Second Notice | | 2/14/2011 | 2/7/2011 | | DONE |
|
|
|
This permit finaled on the web by Brandon Byington
|
First Notice | 2/1/2011 | 2/1/2011 | 2/4/2011 | | DONE |
Tom Arcoraci
|
|
|
|
BLD-Final | 2/1/2011 | 2/1/2011 | 2/1/2011 | P | PASS |
Tom Arcoraci
|
|
|
cecil Phone #: ###-####
|
DOC - Permit Finaled | 2/1/2011 | 2/1/2011 | 2/1/2011 | P | PASS |
Tom Arcoraci
|
|
|
|
FIRE-Final Inspection | 2/1/2011 | 2/1/2011 | 2/1/2011 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
FIRE-Final Inspection | 12/16/2010 | 12/16/2010 | 12/16/2010 | P | FAIL |
Troy Cobbley
|
|
|
Life safety will be ok to pass when the project related fire alarm permit has been addressed.
|
BLD-Framing/Rough-in | 11/15/2010 | 11/15/2010 | 11/15/2010 | P | PASS |
Tom Arcoraci
|
|
|
cecil Phone #: ###-####
|
BLD-Conference | 9/21/2010 | 9/22/2010 | 9/22/2010 | A | PASS |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 9/21/2010 | 9/21/2010 | 9/21/2010 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 7/19/2010 | 7/19/2010 | 7/20/2010 | | PART |
Tom Arcoraci
|
|
|
work in progress ok
|
BLD-Final | 5/19/2010 | 5/19/2010 | 5/19/2010 | P | PART |
Tom Arcoraci
|
|
|
Cecil Phone #: ###-#### phase 2 ok
|
FIRE-Final Inspection | 5/18/2010 | 5/18/2010 | 5/18/2010 | P | PART |
Troy Cobbley
|
|
|
The life safety for phase two passed.
|
BLD-Final | 4/8/2010 | 4/9/2010 | 4/9/2010 | A | PART |
Tom Arcoraci
|
|
|
cecil Phone #: ###-####
|
FIRE-Final Inspection | 4/7/2010 | 4/8/2010 | 4/8/2010 | A | PART |
Troy Cobbley
|
|
|
The phase 1 fire life safety is passed.
|
Override - People Holds | | | 4/7/2010 | | |
|
|
|
|
Override - People Holds | | | 1/19/2010 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 1/19/2010 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 1/5/2010 | | 1/8/2010 | | PASS |
Dan Stuart
|
|
|
Received Idaho Enginner Stamped Design calcs and legible detail for door clearance requirements and attached to plans. Inserted new plan sheets M1.0 & M1.1 for plumbing re-review. Routing to plumbing plan review.
|
Routing - PLAN CHECK | 1/8/2010 | | 1/8/2010 | | PASS |
Dan Stuart
|
|
|
To permit desk to issue.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/8/2010 | | PASS |
|
|
|
|
Inspection Record Card- Bld | | | 1/8/2010 | | DONE |
|
|
|
|
Telephone call | | | 1/8/2010 | | DONE |
|
|
|
called David permit ready and fee given 1-8-10 dld
|
Override - People Holds | | | 1/8/2010 | | |
|
|
|
|
Permit Ready to Issue | | | 1/8/2010 | | DONE |
|
|
|
|
Plan assigned to (DRS) | 11/18/2009 | | 1/8/2010 | | PASS |
Dan Stuart
|
|
|
1/8/2010 11:20:48 DRS - activity updated through activity BLDA022 from case BLD09-02069.
|
Plan resubmittals received | | | 1/7/2010 | | |
Tisha Gallop
|
|
|
received two copies of plan sheets M1.0, M1.1; taken to Dan Stuart
|
Plan Reviewer's activity | | | 1/6/2010 | | DONE |
|
|
|
I had called Ralph Evans and left a voice message on 1/5/10 asking that he call me. I tried to call his cell phone on 1/6/10 but no answer. I e-mailed him a copy of remaining Building Code details needed and second failure of plumbing review, giving him phone numbers to call, me and Bill Vandegrift, if he had questions.
|
Routing - PLUMBING | 1/5/2010 | | 1/5/2010 | | FAIL |
Bill VanDegrift
|
|
|
Resubmitted Sheets M1.0 & M1.1 did not address required code corrections. Called mechanical Engineer to review needed items.
|
Routing - PLAN CHECK | 12/17/2009 | | 1/4/2010 | | FAIL |
Dan Stuart
|
|
|
Inserted new mechanical plan sheets of 12/29/09 into plans and re-reouted back for plumbing re-review. Resubmittals did not address IBC Plan Review of 12/15/09.
|
Plan resubmittals received | | | 12/29/2009 | | |
Dan Stuart
|
|
|
rec'd two copies of sheets M1.0 and M1.1; taken to Dan S
|
Routing - FIRE | 12/15/2009 | 12/15/2009 | 12/17/2009 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
Telephone call | | | 12/17/2009 | | DONE |
|
|
|
Talked with Mr. Evans to make sure he received the plan review; to let him know I will be off for two weeks (back Jan 4, 2010) and to see if he could have resubs to me tommorrow so I can approved my part. Plumbing failed review so that also needs to be addressed.
|
1st review completed | | | 12/17/2009 | | FAIL |
|
|
|
Failed Plumbing, Plan Check
|
Route to Impact Fee Review | 12/15/2009 | 12/18/2009 | 12/15/2009 | | PASS |
Cindy M. Gould
|
|
|
Tenant improvement no impact fees
|
Routing - PLAN CHECK | 11/27/2009 | | 12/15/2009 | | FAIL |
Dan Stuart
|
|
|
Copy of plan review e-mailed to architect. Plans routed for fire code analyst.
|
Routing - PLUMBING | 11/23/2009 | | 11/27/2009 | | FAIL |
Bill VanDegrift
|
|
|
all water serving fixtures in the lab area must be protected by a reduced pressure backflow preventor except the emergency showers and eye washes. R.P.s must be located outside of the lab.
|
Routing - PUBLIC WORKS | 11/18/2009 | | 11/23/2009 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Sewer Rating | 11/23/2009 | | 11/23/2009 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 11/19/2009 | | 11/19/2009 | | PASS |
April Wing
|
|
|
|
Pending Assignment by JCB | 11/17/2009 | | 11/18/2009 | | DONE |
Jason Blais
|
|
|
|
Application received | | 11/17/2009 | 11/17/2009 | | DONE |
Tisha Gallop
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 11/17/2009 | | DONE |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/17/2009 | | DONE |
Tisha Gallop
|
|
|
|
Routing - PLUMBING | 1/8/2010 | | 1/8/2009 | | PASS |
Bill VanDegrift
|
|
|
New Sheets M1.0 & M1.1 inserted into plans. per plans and 2003 upc
|