Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD09-02049
StatusFinaled
Name CRAZY 8
Site Address 350 N MILWAUKEE AVE Unit: 2180
Project NameBTS - #2180 - CRAZY 8
Customer Number 
ePlanReviewNo
Description
(CRAZY 8 - BOISE TOWNE SQUARE - SPACE 2180) To remodel an existing 2,305 square feet retail tenant space for a new retail tenant. Work to include: [installation of interior non-bearing partition walls to create, a stockroom, a sales area, and an exiting hallway], installation of new flooring throughout, construction of a new storefront system, installation of suspended ceiling system per CISCA 0-2, new lighting, new ducts and diffusers, and interior finishes in compliance with ch. 8 of the 2006 IBC. This building is fully fire sprinklerd any alterations to the sprinkler system shall be maintained per NFPA #13 as regulated by the fire department, The smoke evacuation system shall remain operational as originally installed under the 1985 UBC. The design, testing and utilization of industrial steel storage racks shall be in accordance with the RMI Specification for the Design, Testing and Utilization of Industrial Steel Storage Racks.**TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 10/11/201010/27/2010 DONE
Telephone call  10/27/2010 DONE
DetailsTisha Gallop
spoke with Arthur Macumera w/Gymboree Corp (owner of Crazy 8) he said Greenwood Const. is out of business and final total project value is $55,114; he said Precision Permits put the initial value on and they were way over.
Third Notice 8/27/20109/27/2010 DONE
mailed
Third Notice 8/7/20108/13/2010 DONE
faxed (error), mailed
Second Notice 7/26/20108/2/2010 DONE
First Notice 6/19/20107/16/2010 DONE
Telephone call  6/9/2010 DONE
DetailsTisha Gallop
Per phone call with Mike Jordan to clarify mechanical work only replace the existing diffuesers with new, and no plumbing work done.
Permanent Occupancy  6/9/2010 DONE
DetailsTisha Gallop
BLD-Final6/8/20106/8/20106/8/2010APASS
DetailsMike Jordan
Ok for perm occ. Noted that existing flex was used, only new diffusers were added. No mech. work that required permit.
BLD-Other6/7/20106/8/20106/8/2010APASS
DetailsMike Jordan
cyril - glass Phone #: ###-####
BLD-Final6/2/20106/3/20106/3/2010PPART
DetailsMike Jordan
cyril Phone #: ###-####. Still needs to install storefront glass and provide paperwork for millwork. everything else ok.
FIRE-Final Inspection6/2/20106/3/20106/3/2010APASS
DetailsTroy Cobbley
Life safety passed. Fire alarm passed.
BLD-Final6/1/20106/2/20106/2/2010PNR
DetailsMike Jordan
Cyril Phone #: ###-####. Needs fire/life/safety.
BLD-Other5/21/20105/24/20105/24/2010APART
DetailsMike Jordan
cyril - ceiling grid Phone #: ###-####. Needs to provide wires on diffusers. Will check on final. Pending elec. rough in inspection.
BLD-Other5/20/20105/21/20105/21/2010ACANC
DetailsMike Jordan
request first thing in AM//grid and above grid inspection//Cyril Webb Phone #: ###-####
(F) Reprint permit  5/12/2010 DONE
BLD-Framing/Rough-in4/29/20104/29/20104/29/2010PPASS
DetailsDave Hannah
cyril Phone #: ###-#### ok to cover after elec r/i
Issue PAID IN FULL permit  4/16/2010 DONE
DetailsTisha Gallop
Print Occupancy Form  1/14/2010 DONE
Details
Telephone call  1/14/2010 DONE
Details
t/c w lyn davies at ###-#### - permit ready and fees given
Permit Ready to Issue  1/14/2010 DONE
Details
Plan assigned to (TLW)11/13/2009 1/13/2010 PASS
DetailsTim L. Woodard
1/13/2010 16:24:02 TLW - activity updated through activity BLDA022 from case BLD09-02049.
Routing - PLAN CHECK1/13/2010 1/13/2010 PASS
DetailsTim L. Woodard
Plans approved with resubmittals.
PLANS/APPL TAKEN TO FRONT DESK  1/13/2010 DONE
DetailsTim L. Woodard
Case Summary (BLD)  1/13/2010 DONE
DetailsTim L. Woodard
Plan resubmittals received  1/6/2010  
DetailsTisha Gallop
received resubmittals by mail; received response comments from Finn Daniles Archtiects, response comments from Dunham (Engineer), response comments from CSHQA, Burn Barrier info, three copies of Interior Lighting Compliance, structural calcs, and plan sheets A0.0, A0.1, A2.1, A2.2, A3.1, A4.1, A5.1, A5.2, A5.3, A5.4, E2.0, M1.0, M2.0, S1.0; taken to Tim Woodard
Routing - FIRE  11/24/2009 PASS
DetailsTim L. Woodard
Field Verify. TLW
1st review completed  11/24/2009 FAIL
DetailsTim L. Woodard
Routing - PLAN CHECK11/13/2009 11/24/2009 FAIL
DetailsTim L. Woodard
Refer to plan review report. TLW
Application received 11/13/200911/13/2009 DONE
DetailsTisha Gallop
Plans ACCEPTED BY PLAN TECH  11/13/2009 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  11/13/2009 DONE
DetailsTisha Gallop