, P-4.0; taken to Carl Westfall
Routing - PLUMBING10/14/2009 10/19/2009 FAIL
DetailsBill VanDegrift
provide cross connection protection for the lab / treatment / surgical area.
Routing - PLANNING10/14/2009 10/14/2009 PASS
DetailsSusan Riggs
Susan Riggs, CUP09-00063
Routing - Erosion and Sediment10/13/2009 10/14/2009 PASS
DetailsSteven Webb
ESC plan waiver approved with attached conditions. ESC09-00624
Routing - PUBLIC WORKS10/9/2009 10/13/2009 PASS
DetailsBeverly Hall
Routing PW Environmental10/12/2009 10/13/2009 PASS
DetailsWalt Baumgartner
Silver recovery for xray wastewater required.
Routing PW Sewer Rating10/12/2009 10/12/2009 PASS
DetailsConnie Baumgartner
Routing - Addressing10/9/2009 10/9/2009 PASS
DetailsApril Wing
Pending Assignment by JCB10/8/2009 10/9/2009 DONE
DetailsJason Blais
Plans ACCEPTED BY PLAN TECH  10/8/2009 DONE
Intake Approval  10/7/2009 PASS
Plans accepted for review.
Application received 10/7/2009