Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD09-01866
StatusCOL
Name CHIPPIE CONSTRUCTION
Site Address 8135 W FAIRVIEW AVE
Project NameTHE LION'S DEN
Customer Number 
ePlanReviewNo
Description
(THE LION'S DEN - CENTER OF BUILDING) This building is NOT fire sprinklered. To construct a 1,328 square foot beauty salon within an existing 5,850 square foot, one story building. There will be 8 hair stations, 1 pedicure spas with 3 stations, a massage room, and a break room. Work is to include interior nonbearing walls, 2 restrooms accessible to the disabled, gypsum board ceilings, millwork, and finishes. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
CHANGE STATUS TO (COL)  10/1/2010 DONE
DetailsRita DeYoung
Second Notice 3/5/20103/10/2010 DONE
First Notice 2/22/20102/23/2010 DONE
BLD-Final2/12/20102/12/20102/12/2010PPASS
DetailsMike Jordan
Steve Phone #: ###-####. Ok for perm occ.
FIRE-Final Inspection2/11/20102/12/20102/12/2010APASS
DetailsTroy Cobbley
Life safety passed
Permanent Occupancy UNPAID FEE  2/12/2010 DONE
BLD-Final2/11/20102/11/20102/11/2010PCANC
DetailsMike Jordan
Steve Phone #: ###-####. Cancelled by contractor via phone call. Life/safety failed.
BLD-Final2/9/20102/11/20102/11/2010PCANC
DetailsMike Jordan
Nicki Phone #: ###-#### Inspection cancelled from web by: Barbara Stitt
FIRE-Final Inspection2/9/20102/11/20102/11/2010AFAIL
DetailsTroy Cobbley
Provide an annual inspection for both of the fire extinguishers, provide the correct sticker at the main exit as discussed, post address numbers atleast 4" in height and provide passage hardware on the breakroom door since an exit sign is designating this door as an exit path.
BLD-Framing/Rough-in12/31/200912/31/200912/31/2009PPASS
DetailsDave Hannah
Steve Adams Phone #: ###-#### ok to cover
BLD-Framing/Rough-in12/28/200912/29/200912/29/2009PNR
DetailsMike Jordan
steve Phone #: ###-####. Needs elec ri first inspection first. Notified Steve at provided number.
Issue PAID IN FULL permit  11/30/2009 DONE
Print Occupancy Form  11/23/2009 DONE
Permit Ready to Issue  11/23/2009 DONE
Telephone call  11/23/2009 DONE
called left message permit ready and fee given Also need RP
Routing - PLAN CHECK11/9/2009 11/20/2009 PASS
DetailsCarl Westfall
The drawings were approved after the resubmittal review. Routed back to PW for fixture assessment.
Routing - PUBLIC WORKS11/20/2009 11/20/2009 PASS
DetailsConnie Baumgartner
More plumbing fixtures added.
Routing PW Sewer Rating11/20/2009 11/20/2009 PASS
DetailsConnie Baumgartner
Routing - PLAN CHECK11/20/2009 11/20/2009 DONE
DetailsCarl Westfall
PLANS/APPL TAKEN TO FRONT DESK  11/20/2009 DONE
Plan assigned to (CJW)10/22/2009 11/20/2009 PASS
DetailsCarl Westfall
11/20/2009 15:25:44 CJW - activity updated through activity BLDA022 from case BLD09-01866.
Plan resubmittals received  11/17/2009  
DetailsCarl Westfall
Received 2 copies of sheets G1, G2,A1, E1, E1.0, E2.0, E3.0, M2.11, M3.00, P2.11, P3.00 and taken to Carl Westfall///11-17-09 BAS
Routing - FIRE11/4/200911/4/200911/9/2009 PASS
DetailsScott Arellano
Attached IFC comments to plans
1st review completed  11/9/2009 FAIL
Failed Plan Check
Route to Impact Fee Review11/4/200911/9/200911/4/2009 PASS
DetailsCindy M. Gould
Tenant improvement no impact fees
Routing - MECHANICAL11/3/2009 11/4/2009 PASS
DetailsTroy James
Nail salon
NO NAIL STATIONS SHOWN ON PLANS
Routing - PLAN CHECK11/4/2009 11/4/2009  
DetailsCarl Westfall
Routed to Fire.
Routing - PLAN CHECK10/29/2009 11/3/2009 FAIL
DetailsCarl Westfall
The IBC plan review was started on October 30, 2009 and was finished on November 3, 2009. Revised drawings were required. See the plan review report. Drawings in plan check 4 days.
Routing - PLUMBING10/28/2009 10/29/2009 PASS
DetailsBill VanDegrift
mount r.p.'s over the mop sink per plans and 2003 upc
Routing - Erosion and Sediment10/27/2009 10/28/2009 PASS
DetailsSteven Webb
ESC plan waiver approved according to the attached conditions. ESC09-00668
Routing - PUBLIC WORKS10/23/2009 10/27/2009 PASS
DetailsBeverly Hall
Routing PW Sewer Rating10/26/2009 10/26/2009 PASS
DetailsConnie Baumgartner
Plan resubmittals received  10/23/2009 DONE
DetailsJason Blais
Received signed page 4 of the application as requested.
Routing - Addressing10/23/2009 10/23/2009 PASS
DetailsApril Wing
Pending Assignment by JCB10/21/2009 10/22/2009 DONE
DetailsJason Blais
Plan Reviewer's activity  10/22/2009 DONE
DetailsJason Blais
Called contractor about missing signature on building permit application. E-mailed him the application and he will sign and e-mail back.
Plans ACCEPTED BY PLAN TECH  10/21/2009 DONE
ok per John M for level 3 intake
Application received 10/20/2009