Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD09-02064
StatusFinaled
Name PERKINS CONSTRUCTION
Site Address 2150 W BOISE AVE
Project NameLDS - Boise State
Customer Number 
ePlanReviewNo
Description
(CHURCH OF JESUS CHRIST OF LATTER DAY SAINTS - Annex Building) Permit is to enlarge an existing church annex building by adding an 84 square foot entry vestibule. Approval contingent upon: adhering to the approved plans on file, CZC09-00207, and attached structural engineering. Work to include: construction of new vestibule, installation of new exit door, construction of new entrance ramp, and finishes in compliance with chapter 8 of the 2006 IBC. This building is not fire sprinklered. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 5/31/20106/4/2010 DONE
First Notice5/12/20105/12/20105/21/2010 DONE
DetailsJim Storey
BLD-Final5/11/20105/12/20105/12/2010APASS
DetailsJim Storey
vaughn Phone #: ###-####
DOC - Permit Finaled5/12/20105/12/20105/12/2010PPASS
DetailsJim Storey
BLD-Final5/10/20105/11/20105/11/2010PDEFR
DetailsJim Storey
vaughn Phone #: ###-####
FIRE-Final Inspection5/10/20105/10/20105/10/2010PPASS
DetailsForrest France
Inspection passed, life safety finaled.
BLD-Final5/7/20105/10/20105/10/2010ANR
DetailsJim Storey
vaughn - please call 1/2 hr prior so he can meet you there Phone #: ###-####
BLD-Aging Inspection4/29/20104/29/20104/29/2010 PASS
DetailsJim Storey
BLD-Conference4/29/20104/29/20104/29/2010PPASS
DetailsJim Storey
work in progess
BLD-Framing/Rough-in2/25/20102/26/20102/26/2010APASS
DetailsJim Storey
tim Phone #: ###-####
BLD-Energy code compliance2/26/20102/26/20102/26/2010APASS
DetailsJim Storey
Plan Reviewer's activity  1/28/2010 DONE
DetailsTim L. Woodard
Recieved compliant ramp alternate design. Sent plans to record for archieve and stamped an issue set to go to the job site. TLW
BLD-Footing1/14/20101/14/20101/14/2010PPASS
DetailsJim Storey
t.j. Phone #: ###-####
Issue PAID IN FULL permit  1/13/2010 DONE
DetailsTisha Gallop
Plan assigned to (TLW)11/16/2009 12/1/2009 PASS
DetailsTim L. Woodard
12/1/2009 10:38:14 TLW - activity updated through activity BLDA022 from case BLD09-02064.
Plan assigned to (TLW)11/30/2009 12/1/2009 PASS
DetailsTim L. Woodard
12/1/2009 10:38:14 TLW - activity updated through activity BLDA022 from case BLD09-02064.
Routing - Erosion and Sediment12/1/2009 12/1/2009 PASS
DetailsTim L. Woodard
Approved.
Routing - PLAN CHECK12/1/2009 12/1/2009 PASS
DetailsTim L. Woodard
Approved with Notes in Plan Review Report. TLW
PLANS/APPL TAKEN TO FRONT DESK  12/1/2009 DONE
DetailsTim L. Woodard
Case Summary (BLD)  12/1/2009 DONE
DetailsTim L. Woodard
Inspection Record Card- Bld  12/1/2009 DONE
Telephone call  12/1/2009 DONE
Called Gene permit ready and fee given Also need GC & RP
Permit Ready to Issue  12/1/2009  
Routing - PLANNING11/27/2009 11/30/2009 PASS
DetailsJoshua Johnson
CZC09-00207
1st review completed  11/30/2009 FAIL
DetailsTim L. Woodard
Failed Plan Review. TLW
Plan resubmittals received  11/30/2009 DONE
Details
received letter from architect with corrections - 2 sheets of A1.0 - taken to Tim
Routing - PLAN CHECK11/16/2009 11/27/2009 FAIL
DetailsTim L. Woodard
Needs new ramp design. Cross slope not met. TLW
Plans ACCEPTED BY PLAN TECH  11/16/2009 DONE
Application received 11/16/2009