Information based on query as of Friday, June 28, 2024.
Permit Information
Permit NumberBLD09-02069
StatusFinaled
Name KREIZENBECK CONSTRUCTORS
Site Address 1055 N CURTIS RD
Project NameST ALPHONSUS
Customer Number 
ePlanReviewNo
Description
(ST ALPHONSUS - CLINICAL LABORATORY RENOVATION) Renovation of existing Clinical Laboratory Department to accommodate the installation of an automatic testing line and relocation of the Histology and Cytology Departments. Work will include selective interior demolition in five different phases in conjunction with five phases of tenant remodel to allow Lab functions to continue. In order to maintain operation requirements of the Lab some existing rooms in the immediate Lab Clinic area will receive minimum modifications to facility maintaining use of equipment and work stations for lab activities while their portion of the clinic is demolished and remodeled. At the conclusion of the remodel all activities and support functions will be within the existing Clinical Lab and expanded Histology and Cytology Departments in the SE corner of the 1st floor of SARMC. Work includes construction of new non-bearing walls to create work / testing areas, relocation of existing walk-in cooler; relocation / construction of existing 2-hour fire barrier wall on west and north sides of new Cytology Dept.; structural modification for new door opening in concrete wall between Histology 101 & Cytology 103 (see 8-1/2" xx 11" structural design and details); and upgrades of electrical, mechanical, plumbing, sprinkler and alarm systems to meet tenant needs and provide / maintain code compliance. drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 2/14/20112/7/2011 DONE
This permit finaled on the web by Brandon Byington
First Notice2/1/20112/1/20112/4/2011 DONE
DetailsTom Arcoraci
BLD-Final2/1/20112/1/20112/1/2011PPASS
DetailsTom Arcoraci
cecil Phone #: ###-####
DOC - Permit Finaled2/1/20112/1/20112/1/2011PPASS
DetailsTom Arcoraci
FIRE-Final Inspection2/1/20112/1/20112/1/2011PPASS
DetailsTroy Cobbley
Life safety passed
FIRE-Final Inspection12/16/201012/16/201012/16/2010PFAIL
DetailsTroy Cobbley
Life safety will be ok to pass when the project related fire alarm permit has been addressed.
BLD-Framing/Rough-in11/15/201011/15/201011/15/2010PPASS
DetailsTom Arcoraci
cecil Phone #: ###-####
BLD-Conference9/21/20109/22/20109/22/2010APASS
DetailsTom Arcoraci
BLD-Aging Inspection9/21/20109/21/20109/21/2010 PASS
DetailsTom Arcoraci
BLD-Aging Inspection7/19/20107/19/20107/20/2010 PART
DetailsTom Arcoraci
work in progress ok
BLD-Final5/19/20105/19/20105/19/2010PPART
DetailsTom Arcoraci
Cecil Phone #: ###-#### phase 2 ok
FIRE-Final Inspection5/18/20105/18/20105/18/2010PPART
DetailsTroy Cobbley
The life safety for phase two passed.
BLD-Final4/8/20104/9/20104/9/2010APART
DetailsTom Arcoraci
cecil Phone #: ###-####
FIRE-Final Inspection4/7/20104/8/20104/8/2010APART
DetailsTroy Cobbley
The phase 1 fire life safety is passed.
Override - People Holds  4/7/2010  
Override - People Holds  1/19/2010  
Issue PAID IN FULL permit  1/19/2010 DONE
Routing - PLAN CHECK1/5/2010 1/8/2010 PASS
DetailsDan Stuart
Received Idaho Enginner Stamped Design calcs and legible detail for door clearance requirements and attached to plans. Inserted new plan sheets M1.0 & M1.1 for plumbing re-review. Routing to plumbing plan review.
Routing - PLAN CHECK1/8/2010 1/8/2010 PASS
DetailsDan Stuart
To permit desk to issue.
PLANS/APPL TAKEN TO FRONT DESK  1/8/2010 PASS
Inspection Record Card- Bld  1/8/2010 DONE
Telephone call  1/8/2010 DONE
called David permit ready and fee given 1-8-10 dld
Override - People Holds  1/8/2010  
Permit Ready to Issue  1/8/2010 DONE
Plan assigned to (DRS)11/18/2009 1/8/2010 PASS
DetailsDan Stuart
1/8/2010 11:20:48 DRS - activity updated through activity BLDA022 from case BLD09-02069.
Plan resubmittals received  1/7/2010  
DetailsTisha Gallop
received two copies of plan sheets M1.0, M1.1; taken to Dan Stuart
Plan Reviewer's activity  1/6/2010 DONE
I had called Ralph Evans and left a voice message on 1/5/10 asking that he call me. I tried to call his cell phone on 1/6/10 but no answer. I e-mailed him a copy of remaining Building Code details needed and second failure of plumbing review, giving him phone numbers to call, me and Bill Vandegrift, if he had questions.
Routing - PLUMBING1/5/2010 1/5/2010 FAIL
DetailsBill VanDegrift
Resubmitted Sheets M1.0 & M1.1 did not address required code corrections. Called mechanical Engineer to review needed items.
Routing - PLAN CHECK12/17/2009 1/4/2010 FAIL
DetailsDan Stuart
Inserted new mechanical plan sheets of 12/29/09 into plans and re-reouted back for plumbing re-review. Resubmittals did not address IBC Plan Review of 12/15/09.
Plan resubmittals received  12/29/2009  
DetailsDan Stuart
rec'd two copies of sheets M1.0 and M1.1; taken to Dan S
Routing - FIRE12/15/200912/15/200912/17/2009 PASS
DetailsScott Arellano
Attached IFC comments to plans
Telephone call  12/17/2009 DONE
Talked with Mr. Evans to make sure he received the plan review; to let him know I will be off for two weeks (back Jan 4, 2010) and to see if he could have resubs to me tommorrow so I can approved my part. Plumbing failed review so that also needs to be addressed.
1st review completed  12/17/2009 FAIL
Failed Plumbing, Plan Check
Route to Impact Fee Review12/15/200912/18/200912/15/2009 PASS
DetailsCindy M. Gould
Tenant improvement no impact fees
Routing - PLAN CHECK11/27/2009 12/15/2009 FAIL
DetailsDan Stuart
Copy of plan review e-mailed to architect. Plans routed for fire code analyst.
Routing - PLUMBING11/23/2009 11/27/2009 FAIL
DetailsBill VanDegrift
all water serving fixtures in the lab area must be protected by a reduced pressure backflow preventor except the emergency showers and eye washes. R.P.s must be located outside of the lab.
Routing - PUBLIC WORKS11/18/2009 11/23/2009 PASS
DetailsConnie Baumgartner
Routing PW Sewer Rating11/23/2009 11/23/2009 PASS
DetailsConnie Baumgartner
Routing - Addressing11/19/2009 11/19/2009 PASS
DetailsApril Wing
Pending Assignment by JCB11/17/2009 11/18/2009 DONE
DetailsJason Blais
Application received 11/17/200911/17/2009 DONE
DetailsTisha Gallop
Plans ACCEPTED BY PLAN TECH  11/17/2009 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  11/17/2009 DONE
DetailsTisha Gallop
Routing - PLUMBING1/8/2010 1/8/2009 PASS
DetailsBill VanDegrift
New Sheets M1.0 & M1.1 inserted into plans. per plans and 2003 upc