Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD09-01867
StatusFinaled
Name BRIGHTON PROPERTIES LLC
Site Address 2796 S VICTORY VIEW WAY
Project NameVic Park Bldg 3
Customer Number 
ePlanReviewNo
Description
Vic Park Bldg 3: (Vanilla finish) Permit for minor tenant improvements to create a 6,012 sq. ft. tenant space in a 32,942 sq. ft. shell building with work to include the infill of on overhead door and man door, removal of two knock out panels (one for a overhead door and one for a man door), the construction of a 8" fuly grouted reinforced CMU tenant demizing wall to the roof deck and the construction of a truck ramp. This is a fully sprinklered building; any alterations to the sprinkler system will require a separate permit and shall comply with NFPA13 as regulated by Boise City Fire Department. All work to be done per the approved plans, plan review report, CZC09-00181 and any notations. The shell building was constructed under BLD07-00737. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 6/10/20106/1/2010 DONE
Third Notice 4/30/20105/27/2010 DONE
faxed
Case Summary (BLD)  4/29/2010 DONE
DetailsTisha Gallop
Third Notice 3/30/20104/15/2010 DONE
faxed
Second Notice 3/20/20103/25/2010 DONE
First Notice2/23/20102/23/20103/10/2010 DONE
DetailsMike Jordan
BLD-Final2/23/20102/23/20102/23/2010PPASS
DetailsMike Jordan
Please call 1/2 hour upon arrival, thanks. Inspection requested from web by: Darren Gossett Phone #: ###-####
DOC - Permit Finaled2/23/20102/23/20102/23/2010PPASS
DetailsMike Jordan
Letter of compliance was issued.
BLD-Foundation12/3/200912/4/200912/4/2009APART
DetailsMike Jordan
Pouring dock ramp stem wall at 9:00 am. Phone #: ###-#### Internet Inspection Request from: Darren Gossett. wip on loading dock walls. Special insp. was o site.
BLD-Footing11/24/200911/25/200911/25/2009APASS
DetailsMike Jordan
Pouring footings at 10:30 am. Phone #: ###-#### Internet Inspection Request from: Darren Gossett. Footing for dock walls ok. Special insp. on site.
BLD-Foundation11/20/200911/23/200911/23/2009ADEFR
DetailsMike Jordan
Grout pour at 8:15am. Phone #: ###-#### Internet Inspection Request from: Darren Gossett. Special inspector on site.
BLD-Foundation11/19/200911/20/200911/20/2009APART
DetailsMike Jordan
Grout pour at 8:15 am. Phone #: ###-#### Internet Inspection Request from: Darren Gossett. wip. special insp. on site.
BLD-Foundation11/18/200911/19/200911/19/2009PCANC
DetailsMike Jordan
Grout pour at 2:00 pm please call 1/2 hour prior, thanks. Phone #: ###-#### Internet Inspection Request from: Darren Gossett
BLD-Foundation11/18/200911/19/200911/19/2009APART
DetailsMike Jordan
Grout pour at 10:30 am please call 1/2 hour prior, thanks. Phone #: ###-#### Internet Inspection Request from: Darren Gosse. wip on masinry wall from 14ft. to 18ft. elev. Special inspector on site.
BLD-Foundation11/17/200911/18/200911/18/2009APART
DetailsMike Jordan
Please call 1/2 hour upon arrival, thanks. Phone #: ###-#### Internet Inspection Request from: Darren Gossett. wip on masonry wall from 8 to 12 ft. elevation. Special inspector on site.
BLD-Foundation11/17/200911/17/200911/17/2009PPART
DetailsMike Jordan
Please call 1/2 hour upon arrival, thanks. Phone #: ###-#### Internet Inspection Request from: Darren Gossett. CMu wall, 0 to 4ft. elev. Will need rfi from engineer of record for deletion of joint reinforcement in first 0 to 4ft. elev. of wall.
Case Summary (BLD)  11/17/2009  
BLD-Footing11/13/200911/16/200911/16/2009ADEFR
DetailsMike Jordan
Please call 1/2 hour upon arrival thanks. Phone #: ###-#### Internet Inspection Request from: Darren Gossett. Special insp.
Issue PAID IN FULL permit  11/3/2009 DONE
DetailsTisha Gallop
Inspection Record Card- Bld  11/2/2009 DONE
Details
Permit Ready to Issue  11/2/2009  
Telephone call  11/2/2009 DONE
called left messsage for Cornel permit ready and fee given Also need GC & RP
Plan assigned to (CDM)10/21/200910/20/200910/30/2009 PASS
DetailsCarl D Madsen
10/30/2009 14:38:32 CDM - activity updated through activity BLDA022 from case BLD09-01867.
Routing - PLAN CHECK10/27/2009 10/30/2009 PASS
DetailsCarl D Madsen
Routing - PLAN CHECK10/26/2009 10/30/2009 PASS
DetailsCarl D Madsen
Special inspection start-up form is required. Talked to Damon at Larson Architects and he will E-Mail me the form 10-28-09 CDM
PLANS/APPL TAKEN TO FRONT DESK  10/30/2009  
Routing - FIRE  10/28/2009 PASS
DetailsCarl D Madsen
Verify in field CDM
1st review completed  10/28/2009 FAIL
Special inspection stat-up form is required Talked to Damon at Larson Architects, he will E-Mail me the form 10-28-09 CDM
Case Summary (BLD)  10/28/2009 DONE
Routing - Erosion and Sediment10/27/2009 10/27/2009 PASS
DetailsSteven Webb
ESC plan approved with attached conditions. ESC09-00667
Routing - PLANNING10/26/2009 10/26/2009 PASS
DetailsAndrea Tuning
Application received 10/20/200910/21/2009 DONE
DetailsTisha Gallop
Plans ACCEPTED BY PLAN TECH  10/20/2009 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  10/20/2009 DONE
DetailsTisha Gallop