Third Notice | | 11/8/2010 | 10/28/2010 | | DONE |
|
|
|
|
DOC - Permit Finaled | | | 10/25/2010 | | DONE |
Tisha Gallop
|
|
|
passed final insepction
|
BLD-Aging Inspection | 9/1/2010 | 9/1/2010 | 9/1/2010 | | DONE |
Jim Storey
|
|
|
|
BLD-Final | 6/28/2010 | 6/29/2010 | 6/29/2010 | A | PASS |
Jim Storey
|
|
|
dave Phone #: ###-####
|
FIRE-Final Inspection | 6/28/2010 | 6/28/2010 | 6/28/2010 | P | PASS |
Forrest France
|
|
|
Noted items completed, revised fire flow data per United Water verified okay. Life safety inspection passed. Discussed adjacent project schedule.
|
Zoning Approval | 6/7/2010 | 6/7/2010 | 6/7/2010 | | PASS |
Josh Wilson
|
|
|
|
FIRE-Final Inspection | 6/4/2010 | 6/4/2010 | 6/4/2010 | P | FAIL |
Troy Cobbley
|
|
|
Provide verification of the required water flow or install the fire hydrant. Also remove the thumbturn locks from both of the doors.
|
BLD-Final | 6/1/2010 | 6/3/2010 | 6/3/2010 | A | NR |
Jim Storey
|
|
|
david Phone #: ###-#### need p$z and fire final inspections.
|
FIRE-Conference | 5/12/2010 | 5/12/2010 | 5/13/2010 | P | DONE |
Forrest France
|
|
|
On site visit regarding fire lane access conditions per M. Sentenno.
|
BLD-Other | 4/14/2010 | 4/14/2010 | 4/15/2010 | A | DONE |
Forrest France
|
|
|
Contacted M. Sentenno regarding FD access provisions on site.
|
FIRE-Conference | 4/13/2010 | 4/13/2010 | 4/13/2010 | P | DONE |
Forrest France
|
|
|
On site meeting with contractor regarding fire department access, BO and FM agreement letter, and appendix D IFC 2006.
|
BLD-Energy code compliance | 3/12/2010 | 3/17/2010 | 3/17/2010 | A | PASS |
Jim Storey
|
|
|
Dave Phone #: ###-####
|
BLD-Framing/Rough-in | 3/12/2010 | 3/16/2010 | 3/16/2010 | A | PASS |
Jim Storey
|
|
|
Air seal in framing inspection-Dave Phone #: ###-####
|
BLD-Foundation | 2/8/2010 | 2/8/2010 | 2/8/2010 | P | PASS |
Jim Storey
|
|
|
Jared Phone #: ###-####
|
BLD-Footing | 2/4/2010 | 2/5/2010 | 2/5/2010 | A | PASS |
Jim Storey
|
|
|
Jared Phone #: ###-####
|
Issue PAID IN FULL permit | | | 1/22/2010 | | |
|
|
|
|
Additional plans submitted | | | 1/15/2010 | | DONE |
Tisha Gallop
|
|
|
received letter from ACHD, put with plans that are RDY.
|
Print Occupancy Form | | | 1/11/2010 | | DONE |
|
|
|
|
Telephone call | | | 1/11/2010 | | DONE |
Barbara Stitt
|
|
|
Called Stan Cole and told him that permit is ready, fees due, need ACHD information, need new cert of value with electrical value included, and that Interim RP is about to expire so they need to register into a class and show proof or find an RP that is valid for the length of the project///1-11-10 @ 10:31am BAS
|
Permit Ready to Issue | | | 1/11/2010 | | DONE |
|
|
|
|
Routing - FIRE | 1/5/2010 | | 1/8/2010 | | PASS |
Scott Arellano
|
|
|
Attached updated IFC comments to plans
|
Routing - PLAN CHECK | 1/8/2010 | | 1/8/2010 | | PASS |
John Menard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/8/2010 | | DONE |
John Menard
|
|
|
|
Plan assigned to (JCM) | 11/6/2009 | | 1/8/2010 | | PASS |
John Menard
|
|
|
1/8/2010 14:25:17 JCM - activity updated through activity BLDA022 from case BLD09-01992.
|
Routing - PLAN CHECK | 11/24/2009 | | 1/5/2010 | | |
John Menard
|
|
|
|
Plan resubmittals received | | | 12/22/2009 | | |
John Menard
|
|
|
Rec'd 2 copies of sheet S1.0- inserted by arch and taken back to John M
|
Plan Reviewer's activity | | | 12/22/2009 | | PASS |
John Menard
|
|
|
Reviewed and approved final outstanding issue. JCM
|
Routing - Erosion and Sediment | 11/23/2009 | | 11/24/2009 | | PASS |
Steven Webb
|
|
|
ESC plan approved with attached conditions.
|
Plan resubmittals requested | | | 11/24/2009 | | DONE |
John Menard
|
|
|
E-mailed the architect a request for additional plan revisions. JCM
|
Routing - PLAN CHECK | 11/20/2009 | | 11/23/2009 | | FAIL |
John Menard
|
|
|
|
Meeting | | | 11/23/2009 | | DONE |
Scott Arellano
|
|
|
Met with Stan Cole and discussed fire department vehicle access deficiences and minimum fire flow requirements for the proposed commercial building.
|
Route to Impact Fee Review | 11/17/2009 | 11/20/2009 | 11/20/2009 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - FIRE | 11/17/2009 | 11/17/2009 | 11/20/2009 | | FAIL |
Scott Arellano
|
|
|
Faxed and emailed resubmittal items to architect.
|
1st review completed | | | 11/20/2009 | | FAIL |
|
|
|
Failed Erosion & Soil Control, Plan Check, Fire
|
Plan resubmittals requested | | | 11/17/2009 | | DONE |
John Menard
|
|
|
E-mailed the architect requesting revisions. JCM
|
Routing - PLAN CHECK | 11/16/2009 | | 11/17/2009 | | FAIL |
John Menard
|
|
|
John Menard
|
Routing - Erosion and Sediment | 11/13/2009 | | 11/16/2009 | | FAIL |
Steven Webb
|
|
|
No ESC plan, narrative or application included with submittals. Informed applicant, Stan C.
|
Routing - PLANNING | 11/16/2009 | | 11/16/2009 | | PASS |
Josh Wilson
|
|
|
Josh Wilson - DRH09-00271
|
Routing - PUBLIC WORKS | 11/6/2009 | | 11/13/2009 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Drainage | 11/9/2009 | | 11/12/2009 | | PASS |
Brian Murphy
|
|
|
|
Routing - Addressing | 11/6/2009 | | 11/6/2009 | | PASS |
April Wing
|
|
|
|
Pending Assignment by JCM | 11/6/2009 | | 11/6/2009 | | BLDA |
John Menard
|
|
|
11/6/2009 08:21:37 JCM - activity updated through activity BLDA166 from case BLD09-01992.
|
Plans ACCEPTED BY PLAN TECH | | | 11/6/2009 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/6/2009 | | DONE |
|
|
|
|
Routing - PLANNING Land Div | 11/6/2009 | | 11/6/2009 | | PASS |
Todd Tucker
|
|
|
|
Application received | | 11/5/2009 | | | |
|
|
|
|
Plan resubmittals received | | | | | |
|
|
|
Received 4 copies of sheets A2.0, A4.0, A6.0, S1.0, ESC sheet1 and 2 copies of ESC plans and appliaction and insterted by Stan Cole///11-20-09 BAS
|