Plan Reviewer's activity | | | 6/21/2010 | | DONE |
|
|
|
Took office copy to Records.
|
Third Notice | | 4/26/2010 | 5/4/2010 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 4/23/2010 | | DONE |
Sam Zahorka
|
|
|
|
Second Notice | | 4/5/2010 | 4/16/2010 | | DONE |
|
|
|
|
First Notice | | 2/28/2010 | 3/26/2010 | | DONE |
|
|
|
|
Permanent Occupancy | | | 2/18/2010 | | |
|
|
|
|
BLD-Final | 2/4/2010 | 2/5/2010 | 2/5/2010 | A | PASS |
Dave Hannah
|
|
|
Bill Phone #: ###-#### ok for perm occ
|
BLD-Final | 1/15/2010 | 1/19/2010 | 1/19/2010 | A | PART |
Dave Hannah
|
|
|
bill Phone #: ###-#### ok for temp occ ok for perm occ after elec gos perm
|
FIRE-Final Inspection | 1/15/2010 | 1/19/2010 | 1/19/2010 | A | PASS |
Troy Cobbley
|
|
|
Fire life safety passed
|
Temporary Occupancy UNPAID FEE | | | 1/19/2010 | | DONE |
|
|
|
|
FIRE-Conference | 1/14/2010 | 1/14/2010 | 1/14/2010 | A | DONE |
Forrest France
|
|
|
Regarding project related fire alarm permit work.
|
FIRE-Final Inspection | 1/13/2010 | 1/13/2010 | 1/13/2010 | P | FAIL |
Forrest France
|
|
|
See items on fire code review notes # 2, 8, 19 and 32 including missing address numbers, one EM light to be repaired, the new duct smoke detector at the HVAC unit needs to be tied in to the building fire alarm panel.
|
Print Occupancy Form | | | 1/11/2010 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 1/8/2010 | | DONE |
|
|
|
Talked to Matt in Planning. Changes to the exterior are being processed by him independent of this permit.
|
FIRE-Conference | 1/6/2010 | 1/6/2010 | 1/6/2010 | P | DONE |
Forrest France
|
|
|
On site conference with contractor regarding exit sign and EM light locations, fire extinguisher placement, and project related fire sprinkler work.
|
BLD-Framing/Rough-in | 12/9/2009 | 12/9/2009 | 12/10/2009 | A | PASS |
Dave Hannah
|
|
|
Bill Phone #: ###-####
|
BLD-Framing/Rough-in | 12/4/2009 | 12/8/2009 | 12/9/2009 | A | NR |
Dave Hannah
|
|
|
Bill Phone #: ###-####
|
Permit Ready to Issue | | | 11/13/2009 | | DONE |
|
|
|
|
Telephone call | | | 11/13/2009 | | DONE |
|
|
|
called Matt Rheese permit readt and fee given Also need GC
|
Issue PAID IN FULL permit | | | 11/13/2009 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 11/9/2009 | | 11/12/2009 | | PASS |
Carl Westfall
|
|
|
Drawings approved with "red lines" after resubmittal review.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/12/2009 | | DONE |
|
|
|
|
Print Occupancy Form | | | 11/12/2009 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 10/19/2009 | | 11/12/2009 | | PASS |
Carl Westfall
|
|
|
11/12/2009 09:31:39 CJW - activity updated through activity BLDA022 from case BLD09-01838.
|
Routing - PLANNING | 11/6/2009 | | 11/9/2009 | | |
|
|
|
According to Matt, the new doors shown on the drawings are a mistake. The existing doors will be maintained. No changes proposed to the exterior of the building under this permit.
|
Plan resubmittals received | | | 11/6/2009 | | |
Carl Westfall
|
|
|
Rec'd transmittal letter; lighting compliance; response letter; and two copies of sheets- T-1; T-2; D-1; A-1; A-2; A-3; A-4; A-5; A-6; A-7; A-8; P-1; P-2; M-1; E-1; E-2; COM-1; MEP-1; Taken to Carl W
|
Routing - PLAN CHECK | 11/3/2009 | | 11/6/2009 | | |
|
|
|
Sent to planning
|
Routing - FIRE | 10/27/2009 | 10/27/2009 | 11/3/2009 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
1st review completed | | | 11/3/2009 | | FAIL |
|
|
|
Failed Plan Check
|
Plan resubmittals received | | | 10/28/2009 | | |
Tisha Gallop
|
|
|
received revised cert of value to split out interior demo into seperate permit Bld09-01913; new project value for this TI is $105,000; all other values the same//10/27/09 LEG
|
Route to Impact Fee Review | 10/27/2009 | 10/30/2009 | 10/27/2009 | | PASS |
Cindy M. Gould
|
|
|
Tenant improvement no impact fees
|
Routing - PLAN CHECK | 10/21/2009 | | 10/27/2009 | | FAIL |
Carl Westfall
|
|
|
The IBC plan review was started on October 22, 2009 and was finished on October 27, 2009. Revised drawings were required. See the plan review report. The drawings were in Plan Review a total of 5 work days.
|
Routing - PLUMBING | 10/21/2009 | | 10/21/2009 | | PASS |
Bill VanDegrift
|
|
|
R.P. required upstream of the filter on the ice mechine, mount over the mop sink. R.P. required upstream of the soda mechine, mount over the mop sink. verify cross connection control on the heat pump in the basement. pipe 3/4" cold water between the lavs and the toilets. maximum fixture unit loading on an 1 1/4" vent is 1, two lavs trquire an 1 1/2" vent. Idaho state code requires the three compartment sink to be indirectly wasted, pipe to FD-4.
|
Routing - PUBLIC WORKS | 10/19/2009 | | 10/21/2009 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Environmental | 10/21/2009 | | 10/21/2009 | | PASS |
Walt Baumgartner
|
|
|
grease trap provided for triple sink, OK
|
Routing - Addressing | 10/20/2009 | | 10/20/2009 | | PASS |
April Wing
|
|
|
|
Pending Assignment by JCB | 10/19/2009 | | 10/19/2009 | | DONE |
Jason Blais
|
|
|
|
Application received | | 10/16/2009 | 10/16/2009 | | DONE |
Darla L Downs
|
|
|
|
Intake Approval | | | 10/16/2009 | | PASS |
|
|
|
OK to submit permit application.
|