BLD-Final | 5/18/2010 | 5/20/2010 | 5/25/2010 | P | PASS |
Tony Young
|
|
|
jonathan Phone #: ###-####
|
DOC - Permit Finaled | 5/25/2010 | 5/25/2010 | 5/25/2010 | P | PASS |
Tony Young
|
|
|
c of o issues
|
BLD-Final | 5/17/2010 | 5/18/2010 | 5/18/2010 | P | NR |
Tony Young
|
|
|
jonathan Phone #: ###-####,, need trades
|
BLD-Final | 5/14/2010 | 5/17/2010 | 5/17/2010 | A | PART |
Tony Young
|
|
|
jonathan Phone #: ###-####,, conf only,, need trades 1st
|
BLD-Conference | 3/1/2010 | 3/2/2010 | 3/4/2010 | A | PEND |
Tony Young
|
|
|
Johnathon Phone #: ###-####, meet energy consultant for blower test,, 9:30am,,
|
BLD-Conference | 2/26/2010 | 3/1/2010 | 3/1/2010 | A | NR |
Tony Young
|
|
|
Johnathon Phone #: ###-####, meet energy consultant for blower test,, 9:30am
|
BLD-Energy code compliance | 2/25/2010 | 2/25/2010 | 3/1/2010 | P | PASS |
Tony Young
|
|
|
Johnathon Phone #: ###-####
|
BLD-Conference | 2/25/2010 | 2/25/2010 | 2/26/2010 | P | PASS |
Tony Young
|
|
|
Johnathon Phone #: ###-####,, other ?s
|
BLD-Conference | 2/25/2010 | 2/25/2010 | 2/26/2010 | A | PASS |
Tony Young
|
|
|
Johnathon Phone #: ###-####,, Feb 25, 2010 met with contractor Jonathon and energy consultant John Coldiron to look at job, video some,,, invited others from our department but too short of notice for them,, this is the 1st with in our State of this type of house,, net zero and also a St. Judes raffle house.. also on site was the insulation person
|
BLD-Energy code compliance | 2/24/2010 | 2/24/2010 | 2/25/2010 | P | NR |
Tony Young
|
|
|
Johnathon Phone #: ###-####
|
BLD-Energy code compliance | 2/23/2010 | 2/24/2010 | 2/24/2010 | A | NR |
Tony Young
|
|
|
Johnathon Phone #: ###-####
|
BLD-Energy code compliance | 2/23/2010 | 2/23/2010 | 2/23/2010 | P | NR |
Tony Young
|
|
|
Johnathon Phone #: ###-####
|
BLD-Framing/Rough-in | 2/11/2010 | 2/12/2010 | 2/12/2010 | A | PASS |
Tony Young
|
|
|
Johnathan Phone #: ###-####
|
BLD-Conference | 2/2/2010 | 2/3/2010 | 2/3/2010 | A | DONE |
Tony Young
|
|
|
jonathan Phone #: ###-#### Met on site with Tony Young and framing contractor to inspect prior to the placement of exterior blown in insulation. pep 2-2-2010
|
BLD-Footing | 1/12/2010 | 1/13/2010 | 1/13/2010 | A | PASS |
Mike Jordan
|
|
|
Jonathan Phone #: ###-####. Interior slab on grade and interior footings (thickend slab areas ok.) All rigid foam insulation in place.
|
BLD-Other | 11/30/2009 | 11/30/2009 | 11/30/2009 | P | PART |
Jim Storey
|
|
|
Sabastian Phone #: ###-####- stem wall
|
BLD-Footing | 11/25/2009 | 11/25/2009 | 11/25/2009 | P | PEND |
Tony Young
|
|
|
SABASTIAN Phone #: ###-####
|
BLD-Conference | 11/25/2009 | 11/25/2009 | 11/25/2009 | P | PASS |
Tony Young
|
|
|
SABASTIAN Phone #: ###-#### SOIL ENGINEER REINSPECTED AND PASSED SOIL AFTER NOON
|
BLD-Footing | 11/23/2009 | 11/24/2009 | 11/24/2009 | A | NR |
Tony Young
|
|
|
Sabatian Phone #: ###-####
|
BLD-Conference | 11/23/2009 | 11/24/2009 | 11/24/2009 | A | NR |
Tony Young
|
|
|
Jonathan Phone #: ###-#### check on soil report
|
BLD-Footing | 11/23/2009 | 11/23/2009 | 11/23/2009 | P | NR |
Tony Young
|
|
|
Jonathan Phone #: ###-#### on site conf,, need soil compaction test
|
Issue PAID IN FULL permit | | | 11/23/2009 | | DONE |
|
|
|
|
Plan assigned to (PEP) | 10/28/2009 | 10/28/2009 | 11/20/2009 | | PASS |
Perry Paine
|
|
|
11/20/2009 13:01:35 PEP - activity updated through activity BLDA022 from case BLD09-01863.
|
Routing - PLAN CHECK | 10/22/2009 | | 11/20/2009 | | PASS |
Perry Paine
|
|
|
|
Case Summary (BLD) | | | 11/20/2009 | | |
|
|
|
|
1st review completed | | | 11/20/2009 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/20/2009 | | DONE |
|
|
|
|
Meeting | | | 11/20/2009 | | DONE |
|
|
|
Met with Flynner Homes. Determined because this is a zero energy house and one where all materials and work is donated, PDS would donate the building permit related fees for the project.
|
Inspection Record Card- Bld | | | 11/20/2009 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/20/2009 | | DONE |
|
|
|
|
Telephone call | | | 11/20/2009 | | DONE |
|
|
|
alex e-mailed flynner homes that the permit was ready and gave the fees
|
Routing Walk-In (BLD) | 11/17/2009 | 11/17/2009 | 11/17/2009 | P | PASS |
Perry Paine
|
|
|
resubmittals received
|
1st review completed | | | 11/17/2009 | | FAIL |
|
|
|
need more information
|
Plan resubmittals received | | | 11/17/2009 | | DONE |
|
|
|
plans showing heating system
|
Route to Impact Fee Review | 10/20/2009 | 10/23/2009 | 10/30/2009 | | PASS |
Cindy M. Gould
|
|
|
|
Plan assigned to (CDM) | 10/20/2009 | 10/20/2009 | 10/28/2009 | | DEFR |
Carl D Madsen
|
|
|
|
Routing - PUBLIC WORKS | 10/21/2009 | | 10/22/2009 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - PLANNING Land Div | 10/20/2009 | | 10/21/2009 | | PASS |
Todd Tucker
|
|
|
parcel is a legal lot in a subdivision.
|
Routing - PLANNING | 10/20/2009 | | 10/21/2009 | | PASS |
Todd Tucker
|
|
|
The detached garage is allowed in front of the main structure by the Planning Director as allowed for in Section 11-04-04.01.A of the Zoning Ordinance. He allowed it because the lot is a flag lot located approximately 150 feet from the street behind two other lots.
|
Application received | | 10/20/2009 | 10/20/2009 | | DONE |
Tisha Gallop
|
|
|
|
Routing - Addressing | 10/20/2009 | | 10/20/2009 | | PASS |
April Wing
|
|
|
|