Third Notice | | 8/27/2010 | 8/30/2010 | | DONE |
|
|
|
|
Third Notice | | 8/7/2010 | 8/13/2010 | | DONE |
|
|
|
faxed
|
Second Notice | | 7/26/2010 | 8/2/2010 | | DONE |
|
|
|
|
First Notice | | 6/25/2010 | 7/16/2010 | | DONE |
|
|
|
|
Permanent Occupancy | | | 6/15/2010 | | DONE |
|
|
|
|
BLD-Conference | 6/10/2010 | 6/10/2010 | 6/10/2010 | P | PASS |
Tom Arcoraci
|
|
|
john Phone #: ###-####
|
BLD-Final | 6/10/2010 | 6/10/2010 | 6/10/2010 | P | PASS |
Tom Arcoraci
|
|
|
john Phone #: ###-####
|
FIRE-Final Inspection | 6/10/2010 | 6/10/2010 | 6/10/2010 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed.
|
FIRE-Conference | 6/7/2010 | 6/7/2010 | 6/7/2010 | P | DONE |
Troy Cobbley
|
|
|
I went over life safety requirements with John. They included providing the sticker and an indicator at the main exit. The fire extinguisher also needed to be mounted.
|
Print Occupancy Form | | | 6/1/2010 | | DONE |
|
|
|
|
BLD-Other | 5/20/2010 | 5/21/2010 | 5/21/2010 | A | PASS |
Tom Arcoraci
|
|
|
Ceiling cover inspection. Open area will be filled by cooler boxes. Fireproofing is patched, though Dennis Adams- SARMC architect- states that fireproofing of this area is no longer required by code. Elec. inspection am also. Inspection requested from web by: John Lodman Phone #: ###-####
|
Additional plans submitted | | | 5/18/2010 | | PASS |
|
|
|
Resubmittal copies of Sheets A2.1 & A3.1 changing out swining service entry door to a roll up service entry door with indicated signage on door and marking of step edge as noted on plan resubmittals. All original plan review comments and conditions, except for this roll-up door are still applicable.
|
Telephone call | | | 5/18/2010 | | DONE |
|
|
|
Call to Connie St. George, Habitec, to pickmup copy of approved plan resubmittal change for roll-up door and take to field to insert into original approved plans.
|
BLD-Wall cover | 4/28/2010 | 4/29/2010 | 4/30/2010 | P | PART |
Dave Hannah
|
|
|
plumbing inspection pending Inspection requested from web by: John Lodman Phone #: ###-####
|
BLD-Wall cover | 4/29/2010 | 4/30/2010 | 4/30/2010 | A | PASS |
Dave Hannah
|
|
|
duplicate of 4/29 request which didn''t get done. not feeling the love. Inspection requested from web by: John Lodman Phone #: ###-#### ok to cover walls will need to check fire proofing on ceilind and ceiling grid inspection
|
BLD-Aging Inspection | 4/28/2010 | 4/28/2010 | 4/28/2010 | | PART |
Tom Arcoraci
|
|
|
no call for inspection
|
BLD-Other | 2/22/2010 | 2/22/2010 | 2/22/2010 | A | PASS |
Tom Arcoraci
|
|
|
no call for insp
|
BLD-Aging Inspection | 2/22/2010 | 2/22/2010 | 2/22/2010 | | PART |
Tom Arcoraci
|
|
|
|
Issue PAID IN FULL permit | | | 11/23/2009 | | DONE |
|
|
|
|
Telephone call | | | 11/19/2009 | | DONE |
Tisha Gallop
|
|
|
called and left vm for Connie St.George/Habitec Arch. permit is ready and fees
|
Permit Ready to Issue | | | 11/19/2009 | | DONE |
Tisha Gallop
|
|
|
|
1st review completed | | | 11/18/2009 | | FAIL |
|
|
|
Failed Plan Check
|
Routing - PLAN CHECK | 11/18/2009 | | 11/18/2009 | | PEND |
Steven Webb
|
|
|
Re-routing to Steve Webb
|
Plan assigned to (DRS) | 10/28/2009 | | 11/18/2009 | | PASS |
Dan Stuart
|
|
|
11/18/2009 16:08:30 DRS - activity updated through activity BLDA022 from case BLD09-01903.
|
Routing - FIRE | 11/16/2009 | | 11/18/2009 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
Routing - Erosion and Sediment | 11/18/2009 | | 11/18/2009 | | PASS |
Steven Webb
|
|
|
From Connie St. George, architect - RP is Chuck Elumbaugh, CON05-00250, ###-####. ESC plan waiver approved with attached conditions. ESC09-00734
|
Routing - PLAN CHECK | 11/18/2009 | | 11/18/2009 | | PASS |
Dan Stuart
|
|
|
To permit desk to issue.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/18/2009 | | PASS |
|
|
|
|
Print Occupancy Form | | | 11/18/2009 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 11/6/2009 | | 11/16/2009 | | PASS |
Dan Stuart
|
|
|
Routing to ESC then Fire.
|
Plan Reviewer's activity | | | 11/16/2009 | | DONE |
|
|
|
E-mail from Connie St. George specifying Chuck Elumbaugh, CON05-00250, as RP. Contact ###-#### Routing plans back to Steve Webb.
|
Routing - Erosion and Sediment | 11/16/2009 | | 11/16/2009 | | FAIL |
Steven Webb
|
|
|
ESC application did not include a certified responsible person, one is required. Plan included a contractor. ESC09-00734.
|
Plan resubmittals received | | | 11/13/2009 | | |
Dan Stuart
|
|
|
received cover letter, ESC application, ESC waiver, plan review report, 2 sets of A0.0, A0.1, A3.1, M1.0, M2.0, E1.0, E2.0 - plans taken to Dan Stuart
|
Routing - PLUMBING | 11/4/2009 | | 11/6/2009 | | PASS |
Bill VanDegrift
|
|
|
move general plumbing fixture R.P. upstream of filter. verify the existing 4" waste line is not an existing rain water line. see attached HDR plan page PP-1-1 and PD-101. mount R.P.s over mop sink.
|
Routing - PLAN CHECK | 10/29/2009 | | 11/4/2009 | | FAIL |
Dan Stuart
|
|
|
Resubmittals required. routing to plumbing plan review.
|
Plan resubmittals requested | | | 11/4/2009 | | DONE |
|
|
|
Copy of plan review e-mailed to Connie St. George, Habitec Architects.
|
Routing PW Sewer Rating | 10/29/2009 | | 10/29/2009 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - PUBLIC WORKS | 10/28/2009 | | 10/29/2009 | | PASS |
Beverly Hall
|
|
|
|
Pending Assignment by JCB | 10/27/2009 | | 10/28/2009 | | DONE |
Jason Blais
|
|
|
|
Routing - Addressing | 10/28/2009 | | 10/28/2009 | | PASS |
April Wing
|
|
|
|
Application received | | 10/26/2009 | 10/26/2009 | | DONE |
Alexandra L. DeYoung
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 10/26/2009 | | DONE |
Alexandra L. DeYoung
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/26/2009 | | DONE |
Alexandra L. DeYoung
|
|
|
|
Intake Approval | | | 10/26/2009 | | PASS |
Dan Stuart
|
|
|
|