Permit Information
Permit NumberBLD09-02045
StatusFinaled
Name KURT WILES
Site Address 150 N CAPITOL BLVD
Project NamePW Adm - 4th floor
Customer Number 
ePlanReviewNo
Description
(Boise City Hall - Public Works Administration - 4th floor) To install (four) Solatube Model 290 DS (14-inch diameter), Brighten Up Series, daylighting systems through the exterior roof to the interior office spaces in the location shown on the plans. Work to include: Provide penetration of the existing roof by concrete coring the precast roof slab, installation of the Solatube systems per the manufacturers installation instructions, restoring the roofs moisture protection system to provide a water tight seal matching or exceeding existing conditions. All work per the approved plans, in accordance with the published manufacturers installation instructions, ESR-2253 report, and the inspectors final approval. This building is fully fire sprinkled and contains an alarm system, any alterations or modifications to the sprinkler system or alarm system WILL Require a separate permit and shall be install per NFPA #13 as regulated by the fire department. **SRZ**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice4/12/20114/12/20115/10/2011 DONE
DetailsDave Hannah
BLD-Final4/11/20114/12/20114/12/2011APASS
DetailsDave Hannah
Keith-Please call at least 30 mins in advance Phone #: ###-####
DOC - Permit Finaled4/12/20114/12/20114/12/2011PPASS
DetailsDave Hannah
Reopen Permit (ISS)  4/11/2011  
DetailsBarbara Stitt
Re-open permit per Dave Hannah
(F) Reprint permit  4/11/2011 DONE
DetailsBarbara Stitt
DOC - Permit Expired9/1/20109/1/20109/1/2010PPASS
DetailsDave Hannah
BLD-Aging Inspection8/26/20108/26/20109/1/2010 PASS
DetailsDave Hannah
BLD-Conference4/12/20104/12/20104/13/2010PPASS
DetailsDave Hannah
exps 7/10/10
BLD-Aging Inspection4/12/20104/12/20104/12/2010 PASS
DetailsDave Hannah
Plan assigned to (SRZ)11/13/200911/13/20091/11/2010 PASS
DetailsSam Zahorka
1/11/2010 10:49:16 SRZ - activity updated through activity BLDA022 from case BLD09-02045.
Routing - PLAN CHECK1/7/2010 1/11/2010 PASS
DetailsSam Zahorka
Case Summary (BLD)  1/11/2010 DONE
DetailsSam Zahorka
PLANS/APPL TAKEN TO FRONT DESK  1/11/2010 DONE
DetailsSam Zahorka
Telephone call  1/11/2010 DONE
DetailsSam Zahorka
Spoke with Corey Alder again with Solatube and requested a letter to re-assure the proposed installation "Method of construction" will meet all warranty requirements. The letter is attached under documents.
Inspection Record Card- Bld  1/11/2010 DONE
Telephone call  1/11/2010 DONE
Called Kirk left message permit ready and fee given
Permit Ready to Issue  1/11/2010 DONE
Issue & PRINT to be Invoiced  1/11/2010  
Telephone call  1/7/2010 DONE
DetailsSam Zahorka
Called applicant and requested he call Cory Alder and revise drawings.
Routing - PLAN CHECK1/7/2010 1/7/2010 FAIL
DetailsSam Zahorka
Telephone call  1/6/2010 DONE
DetailsSam Zahorka
Called Greg with Solar Concepts and asked him technical code questions about this product. He referred me to the Solatube website for assistance.
Telephone call  1/6/2010 DONE
DetailsSam Zahorka
Spoke with Gina Stark at Solatube and she referred me to Cory Alder (###-####) to answer my technical code questions. I faxed the applicants installation & roof detail to him. He stated there is some corrections needed to drawings to meet his approval for product warranty issues.
Plan resubmittals received  1/4/2010  
DetailsTisha Gallop
received three copies of sheet 1 of 1, taken to Sam Zahorka.
Routing - PLAN CHECK11/13/2009 11/17/2009 FAIL
DetailsSam Zahorka
Corrections requested.
1st review completed  11/17/2009 DONE
DetailsSam Zahorka
Application received 11/13/200911/13/2009 DONE
DetailsTisha Gallop
Plans ACCEPTED BY PLAN TECH  11/13/2009 DONE
DetailsTisha Gallop