Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD09-01902
StatusFinaled
Name GAFFORD CONSTRUCTION INC
Site Address 1620 W RIVER ST
Project NameINTERFAITH SANCTUARY
Customer Number 
ePlanReviewNo
Description
(INTERFAITH SANCTUARY HOUSING SERVICES - PHASE 2 - REROOF & RTU CURBS) This building is fire sprinklered. To complete Phase 2 of a 5 phase upgrade agreement dated November 14, 2008. This building is one story tall and has a total floor area of about 9,711 square feet. It is used as a homeless shelter. Work is to include foam plastic roof insulation, a thermoplastic roof membrane (i.e. TGFU.R10321 - Dow Roofing Systems, LLC), a steel ladder to the roof, a roof scuttle, a guard at roof scuttle, and curbs for existing and future roof top HVAC units. Some existing roof top HVAC units will be moved to new curbs and will be used until new HVAC units can be acquired. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Plan Reviewer's activity  6/21/2010 DONE
Took office copy to Records.
First Notice5/4/20105/4/20105/10/2010 DONE
DetailsDave Hannah
FIRE-Alarm Testing5/4/20105/4/20105/4/2010PPASS
DetailsForrest France
Fire alarm system modifications are not associated with this scope of permit work- see annotation on inspection record.
BLD-Final5/3/20105/4/20105/4/2010PPASS
DetailsDave Hannah
Shawn-please call at least 30 mins prior to inspection
DOC - Permit Finaled5/4/20105/4/20105/4/2010PPASS
DetailsDave Hannah
FIRE-Final Inspection5/3/20105/4/20105/4/2010APASS
DetailsForrest France
Life safety passed field inspection.
Letter of compliance/Occupancy  5/4/2010 DONE
Override - People Holds  5/3/2010  
BLD-Conference3/2/20103/2/20103/2/2010APASS
DetailsDave Hannah
Check status of reroofing. all most complete contractor will schedule final
Override - People Holds  3/2/2010  
Override - People Holds  12/16/2009  
Issue PAID IN FULL permit  12/16/2009 DONE
Plan assigned to (CJW)10/28/2009 12/15/2009 PASS
DetailsCarl Westfall
12/15/2009 12:49:54 CJW - activity updated through activity BLDA022 from case BLD09-01902.
Routing - PLAN CHECK11/10/2009 12/15/2009 PASS
DetailsCarl Westfall
(12-1-09) Started the resubmittal review. The issue of roof loading remained. All other items resolved. (12-10-09) Called and talked to the Architect. Asked for a comparison of the shear and moment under the existing loading and the shear and moment under the proposed loading. He said that his Structural Engineer would provide. (12-15-09) The requested analysis was provided. Drawings approved after several E-mail messages back and forth.
PLANS/APPL TAKEN TO FRONT DESK  12/15/2009 DONE
Inspection Record Card- Bld  12/15/2009 DONE
Telephone call  12/15/2009 DONE
Details
t/c w william hamilin at ###-#### - permit ready and fees given
Override - People Holds  12/15/2009  
Permit Ready to Issue  12/15/2009 DONE
Details
Plan resubmittals received  12/8/2009  
DetailsCarl Westfall
rec'd response letter and two copies of sheets 3.60, 1.10 and 2.10- taken to Carl W
Plan resubmittals received  11/25/2009  
DetailsCarl Westfall
Rec'd respone letters and two copies of sheet 1.00; 3.10; & 3.60- taken to Carl W
Route to Impact Fee Review11/5/200911/10/200911/17/2009 PASS
DetailsCindy M. Gould
No impact fees
Routing - FIRE11/5/200911/5/200911/10/2009 PASS
DetailsScott Arellano
Attached IFC comments to plans
1st review completed  11/10/2009 FAIL
Failed Plan Check
Routing - PLAN CHECK10/28/2009 11/5/2009 FAIL
DetailsCarl Westfall
The IBC plan review was started on November 3, 2009 and finished on November 5, 2009. Revised drawings were required. See the plan review report. Drawings in plan review 7 days.
Pending Assignment by JCB10/27/2009 10/28/2009 DONE
DetailsJason Blais
Plans ACCEPTED BY PLAN TECH  10/27/2009 DONE
Application received 10/26/200910/26/2009 DONE
DetailsAlexandra L. DeYoung
Intake Approval  10/26/2009 PASS