Third Notice | | 9/28/2010 | 10/8/2010 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 10/8/2010 | | DONE |
Tisha Gallop
|
|
|
|
Second Notice | | 9/19/2010 | 9/23/2010 | | DONE |
|
|
|
|
First Notice | 9/3/2010 | 9/3/2010 | 9/9/2010 | | DONE |
Dave Hannah
|
|
|
|
BLD-Final | 9/2/2010 | 9/2/2010 | 9/3/2010 | P | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 9/3/2010 | 9/3/2010 | 9/3/2010 | A | PASS |
Dave Hannah
|
|
|
|
BLD-Conference | 8/31/2010 | 9/1/2010 | 9/2/2010 | A | PASS |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 8/26/2010 | 8/26/2010 | 8/31/2010 | | DONE |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 2/2/2010 | 2/2/2010 | 2/2/2010 | | PASS |
Dave Hannah
|
|
|
work in progress
|
(F) Reprint permit | | | 11/10/2009 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 11/3/2009 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/2/2009 | | DONE |
|
|
|
|
Telephone call | | | 11/2/2009 | | DONE |
|
|
|
t/c w eric at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 11/2/2009 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 10/30/2009 | | 10/30/2009 | | PASS |
Steven Webb
|
|
|
ESC controls under master plan ESC09-00352 and attached conditions. Bret Hart of the Wetlands Group is the erosion control Responsible Person.
|
Routing - PLAN CHECK | 10/30/2009 | | 10/30/2009 | | PASS |
John Menard
|
|
|
John M.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/30/2009 | | DONE |
John Menard
|
|
|
|
Inspection Record Card- Bld | | | 10/30/2009 | | DONE |
|
|
|
|
Plan assigned to (JCM) | 10/19/2009 | | 10/30/2009 | | PASS |
John Menard
|
|
|
10/30/2009 11:13:20 JCM - activity updated through activity BLDA022 from case BLD09-01831.
|
Routing - PLAN CHECK | 10/23/2009 | | 10/30/2009 | | PASS |
John Menard
|
|
|
|
Plan resubmittals received | | | 10/29/2009 | | |
Tisha Gallop
|
|
|
received two copies of sheet L1.00; inserted into plans by LEG and taken back to John Menard
|
Plan resubmittals requested | | | 10/23/2009 | | DONE |
|
|
|
E-mailed the applicant requesting revised site plan identifying the location of the proposed irrigation boxes. JCM
|
Routing - PUBLIC WORKS | 10/19/2009 | | 10/22/2009 | | PASS |
Beverly Hall
|
|
|
|
Routing - Erosion and Sediment | 10/22/2009 | | 10/22/2009 | | FAIL |
Steven Webb
|
|
|
Erosion permit, ESC09-00352 covers land disturbances not structures either demo or new builds. Informed applicant (Kelly-Boise Parks) that we need the contractor to apply for a ESC permit with a plan, plan waiver and application. Need valid RP overseeing this activity.
|
Routing - PLANNING | 10/22/2009 | | 10/22/2009 | | PASS |
Joshua Johnson
|
|
|
Routed the documents to Josh Johnson for review. SMS
|
Routing PW Flood Plain | 10/20/2009 | | 10/21/2009 | | PASS |
Jim Wyllie
|
|
|
|
Routing PW Drainage | 10/20/2009 | | 10/21/2009 | | PASS |
Brian Murphy
|
|
|
|
Routing - PLANNING Land Div | 10/19/2009 | | 10/19/2009 | | PASS |
Dave Abo
|
|
|
Site is over 5 acres in size. 66+ acres.
|
Pending Assignment by JCM | 10/19/2009 | | 10/19/2009 | | BLDA |
John Menard
|
|
|
10/19/2009 11:33:23 JCM - activity updated through activity BLDA166 from case BLD09-01831.
|
Application received | | 10/16/2009 | | | |
|
|
|
|