Telephone call | | | 4/5/2010 | | DONE |
Tisha Gallop
|
|
|
per phone call from Matt/HC Co. bill for final fees should be sent to Brighton Corp.
|
Second Notice | | 3/20/2010 | 3/25/2010 | | DONE |
|
|
|
|
First Notice | | 3/8/2010 | 3/10/2010 | | DONE |
|
|
|
|
Permanent Occupancy UNPAID FEE | | | 2/26/2010 | | DONE |
Tisha Gallop
|
|
|
|
BLD-Final | 2/19/2010 | 2/19/2010 | 2/19/2010 | P | PASS |
Jim Sly
|
|
|
Allied has the required fire permit in hand. We should be ready for complete final. Please call with any questions. Inspection requested from web by: Blaine Shoopman Phone #: ###-#### OK for Perm. Occ.
|
FIRE-Final Inspection | 2/19/2010 | 2/19/2010 | 2/19/2010 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed.
|
BLD-Final | 2/17/2010 | 2/18/2010 | 2/18/2010 | P | PART |
Jim Sly
|
|
|
Please call Blaine 30 minutes in advance of inspection. Inspection requested from web by: Blaine Shoopman Phone #: ###-#### OK for Temp Occ. OK for Perm Occ. when New Fire permit for Mag locksis finaled.
|
FIRE-Final Inspection | 2/17/2010 | 2/18/2010 | 2/17/2010 | A | PART |
Troy Cobbley
|
|
|
A temporary occupancy is being given with Scott Arellano's permission until the fire alarm quick permit is issued and finaled and the three missing doors/hardware are installed.
|
BLD-Final | 2/16/2010 | 2/17/2010 | 2/16/2010 | A | CANC |
Jim Sly
|
|
|
Please call Blaine 30 minutes before inspection Inspection requested from web by: Blaine Shoopman Phone #: ###-#### Inspection cancelled from web by: Blaine Shoopman
|
FIRE-Final Inspection | 2/16/2010 | 2/16/2010 | 2/16/2010 | P | FAIL |
Troy Cobbley
|
|
|
Provide the three missing doors and their hardware and provide a fire alarm permit showing the door magnets at the main exit doors interconnected to the existing fire alarm system. The functionality of the door magnets was tested ok.
|
BLD-Framing/Rough-in | 2/1/2010 | 2/2/2010 | 2/2/2010 | A | PASS |
Jim Sly
|
|
|
This is above grid inspection. Please Call Blaine at ###-#### 30 minutes before inspection. Internet Inspection Request from: Blaine Shoopman Grid OK
|
BLD-Energy code compliance | 12/22/2009 | 12/23/2009 | 12/23/2009 | A | PASS |
Jim Sly
|
|
|
Please call Blaine 30 minuntes before inspection Phone #: ###-#### Internet Inspection Request from: Blaine Shoopman
|
BLD-Framing/Rough-in | 12/11/2009 | 12/14/2009 | 12/14/2009 | A | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Internet Inspection Request from: Blaine Shoopman
|
Issue PAID IN FULL permit | | | 12/1/2009 | | DONE |
Tisha Gallop
|
|
|
|
Received Certificate of Value | | | 11/25/2009 | | DONE |
Barbara Stitt
|
|
|
Received a revised cert of value and recalculated fees
|
Telephone call | | | 11/25/2009 | | DONE |
|
|
|
11-25-09 Called Connie ST Geroge permit ready and fee given
|
Plan assigned to (CDM) | 11/9/2009 | 11/9/2009 | 11/24/2009 | | PASS |
Carl D Madsen
|
|
|
11/24/2009 11:30:58 CDM - activity updated through activity BLDA022 from case BLD09-02009.
|
Case Summary (BLD) | | | 11/24/2009 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 11/24/2009 | | 11/24/2009 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/24/2009 | | |
|
|
|
|
Print Occupancy Form | | | 11/24/2009 | | DONE |
|
|
|
|
Print Occupancy Form | | | 11/24/2009 | | DONE |
|
|
|
|
Telephone call | | | 11/24/2009 | | DONE |
|
|
|
t/c w connie at ###-#### - permit ready and fees given - also need gc name, rce# and rp name
|
Permit Ready to Issue | | | 11/24/2009 | | DONE |
|
|
|
|
Routing - FIRE | | | 11/17/2009 | | PASS |
|
|
|
Verify in field CDM
|
1st review completed | | | 11/17/2009 | | FAIL |
|
|
|
|
Routing - PUBLIC WORKS | 11/9/2009 | | 11/13/2009 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - PLAN CHECK | 11/13/2009 | | 11/13/2009 | | FAIL |
Carl D Madsen
|
|
|
Engineering calculations and details required for placement of new RTU's. Sent E-Mail to Brandi Johns at Habitech. 11-17-09 CDM
|
Routing PW Sewer Rating | 11/10/2009 | | 11/10/2009 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 11/9/2009 | | 11/10/2009 | | PASS |
April Wing
|
|
|
|
Application received | | 11/9/2009 | 11/9/2009 | | DONE |
Alexandra L. DeYoung
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 11/9/2009 | | DONE |
|
|
|
|