Case Summary (BLD) | | | 8/27/2019 | | DONE |
|
|
|
|
Third Notice | | 8/30/2010 | 8/17/2010 | | DONE |
|
|
|
|
Third Notice | | 8/3/2010 | 8/16/2010 | | DONE |
|
|
|
faxed
|
Second Notice | | 7/25/2010 | 7/29/2010 | | DONE |
|
|
|
|
First Notice | 6/30/2010 | 6/30/2010 | 7/15/2010 | | DONE |
Jim Storey
|
|
|
|
BLD-Aging Inspection | 6/23/2010 | 6/23/2010 | 7/1/2010 | | PASS |
Jim Storey
|
|
|
|
BLD-Final | 6/30/2010 | 6/30/2010 | 6/30/2010 | A | PASS |
Jim Storey
|
|
|
l/c
|
DOC - Permit Finaled | 6/30/2010 | 6/30/2010 | 6/30/2010 | P | PASS |
Jim Storey
|
|
|
|
Zoning Approval | 6/28/2010 | 6/28/2010 | 6/28/2010 | | DONE |
Andrea Tuning
|
|
|
|
FIRE-Final Inspection | 4/19/2010 | 4/20/2010 | 4/26/2010 | P | PASS |
Forrest France
|
|
|
Shell permit fire life safety passed.
|
BLD-Final | 4/21/2010 | 4/23/2010 | 4/23/2010 | A | PART |
Jim Storey
|
|
|
si report archived ok pending zoning final.
|
Zoning Approval Temp | 4/22/2010 | 4/22/2010 | 4/22/2010 | | DONE |
Andrea Tuning
|
|
|
located on the east elevation, install and stripe the 12 parking spaces on the south side of the building, remove the pallettes fromt eh required parkign area and eliminate the rock mulch in the planter located along the south property line.
|
BLD-Conference | 4/19/2010 | 4/20/2010 | 4/21/2010 | A | CANC |
Jim Storey
|
|
|
|
BLD-Concrete | 3/15/2010 | 3/15/2010 | 3/15/2010 | P | PASS |
Jim Storey
|
|
|
slab on grade. north side truck pad/ exit door landing. ok rebar ok
|
BLD-Concrete | 3/2/2010 | 3/2/2010 | 3/2/2010 | P | PASS |
Jim Storey
|
|
|
|
BLD-Footing | 2/10/2010 | 2/10/2010 | 2/10/2010 | P | PASS |
Jim Storey
|
|
|
3:00 appt. for truck pand and retaining wall.
|
BLD-Wall cover | 1/28/2010 | 1/28/2010 | 1/28/2010 | A | PASS |
Jim Storey
|
|
|
|
BLD-Concrete | 1/14/2010 | 1/14/2010 | 1/14/2010 | P | PASS |
Jim Storey
|
|
|
floor rebar insp. culture rm rebar ok on floor.
|
BLD-Other | 1/12/2010 | 1/13/2010 | 1/13/2010 | A | PASS |
Jim Storey
|
|
|
se 2nd lift ok
|
BLD-Other | 1/12/2010 | 1/12/2010 | 1/12/2010 | A | PASS |
Jim Storey
|
|
|
southeast corner 1 st lift rebar ok si onsite for grout sampling. top out of northeast door infil ok rebar ok si on site to test grout.
|
BLD-Other | 1/11/2010 | 1/11/2010 | 1/11/2010 | A | PART |
Jim Storey
|
|
|
3dr lift grout header of drygoods door cmu. rebar ok si on site for samplling. need base conection in cultural rn missed for welding detail/ still pending engineered panel conection in production area door to culture hallway.
|
BLD-Other | 1/8/2010 | 1/8/2010 | 1/8/2010 | A | PASS |
Jim Storey
|
|
|
2nd lift dry storage area door infil rebar ok si on site.
|
BLD-Other | 1/7/2010 | 1/7/2010 | 1/7/2010 | A | PASS |
Jim Storey
|
|
|
1 st lift of cmu at overhead doorway ne bay rebar ok to cover. walked tilt slab walls to review weld conections and shrink grouting in progress. si reports are continuing and in complance. duscused nw interior cut out pannel for door and window as to retro weld plate conections that were missed at precast plant.
|
BLD-Concrete | 12/2/2009 | 12/2/2009 | 12/2/2009 | A | PASS |
Jim Storey
|
|
|
north third of slab si on site/ rebar ok
|
BLD-Wall cover | 11/12/2009 | 11/12/2009 | 11/12/2009 | P | PASS |
Jim Storey
|
|
|
grout pour for third lift north west area of building 12:30 appointment.
