Permit Information
Permit NumberBLD09-01831
StatusFinaled
Name BROWN CONSTRUCTION INC
Site Address 3301 E WARM SPRINGS AVE
Project NameMarianne Williams Park
Customer Number 
ePlanReviewNo
Description
Marianne Williams Park - Irrigation Intake and Diversion Structures - To install an irrigation control and Walling Creek diversion structure and a Boise River Intake Structure. These structures will be constructed of engineered reinforced concrete retaining walls. Special Inspections per attached Projrct Start Up For Special Inspections Form. All construction per the approved plans. JCM/// Master plan ESC09-00352
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 9/28/201010/8/2010 DONE
Case Summary (BLD)  10/8/2010 DONE
DetailsTisha Gallop
Second Notice 9/19/20109/23/2010 DONE
First Notice9/3/20109/3/20109/9/2010 DONE
DetailsDave Hannah
BLD-Final9/2/20109/2/20109/3/2010PPASS
DetailsDave Hannah
DOC - Permit Finaled9/3/20109/3/20109/3/2010APASS
DetailsDave Hannah
BLD-Conference8/31/20109/1/20109/2/2010APASS
DetailsDave Hannah
BLD-Aging Inspection8/26/20108/26/20108/31/2010 DONE
DetailsDave Hannah
BLD-Aging Inspection2/2/20102/2/20102/2/2010 PASS
DetailsDave Hannah
work in progress
(F) Reprint permit  11/10/2009 DONE
Issue PAID IN FULL permit  11/3/2009 DONE
Inspection Record Card- Bld  11/2/2009 DONE
Details
Telephone call  11/2/2009 DONE
Details
t/c w eric at ###-#### - permit ready and fees given
Permit Ready to Issue  11/2/2009 DONE
Details
Routing - Erosion and Sediment10/30/2009 10/30/2009 PASS
DetailsSteven Webb
ESC controls under master plan ESC09-00352 and attached conditions. Bret Hart of the Wetlands Group is the erosion control Responsible Person.
Routing - PLAN CHECK10/30/2009 10/30/2009 PASS
DetailsJohn Menard
John M.
PLANS/APPL TAKEN TO FRONT DESK  10/30/2009 DONE
DetailsJohn Menard
Inspection Record Card- Bld  10/30/2009 DONE
Plan assigned to (JCM)10/19/2009 10/30/2009 PASS
DetailsJohn Menard
10/30/2009 11:13:20 JCM - activity updated through activity BLDA022 from case BLD09-01831.
Routing - PLAN CHECK10/23/2009 10/30/2009 PASS
DetailsJohn Menard
Plan resubmittals received  10/29/2009  
DetailsTisha Gallop
received two copies of sheet L1.00; inserted into plans by LEG and taken back to John Menard
Plan resubmittals requested  10/23/2009 DONE
Details
E-mailed the applicant requesting revised site plan identifying the location of the proposed irrigation boxes. JCM
Routing - PUBLIC WORKS10/19/2009 10/22/2009 PASS
DetailsBeverly Hall
Routing - Erosion and Sediment10/22/2009 10/22/2009 FAIL
DetailsSteven Webb
Erosion permit, ESC09-00352 covers land disturbances not structures either demo or new builds. Informed applicant (Kelly-Boise Parks) that we need the contractor to apply for a ESC permit with a plan, plan waiver and application. Need valid RP overseeing this activity.
Routing - PLANNING10/22/2009 10/22/2009 PASS
DetailsJoshua Johnson
Routed the documents to Josh Johnson for review. SMS
Routing PW Flood Plain10/20/2009 10/21/2009 PASS
DetailsJim Wyllie
Routing PW Drainage10/20/2009 10/21/2009 PASS
DetailsBrian Murphy
Routing - PLANNING Land Div10/19/2009 10/19/2009 PASS
DetailsDave Abo
Site is over 5 acres in size. 66+ acres.
Pending Assignment by JCM10/19/2009 10/19/2009 BLDA
DetailsJohn Menard
10/19/2009 11:33:23 JCM - activity updated through activity BLDA166 from case BLD09-01831.
Application received 10/16/2009