Permit Information
Permit NumberBLD09-01754
StatusFinaled
Name VAN AUKER CONSTRUCTION
Site Address 618 N ALLUMBAUGH ST
Project NameDarigold
Customer Number 
ePlanReviewNo
Description
Darigold - Production Plant Addition Shell- Darigold Addition - To construct a 20,635 sq. ft., concrete tilt-up, one story shell building addition on the east end of the existing building. To construct a 990 sq. ft., one story shell Receiving West and an 825 sq. ft. one story shell Receiving East additions at the existing Receiving Bay. This is a shell permit only and no occupancy is permitted under this permit. Separate permits will be required to finish this building for occupancy. This building is fully fire sprinkled. This building was reviewed as an unlimited area building. The footing and foundation for this shell building is be installed under building permit BLD09-01496. All construction per the approved plans. JCM (PLAN MODIFICATION - 01-12-10) Minor field modification to drive through opening at the west receiving area, work included removing 2' 8" of CMU to enlarge the opening to 14' 8" and install new lintel per attached engineering dated 12-04-09 this was field evalutated by Jim Storey, (RmH)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  8/27/2019 DONE
Third Notice 8/30/20108/17/2010 DONE
Third Notice 8/3/20108/16/2010 DONE
faxed
Second Notice 7/25/20107/29/2010 DONE
First Notice6/30/20106/30/20107/15/2010 DONE
DetailsJim Storey
BLD-Aging Inspection6/23/20106/23/20107/1/2010 PASS
DetailsJim Storey
BLD-Final6/30/20106/30/20106/30/2010APASS
DetailsJim Storey
l/c
DOC - Permit Finaled6/30/20106/30/20106/30/2010PPASS
DetailsJim Storey
Zoning Approval6/28/20106/28/20106/28/2010 DONE
DetailsAndrea Tuning
FIRE-Final Inspection4/19/20104/20/20104/26/2010PPASS
DetailsForrest France
Shell permit fire life safety passed.
BLD-Final4/21/20104/23/20104/23/2010APART
DetailsJim Storey
si report archived ok pending zoning final.
Zoning Approval Temp4/22/20104/22/20104/22/2010 DONE
DetailsAndrea Tuning
located on the east elevation, install and stripe the 12 parking spaces on the south side of the building, remove the pallettes fromt eh required parkign area and eliminate the rock mulch in the planter located along the south property line.
BLD-Conference4/19/20104/20/20104/21/2010ACANC
DetailsJim Storey
BLD-Concrete3/15/20103/15/20103/15/2010PPASS
DetailsJim Storey
slab on grade. north side truck pad/ exit door landing. ok rebar ok
BLD-Concrete3/2/20103/2/20103/2/2010PPASS
DetailsJim Storey
BLD-Footing2/10/20102/10/20102/10/2010PPASS
DetailsJim Storey
3:00 appt. for truck pand and retaining wall.
BLD-Wall cover1/28/20101/28/20101/28/2010APASS
DetailsJim Storey
BLD-Concrete1/14/20101/14/20101/14/2010PPASS
DetailsJim Storey
floor rebar insp. culture rm rebar ok on floor.
BLD-Other1/12/20101/13/20101/13/2010APASS
DetailsJim Storey
se 2nd lift ok
BLD-Other1/12/20101/12/20101/12/2010APASS
DetailsJim Storey
southeast corner 1 st lift rebar ok si onsite for grout sampling. top out of northeast door infil ok rebar ok si on site to test grout.
BLD-Other1/11/20101/11/20101/11/2010APART
DetailsJim Storey
3dr lift grout header of drygoods door cmu. rebar ok si on site for samplling. need base conection in cultural rn missed for welding detail/ still pending engineered panel conection in production area door to culture hallway.
BLD-Other1/8/20101/8/20101/8/2010APASS
DetailsJim Storey
2nd lift dry storage area door infil rebar ok si on site.
BLD-Other1/7/20101/7/20101/7/2010APASS
DetailsJim Storey
1 st lift of cmu at overhead doorway ne bay rebar ok to cover. walked tilt slab walls to review weld conections and shrink grouting in progress. si reports are continuing and in complance. duscused nw interior cut out pannel for door and window as to retro weld plate conections that were missed at precast plant.
