Permit Information
Permit NumberBLD09-01788
StatusFinaled
Name THE CHRISTENSEN CORP
Site Address 950 W BANNOCK ST Unit: 250
Project NameBrown and Caldwell
Customer Number 
ePlanReviewNo
Description
(Brown and Caldwell) Permit for minor tenant improvements to an existing 4921 sq. ft. second floor tenant space in the Banner Bank Building with work to include the reconfiguration of the existing office spaces and break room areas. all work to be done per the approved plans. This is a fully sprinkled building; any alterations to the existing sprinkler system will require a separate permit and shall comply with NFPA13 as regulated by The Boise City Fire Department. For a complete building history see BLD06-01341. CDM
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  11/6/2015 DONE
Third Notice 3/9/20103/11/2010 DONE
Third Notice 2/9/20102/23/2010 DONE
faxed, and called
Telephone call  2/23/2010 DONE
DetailsTisha Gallop
called and spoke to Marva, she said FV are next on her task list.
Third Notice 1/25/20101/28/2010 DONE
faxed
Second Notice 1/8/20101/20/2010 DONE
First Notice 12/27/200912/29/2009 DONE
BLD-Final12/16/200912/17/200912/17/2009APASS
DetailsDave Hannah
Marva Phone #: ###-####
Permanent Occupancy UNPAID FEE  12/17/2009 DONE
DetailsTisha Gallop
FIRE-Final Inspection12/16/200912/16/200912/16/2009PPASS
DetailsForrest France
Correction items are complete, fire life safety finaled.
FIRE-Final Inspection12/14/200912/14/200912/14/2009PFAIL
DetailsForrest France
Missing EM lighting throughout, post fire extinguisher as discussed, repair door closure at the main entry/exit.
BLD-Framing/Rough-in11/12/200911/12/200911/12/2009PPASS
DetailsTom Arcoraci
Dennis Phone #: ###-####
BLD-Framing/Rough-in11/5/200911/5/200911/6/2009PPART
DetailsDave Hannah
Dennis Phone #: ###-#### ok to cover first half
Print Occupancy Form  10/20/2009 DONE
Details
Telephone call  10/20/2009 DONE
Details
t/c w marva at ###-#### - permit ready and fees given
Permit Ready to Issue  10/20/2009 DONE
Details
Issue PAID IN FULL permit  10/20/2009 DONE
Plan assigned to (CDM)10/12/200910/12/200910/19/2009 PASS
DetailsCarl D Madsen
10/19/2009 11:27:16 CDM - activity updated through activity BLDA022 from case BLD09-01788.
Case Summary (BLD)  10/19/2009 DONE
Routing - PLAN CHECK10/19/2009 10/19/2009 PASS
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  10/19/2009  
Routing - FIRE  10/16/2009 PASS
Verify in field CDM
1st review completed  10/16/2009 FAIL
Application and plans do not
Routing PW Sewer Rating10/13/2009 10/13/2009 PASS
DetailsConnie Baumgartner
Routing - PUBLIC WORKS10/12/2009 10/13/2009 PASS
DetailsBeverly Hall
Plans ACCEPTED BY PLAN TECH  10/12/2009 DONE
ok per Carl M for level 1 intake
Routing - Addressing10/12/2009 10/12/2009 PASS
DetailsApril Wing
Application received 10/12/2009   
Routing - PLAN CHECK10/13/2009   FAIL
DetailsCarl D Madsen
The plans and the application need to match for the correct square footage, occupant load and lighting complaince. CDM