|
BLD-Conference | 11/9/2009 | 11/9/2009 | 11/9/2009 | P | PASS |
Jim Storey
|
|
|
time tracking test
|
BLD-Wall cover | 11/9/2009 | 11/9/2009 | 11/9/2009 | P | PASS |
Jim Storey
|
|
|
2nd lift of cmu north west area 3:30 appointment. 35 min
|
Inspection Record Card- Bld | | | 11/3/2009 | | DONE |
|
|
|
|
Telephone call | | | 11/3/2009 | | DONE |
|
|
|
Called Cornel Larson permit ready and fee given Also need ACHD
|
Permit Ready to Issue | | | 11/3/2009 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 11/3/2009 | | DONE |
|
|
|
|
Plan assigned to (JCM) | 10/8/2009 | 10/8/2009 | 11/2/2009 | | PASS |
John Menard
|
|
|
11/2/2009 15:45:32 JCM - activity updated through activity BLDA022 from case BLD09-01754.
|
Routing - PLANNING | 11/2/2009 | | 11/2/2009 | | PASS |
Andrea Tuning
|
|
|
Drh09-00147 Andrea Tuning
|
Routing - PLAN CHECK | 10/30/2009 | | 11/2/2009 | | |
John Menard
|
|
|
|
Plan Reviewer's activity | | | 11/2/2009 | | PASS |
John Menard
|
|
|
Reviewed and approved final revised structural details, previously approved by consulting structural engineer through discusions with project engineer. JCM
|
Routing - PLAN CHECK | 11/2/2009 | | 11/2/2009 | | PASS |
John Menard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/2/2009 | | DONE |
John Menard
|
|
|
|
Routing - FIRE | 10/23/2009 | 10/23/2009 | 10/30/2009 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
1st review completed | | | 10/30/2009 | | FAIL |
|
|
|
Failed Structural
|
Plan resubmittals received | | | 10/29/2009 | | |
Tisha Gallop
|
|
|
received three copies of review comment response #2 calculations and plan sheets PC2.2, PC3.1, PC3.2; inserted into plans by LEG and taken back to Fire Review.
|
Plan resubmittals requested | | | 10/28/2009 | | DONE |
John Menard
|
|
|
E-mailed the architect a copy of the second structural review requesting additional revisions. JCM
|
Routing Off Site - STRUCTURAL | 10/23/2009 | | 10/28/2009 | | FAIL |
John Menard
|
|
|
Received comment list from consulting structural engineer requesting additional revisions. JCM
|
Route to Impact Fee Review | 10/23/2009 | 10/28/2009 | 10/26/2009 | | PASS |
Cindy M. Gould
|
|
|
gave credit for removal of 4,00 sq ft storage building CMG
|
Routing - PLAN CHECK | 10/16/2009 | | 10/23/2009 | | PASS |
John Menard
|
|
|
John Menard
|
Plan resubmittals received | | | 10/23/2009 | | |
Tisha Gallop
|
|
|
received three copies of response letter and calculations; one copy given to Ron Hill per his request and two copies taken to John Menard
|
Plan resubmittals requested | | | 10/20/2009 | | DONE |
John Menard
|
|
|
E-mailed the architect a copy of the structural review requesting revisions. JCM
|
Routing Off Site - STRUCTURAL | 10/8/2009 | | 10/20/2009 | | FAIL |
John Menard
|
|
|
Received comment list from consulting structural engineer requesting revisions. JCM
|
Routing - PUBLIC WORKS | 10/12/2009 | | 10/14/2009 | | PASS |
Beverly Hall
|
|
|
|
Routing - Erosion and Sediment | | | 10/14/2009 | | PASS |
Steven Webb
|
|
|
ESC09-00554; Approved with these conditions.
|
Routing PW Environmental | | | 10/13/2009 | | PASS |
Walt Baumgartner
|
|
|
Reviewed - WestBoise Sewer Dist. Facility subject to indirect discharge pretreatment permit
|
Routing PW Solid Waste | | | 10/13/2009 | | PASS |
Peter J. McCullough
|
|
|
|
Routing PW Drainage | 10/13/2009 | | 10/13/2009 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Sewer Rating | 10/13/2009 | | 10/13/2009 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 10/12/2009 | | 10/12/2009 | | PASS |
April Wing
|
|
|
|
Routing - PLANNING Land Div | 10/8/2009 | | 10/12/2009 | | PASS |
Todd Tucker
|
|
|
|
Application received | | 10/8/2009 | 10/8/2009 | | DONE |
Tisha Gallop
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 10/8/2009 | | DONE |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/8/2009 | | DONE |
Tisha Gallop
|
|
|
|