BLD-Concrete12/2/200912/2/200912/2/2009APASS
DetailsJim Storey
north third of slab si on site/ rebar ok
BLD-Wall cover11/12/200911/12/200911/12/2009PPASS
DetailsJim Storey
grout pour for third lift north west area of building 12:30 appointment.
BLD-Conference11/9/200911/9/200911/9/2009PPASS
DetailsJim Storey
time tracking test
BLD-Wall cover11/9/200911/9/200911/9/2009PPASS
DetailsJim Storey
2nd lift of cmu north west area 3:30 appointment. 35 min
Inspection Record Card- Bld  11/3/2009 DONE
Telephone call  11/3/2009 DONE
Called Cornel Larson permit ready and fee given Also need ACHD
Permit Ready to Issue  11/3/2009 DONE
Issue PAID IN FULL permit  11/3/2009 DONE
Plan assigned to (JCM)10/8/200910/8/200911/2/2009 PASS
DetailsJohn Menard
11/2/2009 15:45:32 JCM - activity updated through activity BLDA022 from case BLD09-01754.
Routing - PLANNING11/2/2009 11/2/2009 PASS
DetailsAndrea Tuning
Drh09-00147 Andrea Tuning
Routing - PLAN CHECK10/30/2009 11/2/2009  
DetailsJohn Menard
Plan Reviewer's activity  11/2/2009 PASS
DetailsJohn Menard
Reviewed and approved final revised structural details, previously approved by consulting structural engineer through discusions with project engineer. JCM
Routing - PLAN CHECK11/2/2009 11/2/2009 PASS
DetailsJohn Menard
PLANS/APPL TAKEN TO FRONT DESK  11/2/2009 DONE
DetailsJohn Menard
Routing - FIRE10/23/200910/23/200910/30/2009 PASS
DetailsScott Arellano
Attached IFC comments to plans
1st review completed  10/30/2009 FAIL
Failed Structural
Plan resubmittals received  10/29/2009  
DetailsTisha Gallop
received three copies of review comment response #2 calculations and plan sheets PC2.2, PC3.1, PC3.2; inserted into plans by LEG and taken back to Fire Review.
Plan resubmittals requested  10/28/2009 DONE
DetailsJohn Menard
E-mailed the architect a copy of the second structural review requesting additional revisions. JCM
Routing Off Site - STRUCTURAL10/23/2009 10/28/2009 FAIL
DetailsJohn Menard
Received comment list from consulting structural engineer requesting additional revisions. JCM
Route to Impact Fee Review10/23/200910/28/200910/26/2009 PASS
DetailsCindy M. Gould
gave credit for removal of 4,00 sq ft storage building CMG
Routing - PLAN CHECK10/16/2009 10/23/2009 PASS
DetailsJohn Menard
John Menard
Plan resubmittals received  10/23/2009  
DetailsTisha Gallop
received three copies of response letter and calculations; one copy given to Ron Hill per his request and two copies taken to John Menard
Plan resubmittals requested  10/20/2009 DONE
DetailsJohn Menard
E-mailed the architect a copy of the structural review requesting revisions. JCM
Routing Off Site - STRUCTURAL10/8/2009 10/20/2009 FAIL
DetailsJohn Menard
Received comment list from consulting structural engineer requesting revisions. JCM
Routing - PUBLIC WORKS10/12/2009 10/14/2009 PASS
DetailsBeverly Hall
Routing - Erosion and Sediment  10/14/2009 PASS
DetailsSteven Webb
ESC09-00554; Approved with these conditions.
Routing PW Environmental  10/13/2009 PASS
DetailsWalt Baumgartner
Reviewed - WestBoise Sewer Dist. Facility subject to indirect discharge pretreatment permit
Routing PW Solid Waste  10/13/2009 PASS
DetailsPeter J. McCullough
Routing PW Drainage10/13/2009 10/13/2009 PASS
DetailsBrian Murphy
Routing PW Sewer Rating10/13/2009 10/13/2009 PASS
DetailsConnie Baumgartner
Routing - Addressing10/12/2009 10/12/2009 PASS
DetailsApril Wing
Routing - PLANNING Land Div10/8/2009 10/12/2009 PASS
DetailsTodd Tucker
Application received 10/8/200910/8/2009 DONE
DetailsTisha Gallop
Plans ACCEPTED BY PLAN TECH  10/8/2009 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  10/8/2009 DONE
DetailsTisha Gallop