Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD09-01986
StatusFinaled
Name JRG CONSTRUCTION
Site Address 2888 W CHERRY LN
Project Nameoak park clubhouse addtion
Customer Number 
ePlanReviewNo
Description
(OAK PARK COMMUNITY CENTER - Addition) Permit is to demo 291 square feet of existing pergola and add on an additional 955 square feet. The existing building was 3,162 square feet and with the demo and addition it will increase to 3,826 square feet. Approval contingent upon adhering to the approved plans on file and attached structural calculations. Work to include: construction of exterior bearing walls, [constructions of interior non-bearing partitions to create a new multi-purpose room, new conference room, new computer lab, new business center, and new exercise room], installation of new interior doors and associated hardware, and finishes in compliance with chapter 8 of the 2006 IBC. This building is not fire sprinklered. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 5/7/20115/10/2011 DONE
DetailsChristina Prado
Mailed 5-10-11
First Notice 4/25/20114/27/2011 DONE
BLD-Final4/14/20114/15/20114/15/2011APASS
DetailsTom Arcoraci
dave Phone #: ###-####
Print Occupancy Form  4/15/2011  
Permanent Occupancy  4/15/2011 DONE
FIRE-Final Inspection4/14/20114/14/20114/14/2011PPASS
DetailsForrest France
Correction items verified for completion. Life safety passed.
FIRE-Final Inspection4/11/20114/11/20114/11/2011PFAIL
DetailsForrest France
Post max occupant load sign at the great room, repair one exit sign at the west side, remove keyed deadbolt locks at three interior doors. See plan review comments for details.
Zoning Approval4/11/20114/11/20114/11/2011 PASS
DetailsSarah Schafer
BLD-Energy code compliance2/9/20112/11/20112/11/2011PPASS
DetailsTom Arcoraci
dave Phone #: ###-####
BLD-Framing/Rough-in2/4/20112/7/20112/7/2011APART
DetailsTom Arcoraci
Dave Phone #: ###-#### wip ok to insulate pending elec
BLD-Energy code compliance1/7/20111/10/20111/10/2011APASS
DetailsTom Arcoraci
BLD-Framing/Rough-in1/6/20111/7/20111/7/2011APART
DetailsTom Arcoraci
dave Phone #: ###-####
BLD-Framing/Rough-in12/27/201012/28/201012/28/2010APART
DetailsTom Arcoraci
dave Phone #: ###-####
BLD-Footing11/29/201011/30/201011/30/2010APASS
DetailsTom Arcoraci
jared Phone #: ###-####
BLD-Aging Inspection10/14/201010/14/201010/14/2010 PASS
DetailsTom Arcoraci
Extend Permit 90/180 days 8/12/20108/12/2010 DONE
Received phone call from Tomlinson and Associates reqesting a permit extension and a follow-up letter dated July 26, 2010 requesting a 180 extension on this permit. Construction was delayed to allow them to keep the pool open at Oak Park during the summer season for residents.
Reopen Permit (ISS)  8/12/2010 DONE
See notes under permit extension.
DOC - Permit Expired7/19/20107/19/20107/19/2010PPASS
DetailsDave Hannah
BLD-Other6/22/20107/19/20107/19/2010APASS
DetailsDave Hannah
BLD-Aging Inspection6/21/20106/21/20106/22/2010 PART
DetailsTom Arcoraci
exp on 7-18-10
BLD-Aging Inspection4/20/20104/20/20104/20/2010 PASS
DetailsTom Arcoraci
Issue PAID IN FULL permit  1/19/2010 DONE
Print Occupancy Form  1/13/2010 DONE
Print Occupancy Form  1/13/2010 DONE
Permit Ready to Issue  1/13/2010 DONE
Telephone call  1/13/2010 DONE
called left message for Patrick Mckeegan permit ready and fee given Also need GC & RP
Routing - PLAN CHECK12/9/2009 1/12/2010 PASS
DetailsTim L. Woodard
Plans approved with redlines. TLW
PLANS/APPL TAKEN TO FRONT DESK  1/12/2010 DONE
DetailsTim L. Woodard
Case Summary (BLD)  1/12/2010 DONE
DetailsTim L. Woodard
Routing PW Sewer Rating  1/12/2010 PASS
DetailsBeverly Hall
Signed off on plans and routing sheet. TLW
Plan assigned to (TLW)12/1/2009 1/12/2010 PASS
DetailsTim L. Woodard
1/12/2010 16:46:35 TLW - activity updated through activity BLDA022 from case BLD09-01986.
Plan resubmittals received  1/5/2010  
DetailsTisha Gallop
received response letter, Mechanical heating and load calcs, Mechanical ComCheck, two copies of pages ESC1, A6.2; taken to Tim Woodard
1st review completed  12/9/2009 FAIL
Failed Plan Check
Routing - FIRE12/2/2009 12/9/2009 PASS
DetailsScott Arellano
Attached IFC comments to plans
Routing - PLAN CHECK11/12/2009 12/2/2009 FAIL
DetailsTim L. Woodard
Refer to plan review report. TLW
Plan assigned to (SRZ)11/5/2009 12/1/2009 CANC
DetailsSam Zahorka
Plan assigned to Tim Woodard.
Routing - PLANNING11/12/2009 11/12/2009 PASS
DetailsSarah Schafer
Approved. No need to process any planning applications per Sarah Schafer and Scott Spjute.
Routing - PLUMBING11/12/2009 11/12/2009 PASS
DetailsBill VanDegrift
no plumbing
Routing - Erosion and Sediment11/10/2009 11/12/2009 PASS
DetailsSteven Webb
ESC plan approved with attached conditions. ESC09-00717
Routing - PUBLIC WORKS11/6/2009 11/10/2009 PASS
DetailsBeverly Hall
Routing PW Drainage11/9/2009 11/10/2009 PASS
DetailsBrian Murphy
Routing - PLANNING Land Div11/5/2009 11/6/2009 PASS
DetailsDave Abo
Lot 1, Block 1 of Brampton Square Subdivision.
Routing - Addressing11/6/2009 11/6/2009 PASS
DetailsApril Wing
Application received 11/5/200911/5/2009 DONE
DetailsTisha Gallop
Plans ACCEPTED BY PLAN TECH  11/5/2009 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  11/5/2009 DONE
DetailsTisha Gallop
Pending Assignment by JCM11/5/2009 11/5/2009 BLDA
DetailsJohn Menard
11/5/2009 15:42:08 JCM - activity updated through activity BLDA160 from case BLD09-01986.
Plan routing begun/NEW & ADDTN  11/5/2009 DONE
DetailsTisha Gallop